Wagners Holding Company Limited Overview
FY25 figure is IBISWorld's (includes all controlled entities) and may not be definitionally comparable to the company's FY26 annual-report figure of 732; the apparent decline is directionally consistent with the completion of two bulk-haulage contracts and lower Project Services activity, but the company has not explained the movement.
Wagners is a Toowoomba-founded, family-controlled, vertically integrated construction-materials group whose economic engine is South-East Queensland (SEQ). It is one of the region's largest cement suppliers — the company states it meets roughly one-third of SEQ's cement requirement from its Pinkenba operation at the Port of Brisbane — and it has deliberately pulled that cement through a fast-growing network of company-owned ready-mix plants, its own hard-rock quarries and reinforcing-steel processing. Around this core it runs a cyclical Project Services arm (bulk haulage for mines, mobile concrete and crushing, precast) and a genuinely differentiated technology business, Composite Fibre Technologies (CFT), which pultrudes fibre-reinforced polymer crossarms, power poles, bridges and marine piles in Wellcamp and Cresson, Texas. FY26 was a breakout year — revenue A$503.9m, operating EBIT A$67.2m, NPAT A$40.6m, net bank debt near zero — leaving Wagners positioned as a mid-cap levered play on Brisbane 2032 and grid-hardening.
Company's own description (latest annual report, paraphrased)
In its FY26 Annual Report, Wagners describes itself as an ASX-listed, diversified provider of construction materials and services operating globally, established in Toowoomba in 1989. Its construction materials and project services segments are complemented by the Composite Fibre Technologies business, and it characterises itself as an innovative, vertically integrated producer of both traditional and sustainable construction materials and a supplier of project-specific products and services. The Directors' Report defines principal activities as (i) construction materials and services — cement, flyash, aggregates, ready-mix concrete, precast concrete products and reinforcing steel, plus project-specific mobile and on-site concrete batching, contract crushing and haulage; and (ii) new generation building materials, provided mostly through CFT. The corporate tagline is "Innovative • Integrated • International", and its guiding principles spell the acronym "IT'S FAIR" (Integrity, Together, Safe, Family, Require quality, Acknowledge success, Innovation).
Business model and revenue model
| Revenue type (FY26 Annual Report, Note 3) | FY25 (AUD Mn) | FY26 (AUD Mn) | FY26 % of total |
|---|---|---|---|
| Sale of goods | 334.8 | 397.5 | 78.9% |
| Provision of services | 96.5 | 106.4 | 21.1% |
| Total revenue from contracts with customers | 431.3 | 503.9 | 100% |
Wagners earns revenue almost entirely from product sales and contracted services; there is no subscription or licensing revenue of significance today (EFC licensing, once a stated ambition, has been wound back — see §5 and §13).
Revenue-recognition profile (FY26 Annual Report, Note 3(c)): A$479.7m (95.2%) is recognised at a point in time (material delivered or service performed on site); A$24.2m (4.8%) is recognised over time, almost all from fixed-price CFT custom-build contracts measured on labour-hours/cost inputs. Payment terms are typically 30 days from month-end for materials and 30–60 days for services.
Value-chain position
Wagners spans the heavy-materials value chain more completely than most mid-caps:
-
Upstream inputs — cement manufacture at Pinkenba (the company has flagged exposure to global clinker and shipping costs, implying reliance on imported clinker — FY26 earnings call commentary per Investing.com), flyash supply, and Wagners-owned hard-rock quarries.
-
Intermediate processing — reinforcing-steel processing (Brisbane plant commissioned FY23), precast manufacture (relocating from Wacol to Wulkuraka).
-
Downstream delivery — fixed ready-mix plants (nine operating in SEQ at Dec 2025), mobile/on-site batching, haulage fleet (60 prime movers / 180 trailers across 10 bulk-haulage projects in FY24).
-
Technology/manufactured products — CFT pultrusion (Wellcamp, QLD; Cresson, Texas).
The strategic logic, made explicit in every results deck since FY23, is that each new company-owned concrete plant raises internal cement and aggregate throughput, lifting utilisation of fixed-cost assets upstream. FY26 evidenced this: cement volumes sold to Wagners-owned concrete plants rose 67% while total cement volumes rose 11% (FY26 results presentation via Investing.com).
Customer types and end-markets
Customers: leading domestic and international construction-material providers (including competitors buying cement), builders and construction companies, infrastructure contractors, mining companies and general contractors (FY25/FY26 presentations, "Who is Wagners?"). Electricity distribution utilities in Queensland, NSW and New Zealand (CFT crossarms and poles), and — from FY26 — an initial Californian utility customer for poles.
Customer concentration: one external CM customer accounted for 10% of external revenue in FY26 (11% in FY25) (FY26 Annual Report, Note 2). The customer is not named.
End-markets: residential, industrial, infrastructure, resources and renewables (CM segment description); resources/mining haulage (Project Services); electricity distribution, pedestrian/marine infrastructure (CFT).
Independent characterisation
Analytically, Wagners is best understood as three businesses with very different economics under one family-controlled roof:
-
A regional quasi-oligopolistic cement-and-aggregates franchise (CM: 65% of FY26 revenue, 17.1% segment EBIT margin), whose margin trajectory since FY23 (9.1% → 17.1%) reflects SEQ demand, pricing discipline and the vertical-integration flywheel. This is the valuation anchor.
-
A lumpy contracting business (Project Services: 16% of revenue) whose revenue halved between FY24 and FY26 as the Sydney Metro precast contract and several haulage contracts rolled off, but whose margins have been repaired (9.9% FY26).
-
A high-growth, increasingly profitable advanced-materials manufacturer (CFT: 19% of revenue, 19.4% margin in FY26 after years of losses), which is the most likely source of rerating optionality and the least well understood by the market.
The equity story is therefore not "a cement company" but "an SEQ cement franchise with an embedded composites growth option," held within a governance structure (family chair, related-party property leases) that some institutions will discount.
Strategy
Stated corporate strategy (FY26 Annual Report, Directors' Report — paraphrased)
Wagners frames future growth around three pillars:
-
Grow the vertically integrated Construction Materials and Services business in Australia by expanding the SEQ concrete plant and quarry networks, subject to market conditions.
-
Grow CFT through product development, focused marketing and sales, and expansion of product offerings and manufacturing facilities domestically and internationally.
-
Pursue major project opportunities in Australia and internationally.
Recurring strategic themes in the FY24–FY26 decks: "well-invested, high-quality asset base — difficult to replicate"; "vertical integration enabling security of supply and increased margins"; "agility & independence"; "culture of innovation"; and "expansion & consolidation opportunities." Capital allocation is subject to stated "ROIC considerations" and "clear return on capital benchmarks" (FY24 Strategy Update). Wagners does not hold a formal investor day; strategy is communicated through half-yearly results presentations and AGM addresses.
Strategic initiative register (last 24 months)
| Initiative | Timing | Detail | Status | Source |
|---|---|---|---|---|
| SEQ concrete plant network expansion | FY24–FY28 | 7 plants (Aug 2024) → 9 (Dec 2025); Caboolture under construction; Rocklea in planning; west-of-Brisbane site under contract; more sites secured; ~A$15m land bought FY25; A$7.7m of H1 FY26 capex on fixed plants | Executing | FY24–FY26 presentations |
| Yatala land acquisition from related party | FY26 | Lease terminated and land at 51 Computer Road bought at independent valuation of A$6.49m | Complete | FY26 AR |
| Pinkenba cement plant upgrades | FY26–FY27 | Capacity and efficiency upgrades; major maintenance shutdown Jan 2026 | Executing | H1 FY26 presentation |
| Quarry network expansion | FY26–FY27 | Prior Wellcamp quarry plant investment; further expansion flagged | Executing | H1 FY26 presentation |
| CFT capacity expansion (Wellcamp & Cresson) | FY26–FY27 | "Immediate investment in capacity" to meet pole demand; US pole production capability added | Executing | FY26 AR; FY26 results |
| CFT USA turnaround | FY24–FY26 | FY24 "right-sizing"; business development in targeted markets; first positive EBIT in FY26 | Achieved | FY24–FY26 presentations |
| New precast facility, Wulkuraka | FY25–FY27 | Replacement for Wacol; early works complete; positioned for Olympic infrastructure | Early works | FY26 AR |
| Bulk haulage fleet renewal and contract re-pricing | FY25–FY27 | Renewed fleet cut repairs and maintenance; two extensions to 2030 at improved rates | Executing | H1 FY26; FY26 results |
| Three-year significant capital investment programme | FY27–FY29 | Group-wide capacity and efficiency investment, "investing ahead of demand"; benefits may not be fully realised in FY27 | Announced | FY26 AR MD's update |
| A$30m equity placement | Sep 2025 | At A$2.60 to fund capex; existing and new institutions | Complete | ASX 8 Sep 2025 |
| Refinancing | Dec 2025 | A$170m NAB/HSBC facilities to Jul 2028 | Complete | FY26 AR |
| EFC wind-back | FY23–FY25 | Capex paused, costs cut, A$5.6m impairment, segment discontinued | Complete | FY23–FY25 presentations |
| ESG framework | FY24 onwards | Seven priority topics; climate-related disclosures; sustainability report with auditor review in FY26 AR | Ongoing | FY24 presentation; FY26 AR |
Management guidance and medium-term targets
FY26 guidance history: AGM (Nov 2025) — H1 operating EBIT A$31–33m; full year ~A$52–56m → upgraded at H1 (Feb 2026) to A$62–66m → actual A$67.2m.
FY27: qualitative only at the FY26 result — H2 FY26 conditions expected to continue; volume growth in CM; margin expansion from plant utilisation; cement margins likely to be squeezed by higher raw-material input costs; rising CFT pole demand domestically and internationally; improved bulk-haulage earnings. No numerical FY27 earnings guidance had been published as at 18 Oct 2026; the AGM on 12 Nov 2026 has historically been the venue for first-half guidance.
Medium-term financial targets: none publicly quantified (no stated ROIC, margin or leverage targets beyond covenant compliance and "return on capital benchmarks").
Products & Services
Wagners does not publish list prices or detailed product specifications in its statutory reports; pricing models below reflect disclosed revenue-recognition and contracting practice.
Construction Materials
| Product / service | Description & capabilities | Target customers | Launch / latest milestone | Pricing model (as disclosed) |
|---|---|---|---|---|
| Cement (bulk and bagged) | Manufactured at Pinkenba (Port of Brisbane); company states it supplies ~one-third of SEQ cement demand; Pinkenba facility upgrades included in FY26–FY27 capex plan; major maintenance shutdown early Jan 2026 | Third-party concrete producers, precasters, Wagners' own concrete plants, builders | Ongoing; capacity upgrade programme FY26–FY28 | Per-tonne supply; point-in-time revenue; pricing actions cited as FY25 margin driver |
| Flyash | Supplementary cementitious material marketed alongside cement | Concrete producers | Long-standing | Per-tonne |
| Lime | Listed by IBISWorld within "Cement, Flyash & Lime" operating unit; not separately discussed in FY26 reports | Industrial/construction | — | — |
| Ready-mix concrete | Fixed plants in SEQ (9 operating at Dec 2025 incl. Yatala, Slacks Creek, Wulkuraka; Caboolture under construction; Rocklea in planning; a further site west of Brisbane under contract) plus mobile/site batch plants covering remote/regional locations | Residential builders, commercial and infrastructure contractors | Slacks Creek Sep 2025; Wulkuraka Dec 2025; Caboolture expected CY2026 | Per-cubic-metre; strict pricing policy introduced FY23 |
| Aggregates (crushed rock) | From Wagners-owned quarries, including Wellcamp (Toowoomba) quarry, where plant investment was made in FY25 | Concrete, roads, civil contractors | Capacity investment FY25; quarry network expansion in FY26–FY27 capex | Per-tonne |
| Reinforcing steel | Manufacture and supply of reinforcing steel products; Brisbane processing plant commissioned FY23 | Builders, precasters, contractors | FY23 | Per-tonne / per-order |
| Precast concrete products | Listed among CM key products in the segment note; major precast work is reported within Project Services | Contractors | — | Per-order |
Project Services
| Service | Description & capabilities | Target customers | Latest status | Contract model |
|---|---|---|---|---|
| Bulk haulage | Road-train haulage for mines; 60 prime movers and 180 trailers across 10 projects in FY24; current work in North-West Queensland and Northern Territory | Mining companies | Two projects completed (end of mine life) H1 FY26; two extensions secured to 2030; company says long-term projects secured will deliver consistent earnings for five years; fleet renewal reduced repairs and maintenance | Medium-to-long-term contracts; point-in-time recognition as services performed |
| Mobile concrete services | On-site batching for remote infrastructure, renewables and resources | EPC contractors, wind-farm builders | Central Queensland wind-farm work ongoing FY26 | Project contract |
| Contract crushing | On-site mobile crushing | Mines, civil projects | Pursuing new opportunities | Project contract |
| Precast concrete | Tunnel segments, bridge and overpass elements; delivered >70,000 Sydney Metro tunnel segments from Wacol (completed Q3 FY24) | Tier-1 infrastructure contractors | Wacol exited 31 May 2025; new company-owned facility at Wulkuraka under early works, targeting Olympic and SEQ infrastructure | Fixed-price project supply |
| Engineering solutions | Listed by IBISWorld as a CMS business line; capex in H1 FY26 included engineering solutions equipment | Internal and external | — | — |
Composite Fibre Technologies
| Product line | Description | Target customer | Latest milestone | Pricing model |
|---|---|---|---|---|
| Electrical crossarms | Composite crossarms for distribution networks; automated crossarm line delivered efficiency gains from FY24 | Utilities in QLD, NSW, New Zealand | FY26 crossarm sales +18%, driven by NZ | Supply contracts; point-in-time |
| Composite power poles | Distribution poles installed in QLD, NSW and NZ networks; long-term NSW/QLD supply contracts signed Q4 FY24; ~8,000 poles sold in H1 FY26 (+320%); initial orders from a Californian utility in FY26; US pole production capability invested | Electricity distribution utilities (ANZ, USA) | FY26 pole sales +206%; capacity being expanded in Wellcamp and Cresson | Supply contracts; point-in-time |
| Pedestrian infrastructure (bridges, boardwalks, walkways) | Pre-engineered and custom FRP bridges and boardwalks; e.g. award-winning 6km Ballina–Lennox Head walkway (IPWEA award, 2017) | Councils, state agencies, US municipalities | >300 projects delivered FY26 at improved margins | Fixed-price custom build; over-time recognition |
| Marine piles and marine structures | FRP piles and piers resistant to chloride attack | Ports, marinas, US coastal agencies | Increasing US demand cited in FY26 | Project-based |
| Road bridges / custom build | Larger engineered structures | Road authorities | A ~A$3.0m loss on an NZ custom-build project in FY24 led to tighter project selection | Fixed-price; over-time |
| Light poles | Cited in the Cresson plant launch materials | US municipalities | — | — |
General capabilities (FY25/FY26 presentations): light-weight, non-corrosive, non-conductive composite members designed and manufactured in-house on custom pultrusion machines (seven machines cited in FY23); engineered to eliminate the variability of steel (rust) and timber (rot); marketed with a 100-year design life for structural members (Cresson project announcement, 2021); dedicated global sales and business-development teams.
Earth Friendly Concrete (legacy/new generation building material)
| Product | Description | Status |
|---|---|---|
| Earth Friendly Concrete (EFC) | Geopolymer binder system based on chemically activated flyash and slag, with no Portland cement clinker; marketed as cutting embodied carbon by ~250kg CO2 per m³ (~70%) with superior durability in sewerage, chloride and heavy-pavement applications | Wound back from FY23; A$5.6m impairment H1 FY24; no longer a reported segment; UK licensing/production arrangements (Capital Concrete; Romford plant plans) — current status not disclosed |
| Earth Friendly Shotcrete (EFS) | Sprayed EFC variant, described as a world first; used commercially for a Queensland swimming pool | Launched |
Financial Narrative
Income statement
Sources: FY26 AR five-year table (revenue, NPAT, basic EPS, dividends); FY23 presentation (FY22–FY23 gross profit, EBITDA, EBIT); FY24 presentation (FY24 as originally reported); FY25 presentation and FY26 AR (FY25–FY26). Restatement note: the FY25 presentation restated FY24 operating EBITDA to A$65.7m and operating EBIT to A$38.3m (now including A$1.4m EFC losses) and gross profit to A$140.6m; the FY26 AR five-year table shows FY24 operating EBIT as A$39.678m. FY23 revenue appears as A$475.1m (FY23 deck table), A$477.3m (FY23 deck headline) and A$475.452m (FY26 AR) on differing bases.
Margins and growth
Revenue CAGR FY22–FY26: 10.6% p.a. (A$336.9m → A$503.9m). Operating EBIT CAGR FY22–FY26: 33.1% p.a. (A$21.4m → A$67.2m). NPAT CAGR FY22–FY26: 51.6% p.a.
Commentary. The five-year record has two distinct phases. FY22–FY23 was volume-led but margin-destructive: revenue jumped 41% in FY23 on the Sydney Metro precast contract, higher bulk-haulage activity and cement volumes, yet gross margin fell five points to 25.2% because of input-cost inflation, elevated repairs and maintenance, driver shortages and EFC/CFT USA losses; NPAT fell to A$3.1m. The FY23 strategic review (cost-out, capex triage, a strict concrete pricing policy and the EFC wind-back) marks the inflection. From FY24 the mix shifted decisively toward CM, where margins rose from 9.1% to 17.1% in three years. FY25's 10% revenue decline was a mix effect (the precast tunnel contract's completion), not a demand problem — operating EBIT still grew 9%. FY26 combined both levers: 28% CM growth with operating leverage, and CFT turning into a high-margin contributor. Notably, D&A fell from A$28.1m (FY23) to A$21.8m (FY26) as older haulage assets fully depreciated and Wacol was exited — a tailwind to EBIT that will reverse as the announced three-year capex programme lands. Finance costs fell 28% between FY24 and FY26 with debt reduction.
Balance sheet
Sources: FY23, FY24, FY25 presentations (cash, gross debt, net debt, NWC); FY26 AR balance sheet and Notes 11, 14, 15; FY24 equity and lease liability from FY26 AR opening balances (1 Jul 2024). FY26 NWC derived on company definition (receivables 76.5 + inventories 38.6 – payables 63.9 – current tax 12.3). No goodwill is carried; intangibles are licences.
Balance sheet commentary. Wagners has executed a near-complete deleveraging of bank debt — from A$104.7m at June 2023 to A$21.4m at June 2026 — through working-capital release (FY24), improved cash generation (FY25–FY26) and the A$28.7m net placement (FY26). The finance facility drawn balance fell from A$42.5m to A$6.0m in FY26; the remaining debt is mostly equipment-specific chattel mortgages (A$15.4m). However, a balanced view must emphasise lease liabilities of A$126.9m, of which A$91.0m relates to properties leased from Wagner family-related entities (FY26 AR remuneration report, section 9). On a lease-inclusive basis, net debt is A$127.7m, or 1.4x operating EBITDA — still conservative, but materially different from the "net cash" headline. Equity is depressed by a large A$354.6m "pre-IPO distributions to related entities" reserve — a legacy of the 2017 restructure in which IPO proceeds were paid to the founding family — which mechanically flatters ROE.
Cash flow
FY23 and FY24 OCF/capex per FY24 presentation; the FY23 deck reported FY23 OCF of A$35.4m and FY22 A$17.5m on a pre-interest/tax "EBITDA less working capital" basis, not comparable with statutory OCF, so FY22 statutory OCF and capex are left blank (FY22 net capex was A$23.6m on that basis). FY26 net debt repayment = repayments A$49.9m less drawdowns A$14.2m. Sources: FY24–FY26 presentations; FY26 AR cash flow statement.
Cash flow commentary. Two features stand out. First, tax normalisation: income tax paid jumped from A$2.4m to A$18.2m in FY26 as historical tax losses and timing benefits were exhausted, which is why FY26 OCF grew only 14% despite EBITDA growth of 35%. Second, capex is stepping up structurally: from A$15.2m (FY23) to A$51.2m (FY26), and management has flagged a "significant capital investment program" over the next three years for concrete plants, Pinkenba upgrades, quarry expansion, CFT capacity and haulage fleet. FY26 capex of A$51.2m included A$31.1m of assets under construction (FY26 AR Note 9). FCF will therefore likely remain compressed in FY27 even as earnings grow. Cash conversion of EBITDA to pre-capex OCF was 71% in FY26 (63.1/89.0), versus 84% in FY25 including tax and interest (company-stated).
Ratios
All ratios are analyst calculations from the figures above. ROIC uses a notional 30% tax rate and year-end invested capital. CCC = DSO (trade receivables / revenue × 365) + DIO (inventories / statutory COGS × 365) – DPO (trade payables / COGS × 365): FY26 ≈ 53 + 53 – 40 = 66 days; FY25 ≈ 48 + 67 – 33 = 82 days. Simply Wall St reports FY26 debt/equity of 9.8% and EBIT interest cover of 8.2x on its own definitions, consistent with these calculations. TipRanks reported ROIC of ~13% (definition not stated).
Ratio commentary. Returns have crossed above any reasonable cost of capital only in FY26 (ROIC ~13.6%). The improvement is earnings-driven, not asset-light: PP&E grew 18.5% in FY26 to A$210.2m. Liquidity is adequate, with the current ratio of 1.3x supported by an undrawn portion of the A$170m facility. The working-capital cycle has shortened materially, chiefly from leaner inventory (raw materials down A$3.2m in FY26) against 17% revenue growth.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Income Statement and Per-Share Data
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | 336.9 | 475.5 | 481.6 | 431.3 | 503.9 |
Gross profit — company non-IFRS (AUD Mn) | 102.4 | 119.6 | 140.5 | 139.9 | 164.2 |
Operating EBITDA (AUD Mn) | 45.7 | 50.0 | 66.8 | 66.1 | 89.0 |
Operating EBIT (AUD Mn) | 21.4 | 21.9 | 39.7 | 41.8 | 67.2 |
Reported EBIT (AUD Mn) | 20.9 | 17.0 | 29.5 | 44.0 | 67.2 |
Net finance costs (AUD Mn) | — | — | 12.7 | 11.4 | 9.1 |
Pre-tax income (AUD Mn) | — | — | 16.8 | 32.6 | 58.1 |
Net income / NPAT (AUD Mn) | 7.7 | 3.1 | 10.3 | 22.7 | 40.6 |
EPS basic (A$ cents) | 4.1 | 1.7 | 5.4 | 12.1 | 20.5 |
EPS diluted (A$ cents) | — | — | — | 11.8 | 20.1 |
Dividend declared per share (A$ cents) | 0 | 0 | 2.5 | 3.2 | 5.0 |
Margin Analysis (%)
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Gross margin (%) | 30.4 | 25.2 | 29.2 | 32.4 | 32.6 |
Operating EBITDA margin (%) | 13.6 | 10.5 | 13.9 | 15.3 | 17.7 |
Operating EBIT margin (%) | 6.4 | 4.6 | 8.2 | 9.7 | 13.3 |
Net margin (%) | 2.3 | 0.7 | 2.1 | 5.3 | 8.0 |
Revenue growth YoY (%) | — | 41.1 | 1.3 | -10.4 | 16.8 |
Balance Sheet and Per-Share Data
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | — | — | — | 417.6 | 457.4 |
Cash & equivalents (AUD Mn) | 12.2 | 11.4 | 18.7 | 23.0 | 20.6 |
Bank & chattel debt — total (AUD Mn) | 94.3 | 104.7 | 66.3 | 57.0 | 21.4 |
Debt — current portion (AUD Mn) | — | — | — | 8.0 | 9.6 |
Debt — non-current portion (AUD Mn) | — | — | — | 49.1 | 11.7 |
Net debt ex-leases (AUD Mn) | 82.1 | 93.4 | 47.6 | 34.0 | 0.8 |
Lease liabilities (AUD Mn) | — | — | 136.6 | 132.2 | 126.9 |
Net debt incl. leases (AUD Mn) | — | — | 184.2 | 166.2 | 127.7 |
Total equity (AUD Mn) | — | — | 134.6 | 154.5 | 217.6 |
Goodwill & intangibles (AUD Mn) | — | — | 2.0 | 1.9 | 1.8 |
Net working capital — company definition (AUD Mn) | 55.9 | 73.8 | 49.1 | 36.7 | 38.9 |
NTA per share (AUD) | — | — | — | 0.81 | 1.08 |
Cash Flow
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Operating cash flow — statutory (AUD Mn) | — | 16.8 | 72.6 | 55.5 | 63.1 |
Capex — PP&E purchases (AUD Mn) | — | 15.2 | 23.9 | 36.6 | 51.2 |
Free cash flow — OCF less capex (AUD Mn) | — | 1.6 | 48.7 | 18.9 | 11.9 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 4.7 | 6.0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net equity issued (AUD Mn) | 0 | 0 | 0 | 0 | 28.7 |
Net debt repayment (AUD Mn) | — | -0.2 | 38.5 | 9.3 | 35.7 |
Income tax paid (AUD Mn) | — | — | 0.5 | 2.4 | 18.2 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
ROE (%, avg equity) | — | — | — | 15.7 | 21.8 |
ROA (%, avg assets) | — | — | — | — | 9.3 |
ROIC (%, op. EBIT × 0.7 / (equity + net debt + leases)) | — | — | — | 9.1 | 13.6 |
Current ratio (x) | — | — | — | 1.40 | 1.29 |
Bank debt / equity (%) | — | — | 49.3 | 36.9 | 9.8 |
Debt incl. leases / equity (%) | — | — | 150.7 | 122.5 | 68.2 |
Net debt ex-leases / op. EBITDA (x) | 1.80 | 1.87 | 0.71 | 0.51 | 0.01 |
Net debt incl. leases / op. EBITDA (x) | — | — | 2.76 | 2.51 | 1.43 |
Interest coverage — op. EBIT / net finance costs (x) | — | — | 3.1 | 3.7 | 7.4 |
Asset turnover (x, revenue / avg assets) | — | — | — | — | 1.15 |
Cash conversion cycle (days, approx.) | — | — | — | 82 | 66 |
Region revenue (AUD Mn)
| Region revenue (AUD Mn) | FY25 | FY26 |
|---|---|---|
Australia | 421.8 | 489.8 |
United States | 4.5 | 8.9 |
New Zealand | 4.8 | 5.3 |
United Kingdom | 0.2 | 0.0 |
Region growth (%) | FY26 vs FY25 | — |
Australia | 16.1 | — |
United States | 97.0 | — |
New Zealand | 9.1 | — |
United Kingdom | -91.8 | — |
Revenue by Region
| Metric | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|
CFT USA revenue (AUD Mn) | 5.2 | 2.1 | 4.5 | 8.9 |
CFT USA operating EBIT (AUD Mn) | -2.5 | -4.2 | -1.0 | — |
Segment Overview
| Segment | Australia | United States | New Zealand | United Kingdom | Total |
|---|---|---|---|---|---|
Construction Materials | 328.2 | 0 | 0 | 0 | 328.2 |
Project Services | 82.2 | 0 | 0 | 0 | 82.2 |
CFT | 79.4 | 8.9 | 5.3 | 0 | 93.5 |
Other | 0 | 0 | 0 | 0.01 | 0.01 |
Share Price
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Share price at 30 June (AUD) | 1.11 | 0.80 | 0.77 | 2.29 | 4.77 |
Share Price History
| Period | Start price (AUD) | End price (A$, 17 Oct 2026) | Return |
|---|---|---|---|
~1 year (vs Sep 2025 placement price) | 2.60 | 4.64 | +78% |
FY26 (30 Jun 2025 → 30 Jun 2026) | 2.29 | 4.77 | +108% |
~3 years (30 Jun 2023 →) | 0.80 | 4.64 | +480% |
~4.3 years (30 Jun 2022 →) | 1.11 | 4.64 | +318% |
Since IPO (Dec 2017 offer price) | 2.71 | 4.64 | +71% |
Valuation Multiples
| Multiple | Wagners | Basis |
|---|---|---|
Market capitalisation | A$931.6m | — |
Enterprise value (ex-leases) | A$932.4m |
|
Enterprise value (incl. leases) | A$1,059.3m |
|
P/E (trailing, basic) | 22.6x | EPS 20.5c |
EV/EBITDA (lease-consistent) | 11.9x | EV incl. leases / op. EBITDA A$89.0m |
EV/EBIT (lease-inclusive EV) | 15.8x | / op. EBIT A$67.2m |
EV/Sales | 2.1x (incl. leases); 1.85x (ex-leases) | Revenue A$503.9m |
P/B | 4.3x | Equity A$217.6m |
P/NTA | 4.3x | NTA A$1.08/share |
Dividend yield | 1.1% | 5.0c fully franked |
Per-Share Data and Returns & Leverage Ratios (%)
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
DPS declared (A$ cents, fully franked) | 0 | 0 | 2.5 | 3.2 | 5.0 |
Payout ratio (% of basic EPS) | 0 | 0 | 46.3 | 26.4 | 24.4 |
Dividend
| Dividend | Ex-date | Payment date | Amount | Franking |
|---|---|---|---|---|
FY24 final | 28 Aug 2024 | 16 Oct 2024 | 2.5c | 100% |
FY25 final | 9 Sep 2025 | 8 Oct 2025 | 3.2c | 100% |
FY26 final | 31 Aug 2026 | 1 Oct 2026 | 5.0c | 100% |
Capital Instruments
| Instrument | Amount (AUD Mn) | Maturity / terms |
|---|---|---|
Finance facility (drawn) | 6.0 | NAB/HSBC club facility, A$170m combined limit, expiring July 2028; BBSW plus margin; quarterly covenants (fixed-charge cover, debt/EBITDA, capitalisation) |
Chattel mortgages — current | 9.6 | Within 12 months |
Chattel mortgages — non-current | 5.7 | 1–5 years (equipment-specific) |
Lease liabilities — current | 8.5 | Within 12 months |
Lease liabilities — non-current | 118.5 | Long-dated property leases, largely with related parties |
Assets pledged as security | 20.4 | — |
Analyst Conclusions
Management guidance (FY27)
Qualitative only, as at 18 October 2026: H2 FY26 conditions expected to persist; CM volumes and margins to grow with Olympic, infrastructure and residential demand and new plants; cement margins exposed to higher raw-material input costs; CFT pole and crossarm demand rising in ANZ and new markets; continued CFT USA improvement; better bulk-haulage earnings from improved contract terms and lower maintenance; a significant three-year capex programme whose benefits will build progressively. No quantitative FY27 EBIT range has yet been given; the AGM on 12 November 2026 is the likely first opportunity.
Consensus expectations
Consensus coverage is thin (effectively one published target, A$5.00). Third-party modelling assumes ~10.5% p.a. revenue growth over three years. Applying that growth to FY26 revenue implies roughly A$557m in FY27 — an analyst illustration, not a published consensus figure.
Bull case
-
Operating leverage has further to run. CM margins rose 800bps in three years; as Caboolture, Rocklea and further sites open, internal cement pull-through (already +67% in FY26) and quarry utilisation should keep margins expanding, with Olympic construction peaking FY28–FY31.
-
CFT is becoming a second growth engine worth separate valuation. Revenue +36% at a 19.4% margin, a profitable US business, initial Californian utility orders and capacity additions in two countries suggest CFT could plausibly approach the scale of the current CM EBIT contribution over time if North American pole adoption accelerates.
-
Capacity to invest without balance-sheet strain. Near-zero bank debt and A$170m of facilities fund the capex programme internally, while family sell-downs have widened the free float and drawn in institutions (Perpetual at 6.1%) — improving liquidity and index eligibility.
Bear case
-
Peak-margin and input-cost risk. Management has already flagged cement margin pressure from clinker, shipping and FX for FY27, while the derived H2 FY26 EBIT (~A$32m) was slightly below H1 (A$35m) — a sign that the run-rate may be plateauing just as D&A rises with capex.
-
FCF and valuation mismatch. At 22.6x trailing earnings and ~12x lease-adjusted EV/EBITDA, the stock prices in growth, yet FCF was only A$11.9m in FY26 and will be pressured by a multi-year capex programme and normalised tax payments.
-
Governance and overhang. A non-independent chair, related-party leases (A$91m) and royalties, and founder sales of ~44m shares in seven months leave a ~30% family bloc whose future selling could cap the share price; LTI hurdles set well below the current price weaken pay-for-performance alignment.
Catalysts and monitorables (next 12 months)
| Timing | Catalyst / monitorable | What to watch |
|---|---|---|
| 12 Nov 2026 | AGM | First FY27 / H1 FY27 EBIT guidance; capex quantum; any board renewal (independence, gender) |
| CY2026–27 | Caboolture plant commissioning; Rocklea approvals | Plant count and concrete volume growth |
| Jan–Feb 2027 | H1 FY27 trading update / results (~late Feb 2027) | CM margin vs 17.9% (H1 FY26); cement input-cost impact; CFT growth sustainability |
| FY27 | Brisbane 2032 stadium and venue contract awards (GIICA) | Wagners' supply wins; precast contract at Wulkuraka |
| FY27 | US utility pole orders | Repeat/expanded Californian orders; additional utility qualifications |
| Ongoing | Substantial holder notices | Further family selling or institutional accumulation |
| Ongoing | Related-party property transactions | Further lease-to-ownership conversions or third-party sales |
| Aug 2027 | FY27 results | Delivery against AGM guidance; FCF after capex; dividend trajectory |
Concluding analyst verdict
Wagners has completed a genuine operational turnaround. Between FY23 and FY26, operating EBIT tripled from A$21.9m to A$67.2m, NPAT rose thirteen-fold to A$40.6m and bank net debt fell from A$93.4m to effectively nil, while management beat its own guidance four times in succession. The quality of the improvement is high: it comes from a strategically coherent vertical-integration model in a structurally advantaged region, not from one-off contracts — indeed, Project Services revenue more than halved over the same period.
The investment case now rests on three judgements. First, whether SEQ construction-materials margins can hold near 17% as cement input costs rise and majors with deep-pocketed parents compete for Olympic-era volumes; the vertical-integration flywheel and land-banked plant sites argue yes, but FY27 cement margins are explicitly at risk. Second, whether CFT can scale beyond its ANZ utility niche into North American poles; FY26 provides the first real evidence (US revenue +97%, profitable, first utility orders), but adoption cycles in utilities are long. Third, whether the market will continue to look past a governance framework that leaves the founding family with a non-independent chair, a ~30% bloc and substantial related-party leases.
At A$4.64, the shares trade on ~23x trailing earnings and ~12x lease-adjusted EBITDA — a premium multiple that already capitalises a good part of the Olympic upcycle, with near-term free cash flow constrained by the capex programme. We therefore view Wagners as a high-quality, fairly valued regional compounder with asymmetric upside concentrated in CFT, best accumulated on pullbacks or on evidence of sustained US pole traction and improved board independence. The single published consensus target of A$5.00 implies modest upside; the AGM's FY27 guidance on 12 November 2026 is the decisive near-term test of whether the earnings run-rate still has momentum.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Independence | Background & qualifications | FY26 fees / remuneration (AUD) | Shareholding |
|---|---|---|---|---|---|---|
Denis Wagner | Non-executive Chairman; Chair, Nomination Committee; member, Remuneration Committee | 2 Nov 2017 | Not independent (co-founder, substantial holder) | Co-founder; >30 years in construction materials; instrumental in building Wagners into a leading SEQ producer | 230,000 | 23,249,522 ordinary shares (plus associated relevant interests) |
John Wagner | Non-executive Director; member, Audit & Risk Committee | 2 Nov 2017 | Not independent (co-founder) | Co-founder; >30 years in the industry | 115,000 | 22,413,375 direct; 59,218,176 indirect per 2 Mar 2026 notice (Market Index) |
Ross Walker | Independent NED; Chair, Audit & Risk Committee; member, Nomination and Remuneration Committees | 2 Nov 2017 | Independent | BCom, FCA; >30 years' corporate/accounting experience; former Managing Partner, Pitcher Partners Brisbane; former director RPM Global (ASX: RUL) and AUCyber (ASX: CYB) | 115,000 | 200,000 |
Allan Brackin | Independent NED; Chair, Remuneration Committee; member, Audit & Risk and Nomination Committees | 1 Feb 2025 | Independent | Bachelor of Applied Science; Harvard OPM; >40 years in technology; ex-CEO/MD Volante Group, founder/CEO AAG Technology Services, ex-Chair Opticomm, RPM Global and GBST; current director 3P Learning (ASX: 3PL); former director Integrated Research (2021–2023) | 115,000 | 100,000 |
Cameron Coleman | Managing Director | Board: 1 Jul 2022 | Executive | Joined Wagners >25 years ago; management roles across many businesses; Harvard Business School General Management Program (2012) | Total 1,353,805 (see §9.3) | 299,165 shares; 710,864 performance rights |
Executive Leadership Team
| Name | Title | Tenure / notes | Source |
|---|---|---|---|
Cameron Coleman | Managing Director | MD since 1 Jul 2022; >25 years with the group | FY26 AR |
Fergus Hume | Chief Financial Officer | KMP for full FY25 and FY26; presents results with the MD since at least FY23 | FY26 AR; FY23–FY26 webinars |
Karen Brown | General Counsel & Company Secretary | Since Dec 2017; LLB, BCom; solicitor of the Supreme Court of Queensland; former partner, Carter Newell Lawyers | FY26 AR |
John Stark | Joint COO, Construction Materials & Services | — | Kalkine |
Anthony Freer | Joint COO, Construction Materials & Services | — | Kalkine |
Michael Kemp | Executive General Manager, CFT (as of 2021) | — | Texas Governor (2021) |
(Unnamed) | Executive overseeing CFT ANZ and CFT USA | Appointed FY25 to drive continuous improvement | FY24 presentation |
Directors' Remuneration
| KMP | Year | Salary & fees | STI | Non-cash | Super | LSL | Share-based | **Total** | % performance-related |
|---|---|---|---|---|---|---|---|---|---|
Cameron Coleman (MD) | FY26 | 699,221 | 334,838 | 7,117 | 30,000 | 58,552 | 224,077 | 1,353,805 | 41.3% |
Cameron Coleman (MD) | FY25 | 699,490 | 205,489 | 9,743 | 27,500 | 49,491 | 166,698 | 1,158,411 | 32.1% |
Fergus Hume (CFO) | FY26 | 483,986 | 215,272 | — | 30,000 | 15,189 | 74,637 | 819,084 | 35.4% |
Fergus Hume (CFO) | FY25 | 464,258 | 132,112 | 21,348 | 27,500 | 20,024 | 54,176 | 719,418 | 25.9% |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
1 Jul 2022 | Cameron Coleman joins board as MD | Long-tenured insider elevated during the FY23 strategic review period |
22 Aug 2024 | Lynda O'Grady (independent NED) resigns; interim Remuneration Committee arrangements | Reduced independence until Brackin's appointment |
1 Feb 2025 | Allan Brackin appointed independent NED | Restores two-independent-director structure; now chairs Remuneration Committee |
1 Nov 2025 | MD base salary increased (to A$720,000) | Reflects FY25 performance |
Major Shareholders
| Holder | Shares | % of 200.78m | Date / basis | Source |
|---|---|---|---|---|
Wagner family associated group (relevant interest) | ~59.2m | ~29.5% | Derived from John Wagner's indirect interest per 2 Mar 2026 director notice | Market Index; analyst derivation |
— Denis Wagner (direct) | 23,249,522 | 11.6% | Date of FY26 Directors' Report | FY26 AR |
— John Wagner (direct) | 22,413,375 | 11.2% | Date of FY26 Directors' Report | FY26 AR |
Perpetual Limited group (incl. Pendal entities) | 12,235,297 | 6.13% (6.126% on filing denominator) | 30 Jul 2026 | Form 604, 3 Aug 2026 |
Other substantial holders | Not publicly disclosed in retrieved sources | — | — | InvestSMART |
Management (Coleman, Hume) | 443,654 | 0.2% | 30 Jun 2026 | FY26 AR |
Independent NEDs | 300,000 | 0.1% | 30 Jun 2026 | FY26 AR |
Competitive Landscape
Competitors by Segment
| Segment | Competitor | Ownership | Relevance to Wagners | Revenue / scale (most recent available) |
|---|---|---|---|---|
Cement (SEQ) | Cement Australia | JV of Holcim and Heidelberg Materials | Principal SEQ cement rival | — |
Cement (SEQ) | Sunstate Cement | — | Brisbane port cement supplier | — |
Cement / concrete / aggregates | Boral | Wholly owned by Seven Group Holdings (delisted Jul 2024) | Australia's largest integrated construction materials firm | FY23 revenue A$3.46bn (Boral company history) |
Cement / concrete / aggregates | Adbri | Owned by CRH (acquisition completed 2024, per public reports) | National integrated competitor | Not separately disclosed post-acquisition |
Concrete / aggregates | Holcim Australia | Holcim Group | Major SEQ ready-mix and quarry operator | — |
Concrete / aggregates | Hanson (Heidelberg Materials Australia) | Heidelberg Materials | Major SEQ ready-mix and quarry operator | — |
Concrete (SEQ) | Neilsen's Quality Concrete | Private | SEQ independent ready-mix | — |
Building materials (ANZ) | Fletcher Building | NZX/ASX listed | Diversified heavy and light building products; NZ cement, aggregates, steel | FY26 revenue NZ$5,994m; EBIT before significant items NZ$414m |
Utility poles (wood/steel) | Stella-Jones | TSX listed | North American wood pole leader; key incumbent CFT USA poles must displace | FY2025 sales C$3,492m; utility products C$1,822m |
Utility poles (steel/composite) | Valmont Industries; RS Technologies | NYSE; private | Steel and composite pole competitors in North America | — |
FRP structures (US) | Strongwell; Creative Composites Group; Bedford Reinforced Plastics | Private | Pultruded FRP bridges, structural shapes | — |
Bulk haulage | Qube; regional haulage contractors | ASX / private | Mine haulage tenders | — |
“—” = not publicly disclosed.
Peer Comparison FY2026
| Metric | Wagners (FY26, A$) | Fletcher Building (FY26, NZ$) | Stella-Jones (FY2025, C$) | Boral (SGH subsidiary) |
|---|---|---|---|---|
Revenue | 503.9m | 5,994m | 3,492m | FY23: A$3.46bn (latest public standalone) |
Revenue growth | +16.8% | +7.3% | +0.7% | — |
EBIT margin | 13.3% (operating) | 6.9% (EBIT before significant items / revenue) | — | — |
Net margin | 8.0% | 3.8% (net earnings NZ$228m) | — | — |
Net debt | A$0.8m (ex-leases) | NZ$637m | — | — |
“—” = not publicly disclosed.



