Company ProfilePremium

Wia Gold Limited (formerly Tanga Resources Limited)

Company Profile Analysis

Ticker: WIA.AX

ESOMAR 23 Corporate BadgeISO Certifications Badge
Wia Gold Limited - Company showcase

Year Founded & Workforce

2010

10 Employees

Wia Gold Limited logo

Wia Gold Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Wia Gold Limited Overview

Wia Gold Limited is a Perth-based gold developer that has shrunk a scattered African exploration portfolio down to one large asset: the Kokoseb Gold Project in north-western Namibia. Kokoseb was identified from soil sampling in 2021. It has grown from a 1.3 Moz maiden resource (May 2023) to 3.78 Moz at 1.0 g/t Au (August 2026), including a maiden higher-grade underground Inferred resource. The August 2026 Definitive Feasibility Study defined a 1.95 Moz Probable Ore Reserve supporting a 5.25 Mtpa open-pit carbon-in-leach operation producing about 150 koz/yr over ten years. Pre-production capex is estimated at US$475M. At a US$3,600/oz base case, post-tax NPV5 is US$1.21bn and IRR is 41%. The board includes former Centamin leaders, led by Chairman Josef El-Raghy. Following A$247M of equity raised in 2025–26 and indicative Sprott debt terms, Wia is positioned as one of the few fully funded, mid-tier-scale gold developments in a stable African jurisdiction. Its remaining gating items are permitting and financial close.


What the company does

Wia Gold is a mineral exploration and project development company. Its activity is to discover, delineate, study, permit, finance and ultimately build and operate a gold mine. It generates no product or service revenue. The only income reported is minor interest and other income, A$1.97M in FY2026 per RTTNews. Expenditure is split between capitalised exploration and evaluation (drilling, resource definition, studies) and expensed corporate and administrative costs.

Company's own description (paraphrased from the 2026 Annual Report)

The 2026 Annual Report describes Wia Gold as a Namibian-focused gold exploration and development company advancing Kokoseb. It cites sustained drilling and study work, and the milestones reached in FY2026: the DFS, the Ore Reserve, the funding package and permitting progress. These moved the project from discovery to development readiness (2026 Annual Report, Review of Operations).

Independent characterisation

Wia Gold sits at the "developer" inflection point of the junior mining life cycle. The relevant valuation framework is no longer exploration optionality but a risked NPV on a defined project, adjusted for:

  • financing risk, now largely mitigated by A$125M of equity and indicative Sprott terms;

  • permitting risk, with the Mining Licence and Environmental Clearance Certificate pending;

  • construction and execution risk, with a 22-month build to Q4 2028 first gold;

  • gold-price leverage.

The company is effectively a single-asset, single-commodity, single-jurisdiction vehicle. It has residual exposure to Côte d'Ivoire through a shareholding in Santa Fe Minerals, received as consideration for divesting its Ivorian permits in February 2026.

Business model and revenue model

DimensionCurrent state (FY2026)Prospective state (post-2028)
Revenue typeNone (interest income only)Gold doré sales to refiners at spot (commodity product revenue)
Product vs service vs subscription vs licensing100% pre-revenue~100% product (gold), minor silver credits not disclosed
Value chain positionUpstream exploration and developmentUpstream mining and primary processing (CIL) to doré
Customers—Precious-metal refiners and bullion banks (not yet contracted)
End-markets—Global gold market (investment, central banks, jewellery, technology)
Funding modelEquity placements, plus prospective project debt (Sprott)Operating cash flow, debt service, potential dividends

Customer types and end-markets

There are no customers today. Once in production, output would be sold as doré into the global gold market. Offtake terms have not been publicly disclosed, and the Sprott facility terms released so far do not specify any streaming or offtake component.

Strategy

Stated strategy (themes paraphrased from the 2026 AR, DFS presentation and company website)

  1. Build Kokoseb into Namibia's next major gold mine. Management positions Kokoseb as one of Africa's most compelling undeveloped gold assets and frames the company's purpose around delivering first gold in Q4 2028.

  2. Single-asset focus. Divesting Côte d'Ivoire concentrates capital and management attention on Kokoseb, while Santa Fe equity preserves some Ivorian upside.

  3. Grow beyond the DFS case. Underground resource growth (high-grade shoots open at depth) and plant expansion are explicitly flagged. The DFS capex includes about US$50M of oversized water and power infrastructure to enable future expansion.

  4. Fully funded execution. Equity plus Sprott debt plus existing cash is intended to remove financing risk before FID.

  5. Regional exploration. Systematic exploration across the Damaran licence portfolio for satellite and new discoveries.

Initiatives in the last 24 months

InitiativeDateDescription / targetStatus
Kokoseb Scoping Study30-Sep-2025US$358.8M capex; 177 koz/yr first five years; 146 koz/yr over 11.4 years; AISC US$1,265/oz; post-tax NPV US$646M, IRR 38% at US$2,600/ozComplete; superseded by DFS
Mining Licence Application10-Oct-2025Lodged with MIMEPending (grant targeted H2 2026)
Côte d'Ivoire divestmentNov-2025 to Feb-2026Sale of Glomin Services to Santa Fe MineralsComplete
Leadership transitionJan–Mar 2026CEO, CFO, NED appointmentsComplete
ESIA / ESMP submission19-Mar-2026Submitted to MIME and MEFTUnder review (ECC targeted H2 2026)
Pre-DFS balance-sheet raiseMay-2026A$92M at A$0.46Complete
Underground resource programme2,026Six diamond rigs; 19,819 m drilled in June 2026 quarterMaiden UG resource delivered Aug-2026; ongoing
DFS and maiden Reserve10-Aug-20261.95 Moz Reserve; US$475M capex; 14-year LOMComplete
Project financingAug-2026 onwardSprott US$360M senior secured facility (indicative, non-binding) plus US$15M equity subscription; lender site visit August 2026Due diligence and documentation
Construction equityAug-2026A$125M placementSubject to 18-Sep-2026 GM
Execution readinessH2 2026Contracting strategy, early works, site construction start targeted H2 2026In progress
Power supply2025–2631 MW NamPower application; 132 kV line to OmburuIn progress

Management medium-term targets / guidance

TargetGuidanceSource
Mining Licence and ECCH2 2026DFS; company website
Final Investment DecisionLate 2026Company website
Construction period22 monthsCompany website
First goldQ4 2028DFS; Motley Fool AU
Average production~150 koz/yr (years 1–10)DFS
AISC (LOM)US$1,696/ozDFS
Analyst-consensus breakeven2029; consensus profit A$12.9M in 2029 (3 analysts)Simply Wall St (Jun-2026)

ESG and sustainability commitments

Specific emissions targets, renewable-energy share or quantified social investment commitments are not publicly disclosed in sources reviewed. The company emphasises its partnership with state-owned Epangelo (20%), Traditional Authority support for permitting, and environmental and social management planning (ESIA/ESMP).

Products & Services

As a pre-revenue explorer and developer, Wia's "portfolio" is its mineral asset inventory. Each asset is catalogued below in place of commercial products.

Namibia (core segment)

AttributeDetailSource
LocationErongo Region, NW Namibia; ~320 km by road from WindhoekCompany website; Mar-2026 Quarterly
TenureOkombahe Exploration Licence; Wia 80% / Epangelo 20%Company website
GeologyGold hosted in Kuiseb Formation metasediments, intruded by syn- and post-tectonic granites; Damara BeltCompany website
DiscoverySoil anomaly Q2 2021; first drilling early 2022El-Raghy interview
Mineral Resource (Aug-2026)113 Mt @ 1.0 g/t Au for 3.78 MozASX ann. 10-Aug-2026
– Open pit105 Mt @ 0.96 g/t for 3.23 Moz (0.50 g/t cut-off)ASX ann. 10-Aug-2026
– Underground (maiden, Inferred)7.9 Mt @ 2.2 g/t for 0.56 Moz (0.85 g/t cut-off)ASX ann. 10-Aug-2026
Ore Reserve (Probable, maiden)69.8 Mt @ 0.87 g/t for 1.95 Moz (at US$2,600/oz)ASX ann. 10-Aug-2026; Mining Weekly
Open-pit mining inventory72.9 Mt @ 0.87 g/t for 2.03 MozDiscoveryAlert summary of DFS
Processing5.25 Mtpa conventional crush–grind–CIL; metallurgical recoveries consistently above 90%DFS; The Extractor
Production~150 koz/yr average in years 1–10; initial 14-year LOMDFS
Capex (pre-production)US$475M (direct US$302.6M; indirect US$59.1M; owner US$46.1M; contingency US$40.2M; pre-production mining and mobilisation US$26.8M)Company website, DFS summary
Strategic infrastructure in capexUS$34M Omaruru Alluvial Plains borefield; US$16M 132 kV grid connection to Omburu (~US$50M total for water and power, sized for expansion)Company website
Operating costC1 US$1,519/oz; AISC US$1,696/oz (LOM)DFS
Economics (base case US$3,600/oz)Pre-tax NPV5 US$1,923M / IRR 51%; post-tax NPV5 US$1,214M / IRR 41%; payback 21 months; 10-year average annual EBITDA US$281MCompany website, DFS
Power31 MW supply application lodged with NamPowerAfrican Mining Market
Mining fleet concept200-t-class excavators with 90-t haul trucks; peak mining ~45 Mtpa (scoping-stage disclosure)African Mining Market
ScheduleFID late 2026; 22-month construction; first gold targeted Q4 2028Company website
GrowthMineralisation open at depth along >5 km of strike; six diamond rigs active; high-grade shoots in Central and Southern zonesASX ann. 10-Aug-2026

A. Kokoseb Gold Project (flagship)

B. Damaran regional exploration portfolio. Twelve tenements covering more than 2,700 km² in the Damara Belt, including the Okombahe licence (Mining Review Africa). Legacy prospects named in the Tanga era were the Katerina and Okombahe gold projects, the Hagenhof copper-cobalt project (197.26 km²) and the Joumbira zinc-lead-silver project (~210 km²) (MarketBeat profile). The 2026 disclosures refer generically to "regional exploration across the licence portfolio".

Côte d'Ivoire (divested; retained exposure via equity)

AssetDescriptionStatus
BouafléBirimian greenstone gold project; historic Newcrest drilling (2011–13) included 8 m @ 18 g/t from 116 m; 10,000 m RC programme launched May 2024Transferred to Santa Fe (Feb-2026)
Mankono / Mankono OuestGold exploration permits; new permit granted in FY2025Transferred
IssiaAuger programmes FY2025Transferred
Bocanda / DialakoroGold exploration permitsTransferred
Consideration held20M Santa Fe Minerals shares plus 8M performance rights (milestone-based)Held by Wia

Pricing model

This is not applicable. Future product (gold) would be sold at spot or under refiner terms. Hedging requirements under the Sprott facility are not publicly disclosed.

Financial Narrative

Basis: fiscal years ending 30 June; A$ millions unless noted. Sources: TipRanks financial data (FY2022–FY2025 P&L and cash flow; TipRanks labels these "Dec" columns but values match June-year filings); Stockopedia (annual report standardised data FY2019–FY2023); RTTNews (FY2026 headline results); TipRanks AI analysis (FY2026 total assets, cash, OCF); Simply Wall St (FY2025 balance sheet); MarketScreener (FY2025 EPS).

Income statement

Notes:

  • FY2022–FY2023 EPS are analyst-computed (net loss divided by weighted shares). FY2024–FY2026 EPS are as reported (MarketScreener; RTTNews).

  • The "revenue" line is predominantly interest and other income. TipRanks classifies FY2022–FY2025 operating revenue as nil.

Margins: gross, operating, EBITDA and net margins are not meaningful for a pre-revenue issuer. Revenue CAGR: not meaningful.

Commentary. The P&L trajectory is that of an explorer turning into a developer. Expensed costs rose from about A$1.1M (FY2022) to about A$4.1M (FY2025), then stepped up materially in FY2026. Drivers in FY2026 were the appointment of a full executive team (CEO from February 2026, CFO from March 2026), owner's-team build for the DFS, share-based payments, and permitting and ESG workstreams. Most drilling and study expenditure is capitalised as exploration and evaluation, so the income statement understates total cash burn. Rising interest income (A$0.83M to A$1.97M) reflects the much larger cash balance.

Balance sheet

Notes:

  • Non-current assets are analyst-derived (total assets less cash and short-term investments). They approximate capitalised exploration and evaluation plus investments.

  • Short-term/long-term debt split: nil and nil in all years.

  • Goodwill and intangibles: nil (not disclosed as material).

  • Working capital FY2025: ~A$28.3M (short-term assets A$29.6M less short-term liabilities A$1.3M, per Simply Wall St).

  • Stockanalysis.com shows A$45.84M cash and A$91.44M equity at an interim date, most likely 31-Dec-2025.

Commentary. The balance sheet has scaled about 15x in four years, from A$11.8M to A$176.8M, funded almost entirely by equity. Cash of A$119M at 30-Jun-2026 reflects the May 2026 A$92M placement. The A$125M August 2026 placement, if completed after 18-Sep-2026 shareholder approval, takes pro-forma gross liquidity above A$230M before Q1 FY2027 spending. The company carries no debt, but the planned US$360M Sprott facility would change the capital structure fundamentally from 2027.

Cash flow

Notes:

  • Free cash flow is analyst-computed. TipRanks reports a narrower FCF definition (FY2022 -6.37; FY2023 -7.17; FY2024 -11.92; FY2025 -0.64; FY2026 -1.42) that appears to exclude capitalised exploration in later years. Those figures are inconsistent and are not relied upon.

  • Quarterly disclosures indicate exploration spend of A$4.571M in the September 2025 quarter alone, and six to seven rigs active through FY2026.

  • Net change in cash is derived from year-end balances, with FY2021 year-end cash of A$5.18M.

Commentary. Investing outflows (exploration capitalisation) have grown every year, from A$6.3M to A$15.3M in FY2025, and almost certainly well above that in FY2026 given DFS-scale drilling (19,819 m in the June 2026 quarter alone). Operating cash burn remains modest because most costs are capitalised. Financing has been entirely equity.

Ratios

Notes:

  • All ratios are analyst-computed from the figures above.

  • ROIC, net debt/EBITDA, interest coverage, asset turnover and cash conversion cycle are not meaningful for a pre-revenue, debt-free developer.

  • Price/book of 4.88x (Morningstar, October 2026) is the most relevant balance-sheet valuation marker.

Trend synthesis

  1. Inflection year (FY2026). Assets more than doubled, losses roughly tripled, and the company moved from exploration to development (DFS plus Reserve).

  2. Funding velocity. Equity raised rose from ~A$4–6M a year (FY2022–23) to ~A$26–30M (FY2024–25) and ~A$217M committed in calendar 2026 (A$92M plus A$125M). This reflects both share-price appreciation and project de-risking.

  3. Dilution. Weighted shares rose about 4.2x from FY2021 (300M) to FY2025 (1.28B). Shares outstanding reached about 2.0B by October 2026.

  4. Forthcoming leverage. Financial close on the Sprott facility would introduce up to US$360M (~A$540M at an indicative ~0.67 AUD/USD; FX assumption by analyst) of senior secured debt.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Revenue incl. other income (AUD Mn)

0.0020.028—0.831.97

Gross profit (AUD Mn)

-0.001-0.044-0.038-0.067—

Operating expenses (AUD Mn)

1.091.483.364.08—

Operating income (AUD Mn)

-1.09-1.53-3.39-4.15—

EBITDA (AUD Mn)

-1.35-1.48-3.58-5.28—

Pre-tax income (AUD Mn)

-1.35-1.52-3.61-5.35—

Net income (AUD Mn)

-1.35-1.52-3.62-5.09-14.15

Basic EPS (AUD)

-0.0030-0.0025-0.0040-0.0042-0.0095

Diluted EPS (AUD)

-0.0030-0.0025-0.0040-0.0042-0.0095

Dividends per share (AUD)

00000

Weighted avg shares (M)

453.30609.32904.131,280—

Balance Sheet

MetricFY2022FY2023FY2024FY2025FY2026

Total assets (AUD Mn)

11.7617.2343.7772.39176.81

Cash and short-term investments (AUD Mn)

2.321.2215.0529.01119.07

Total debt (AUD Mn)

00000

Net cash (AUD Mn)

2.321.2215.0529.01119.07

Total liabilities (AUD Mn)

———1.28—

Shareholders' equity (AUD Mn)

———71.11—

Non-current assets, mainly capitalised E&E (AUD Mn)

9.4416.0128.7243.3857.74

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

-0.82-0.75-1.32-0.45-1.37

Investing cash flow, mainly E&E capex (AUD Mn)

-6.26-6.52-10.74-15.29—

Free cash flow, OCF plus investing (AUD Mn)

-7.08-7.27-12.06-15.74—

Financing cash flow (AUD Mn)

4.316.1625.9029.65—

Dividends paid (AUD Mn)

00000

Buybacks (AUD Mn)

00000

Net change in cash, approx. (AUD Mn)

-2.86-1.1013.8313.9690.06

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2024FY2025FY2026

ROE (%)

—-7.2—

ROA (%)

-8.3-7.0-8.0

Current ratio (x)

—22.8—

Debt to equity (x)

000

Results by Region

RegionFY2024FY2025FY2026

Australia, interest and other income (AUD Mn)

—0.831.97

Namibia, operating revenue (AUD Mn)

000

Côte d'Ivoire, operating revenue (AUD Mn)

000

Geography Overview

GeographyRoleDirection

Namibia

Almost all exploration, study and pre-development spend (Kokoseb)

Rapidly growing; future 100% of production revenue

Côte d'Ivoire

Early-stage exploration FY2021–FY2025

Exited February 2026; residual equity exposure via Santa Fe Minerals

Australia

Corporate HQ, treasury

Stable

Share Price & Returns

Reference pointPrice (AUD)DateSource

TRL, pre-name change

0.069

3-Dec-2021

InvestSMART

WIA

0.092

30-Jun-2024

Market Index

WIA

0.34

Nov-2025

TipRanks; Simply Wall St

WIA

0.50

15-May-2026

The Extractor

WIA

0.44

12-Jun-2026

Google Finance

WIA

0.45

12-Aug-2026

Kalkine

WIA

0.47–0.48

2/6-Oct-2026

Morningstar

Metric

1-Year

3-Year

5-Year

Approx. share price change (%)

40—590

Market Valuation

MetricFY2024FY2025FY2026

Market cap, approximate reference points (AUD Mn)

341501747

Valuation Multiples

MultipleWia GoldComment

P/E

n/m (loss-making)

—

EV/EBITDA

n/m

—

EV/Sales

n/m

—

P/B

4.88x

Morningstar, October 2026

EV/Resource oz (total 3.78 Moz)

~A$219/oz

Analyst calc.: market cap A$948M less A$119M (30-Jun-2026 cash) = EV ~A$829M. If A$125M placement cash is included, EV ~A$704M and ~A$186/oz

EV/attributable Resource oz (80% = ~3.02 Moz)

~A$274/oz

Analyst calc., same basis

P/NAV (post-tax NPV5 US$1,214M, 80% attributable ~US$971M ≈ A$1.45bn at 0.67 AUD/USD)

~0.65x

Analyst calc.; FX and attribution assumptions are the analyst's; excludes debt and pre-build equity effects

Source Details

SourceCoverageTarget / viewDate

Stockanalysis.com

Consensus

Average price target A$0.77

2026 (exact date not stated)

Google Finance

1 analyst

A$0.70

Jun-2026

TipRanks

Most recent rating

Buy, A$0.41 target

Sep-2025

TipRanks

Earlier rating

Buy, A$0.28 target

Jul-2025

Simply Wall St

3 analysts

Breakeven forecast 2029; profit A$12.9M

Jun-2026

Argonaut (Patrick Streater)

Broker

Kokoseb seen as an attractive M&A target

2025

Capital Markets

ItemStatus

Dividend history

None ever paid

Dividend policy

None (pre-production)

Credit ratings (Moody's / S&P / Fitch)

Not rated

Drawn debt

Nil (30-Jun-2026)

Debt maturity profile

Not applicable. Prospective Sprott US$360M senior secured facility; tenor, pricing and amortisation not publicly disclosed

Share Price & Returns by Date

DateAmount (AUD Mn)Price (AUD)PurposeSource

Sep-2020

7.00.03

Côte d'Ivoire exploration

Metal Tiger RNS

Apr-2024

16.9—

Kokoseb drilling

Business News WA

FY2025

30.00.15

Exploration acceleration

Nasdaq / TipRanks

Aug-2025

~30

—

DFS, permitting

Ecofin; DiscoveryAlert

May-2026

920.46

Pre-DFS balance sheet

The Extractor; MarketScreener

Aug-2026

125

~0.425 implied (no discount to 7-Aug close; 2% below A$0.434 VWAP)

Construction to first gold

ARI; Mining Weekly

Pending

US$15M

TBD

Sprott equity subscription

DFS Presentation

Analyst Conclusions

Management guidance

ItemGuidance
Mining Licence and ECCH2 2026
Sprott financial closeFollowing permits and due diligence (2026–27)
FIDLate 2026
Construction22 months
First goldQ4 2028
Production~150 koz/yr (years 1–10), 14-year initial LOM
AISCUS$1,696/oz LOM

Consensus expectations

Three covering analysts (Simply Wall St) forecast losses through construction, breakeven in 2029, and a profit of about A$12.9M in 2029. Simply Wall St also flags continuing net losses of roughly A$20M a year in the interim. Price targets range from A$0.70 to A$0.77 (2026), against a share price of about A$0.47.

Bull case

  1. Permits plus debt close de-risk the NAV. At about 0.65x P/NAV on the base case, grant of the ML/ECC and Sprott financial close are discrete catalysts that typically compress the development discount.

  2. Resource growth beyond the Reserve. Only 1.95 Moz of 3.78 Moz is in Reserve. A 0.56 Moz UG Inferred resource at 2.2 g/t, deep intercepts (KDD147) and more than 5 km of open strike support mine-life extension and a potential plant upgrade enabled by the oversized infrastructure.

  3. Gold-price leverage and strategic value. DFS sensitivities show post-tax NPV5 rising to US$2.67bn. A funded, near-permitted 3.8 Moz asset in Namibia is scarce, consistent with Argonaut's M&A thesis and the precedent of Yintai's move on Twin Hills.

Bear case

  1. Cost creep and thin margins at lower prices. AISC rose 34% and capex 32% from scoping to DFS. At the US$2,600/oz Reserve price, the margin over a US$1,696/oz AISC is about US$900/oz, much less than at the base case.

  2. Conditional debt. The US$360M Sprott facility is indicative and non-binding. Delays in permits, due diligence or credit approval would push FID and first gold, while the burn rate rises (FY2026 net loss A$14–16M plus capitalised spend).

  3. Execution and dilution. A first-time builder delivering a 5.25 Mtpa CIL, borefield and grid line in 22 months carries overrun risk with only about 8.5% contingency. About 2.0B shares on issue, plus any cost-overrun equity, caps per-share upside.

Key catalysts and monitorables (next 12 months)

CatalystExpected timingWhy it matters
Mining Licence grantH2 2026Gating item for debt and FID
Environmental Clearance CertificateH2 2026Gating item for debt and FID
Sprott definitive documentation and financial closeLate 2026 – 2027Converts indicative terms to committed funding
FID and EPC/EPCM awardLate 2026Start of 22-month build clock
September 2026 and December 2026 quarterliesOct-2026 / Jan-2027Cash, permitting status, early works
AGM19-Nov-2026Remuneration and governance votes
Further UG resource and expansion studies2,027Mine-life and throughput upside
Santa Fe Minerals performance milestonesOngoingConversion of 8M performance rights
Gold price and AUD/USDContinuousNPV and funding adequacy

Analyst verdict

Tanga Resources, now Wia Gold, has become something rare among ASX juniors. A company that spent a decade cycling through Argentina, Tanzania, Namibian base metals and Côte d'Ivoire has converted a 2021 soil anomaly into a 3.78 Moz resource and a bankable 1.95 Moz Reserve in roughly five years. It did so at a discovery cost management puts near US$3/oz. The August 2026 DFS establishes a credible mid-tier operation: about 150 koz/yr for a decade, a 41% post-tax IRR, and a 21-month payback at US$3,600/oz. Its capital stack is unusually complete for a pre-permit developer: A$119M of cash at June 2026, a A$125M construction placement, and indicative Sprott terms for US$360M of senior debt plus US$15M of equity.

The investment debate has therefore moved from "is there a deposit?" to "can this team permit, finance and build it on budget?" The board's Centamin pedigree and the CEO's Nyanzaga and Bankan record are genuine mitigants. But the DFS also shows erosion of headline economics versus scoping: capex up 32% and AISC up 34%. The low-grade, high-tonnage design is therefore more sensitive to gold-price retracement than the base case suggests. The Sprott facility is not binding, and the Mining Licence and ECC, applied for in October 2025 and March 2026, remain the critical path.

At roughly A$940M market capitalisation, about A$190–220 of EV per resource ounce and an estimated ~0.65x attributable post-tax NAV, the market is pricing meaningful but diminishing development risk. The asymmetric catalysts over the next twelve months are permit grant, debt close and FID. Combined with underground growth and Kokoseb's evident strategic appeal, these skew the risk-reward positively. The skew holds for investors comfortable with single-asset, construction-phase exposure to the gold price. The main downside scenarios are a permitting delay that pushes FID into 2027, a renegotiated debt package, or further capex creep requiring additional equity.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleBoard tenurePrior roles / backgroundEducationAge

Josef El-Raghy

Non-Executive Chairman (Executive Chairman Apr-2024 to Jan-2026)

Since Apr-2024

MD of Centamin from 2002, overseeing its transition from junior explorer to gold miner (Sukari), later Chairman, left 2020; ~10-year stockbroking career; Non-Executive Chairman of AIC Mines (ASX: A1M) since 2019

—

55 (MarketScreener)

Henk (Hendrik Jacob) Diederichs

Managing Director & CEO

Since 1-Feb-2026

COO, Predictive Discovery (Bankan, Guinea); MD & CEO, OreCorp (Nyanzaga, Tanzania, to Perseus acquisition Apr-2024); SVP Operations, Allied Gold; senior role in Lumwana copper (Zambia); 20+ years in development and operations

University of Stellenbosch (engineer)

—

Andrew Pardey

Non-Executive Director

Since Sep-2020

———

Mark Arnesen

Non-Executive Director

Since 30-Mar-2023

Independent NED, Centamin plc (2011–2020); CEO & ED, Nzuri Copper (2016–2020); CEO/CFO, Cassius Mining; Finance Director, Moto Goldmines; MD International Treasury, AngloGold Ashanti; prior NED roles at Natasa Mining, Ampella Mining, KGL Resources

—

65 (MarketScreener)

Adam Smits

Non-Executive Director

Since 5-Mar-2026

———

“—” = not publicly disclosed.

Executive Leadership Team

NameTitleSinceSource

Henk Diederichs

MD & CEO

1-Feb-2026

2026 AR

David Edwards

CFO / Director of Finance

Mar-2026 (MarketScreener: 8-Mar-2026)

MarketScreener

Investor relations

Burson Buchanan (external IR contact)

—

MarketScreener

Board & Management Changes

DateDirectorTransactionSharesPrice (AUD)Value (AUD)Source

20-May-2026

Josef El-Raghy

Option exercise / conversion

20,000,0000.438,600,000

Market Index

18-Jun-2026

Henk Diederichs

Conversion of securities

2,500,0000.481,200,000

Market Index

11-Mar-2026

Mark Arnesen

On-market purchase

175,0000.54595,338

Market Index

Directors' Shareholdings

DirectorDirect sharesIndirect sharesOptionsLast notice

Josef El-Raghy

20,000,00086,666,667—

20-May-2026

Andrew Pardey

9,522,511—6,000,000

23-Sep-2025

Mark Arnesen

175,0004,946,00011,000,000

11-Mar-2026

Henk Diederichs

650,0003,616,530—

18-Jun-2026

Adam Smits

———

5-Mar-2026

Board & Management Changes — 24-Mar-2023

DateChangeContext

24-Mar-2023

Executive changes

Pre-MRE restructuring

2/17-Apr-2024

Board changes; El-Raghy appointed Executive Chairman

Accelerate Kokoseb; A$16.9M raise

1-Jul-2024

CFO changes

Build-out of finance function

14-Feb-2025

Company Secretary change

Routine

15-Jan-2026

Diederichs appointed MD & CEO (effective 1-Feb-2026); El-Raghy to Non-Executive Chairman

Transition to development; DFS delivery

5-Mar-2026

Adam Smits appointed NED

Board strengthening

Mar-2026

David Edwards CFO

Project finance readiness

Major Shareholders

HolderSharesStake at report dateDate reportedSource

Capital DI Limited

240,000,00016.23%

18-Sep-2025

Investing.com

BPM Investments Limited

114,300,0007.73%

18-Sep-2025

Investing.com

J P Morgan Nominees Australia

16,667,6674.50%

2021 (legacy, TRL)

Market Index

HSBC Custody Nominees (Australia)

13,768,1223.72%

2021 (legacy, TRL)

Market Index

Josef El-Raghy (direct and indirect)

106,666,667

~5.3% of ~2.0B (analyst calc.)

20-May-2026

Market Index

Competitive Landscape

Key Competitors

#CompanyAsset(s) / jurisdictionStageRelevance to WiaRevenue
1

B2Gold Corp.

Otjikoto mine, Namibia

Producer

Leading Namibian gold producer; competes for labour, contractors, power

—
2

QKR Namibia (Navachab)

Navachab mine, Namibia

Producer

Wia attempted to acquire it (per El-Raghy)

Not publicly disclosed (private)

3

Osino Resources / Shandong Yintai Gold

Twin Hills, Namibia (~US$365M capex project)

Developer

Closest analogue: similar resource size and grade profile, same region

—
4

Predictive Discovery (ASX: PDI)

Bankan, Guinea

Developer

ASX African gold developer; CEO Diederichs' former employer

Pre-revenue

5

Turaco Gold (ASX: TCG)

Afema, Côte d'Ivoire

Developer

ASX West African developer peer

Pre-revenue

6

Robex Resources

Nampala (Mali), Kiniero (Guinea)

Producer/developer

Merger partner of PDI

—
7

Montage Gold

Koné, Côte d'Ivoire

Developer/builder

Large African gold build

Pre-revenue

8

Perseus Mining (ASX: PRU)

Ghana, Côte d'Ivoire, Tanzania (Nyanzaga)

Producer

Mid-tier African producer and natural consolidator

—
9

AIC Mines (ASX: A1M)

Australia

Producer

Shares Chairman El-Raghy (competes for his time)

—
10

Santa Fe Minerals

Côte d'Ivoire permits (ex-Wia)

Explorer

Former Wia assets; Wia holds equity

Pre-revenue

Peer Comparison FY2026

MetricWia Gold (Kokoseb)Twin Hills (Osino/Yintai)

Jurisdiction

Namibia

Namibia

Resource (Moz)

3.78—

Reserve (Moz)

1.95—

Pre-production capex (USD Mn)

475

~365 (per Ecofin)

Production (koz/yr)

~150

—

Revenue / margins / R&D intensity

n/a (pre-revenue)

—

Company Snapshot

10

Employees

2010

Founded

Subiaco, Australia

Headquarters

SWOT Analysis

Strengths

  • Large, growing resource. 3.78 Moz at 1.0 g/t (Aug-2026), up 29% from 2.93 Moz and about 2.9x the 1.3 Moz maiden MRE of May 2023.
  • Maiden Reserve and bankable DFS. 1.95 Moz Probable Reserve at a conservative US$2,600/oz, with a 14-year LOM.
  • Robust economics. Post-tax NPV5 US$1,214M, IRR 41%, payback 21 months, ten-year average EBITDA US$281M at US$3,600/oz.
  • Funded. A$119M cash at 30-Jun-2026, plus the A$125M placement, plus indicative US$360M Sprott debt and US$15M Sprott equity.
  • Experienced leadership. Chairman El-Raghy took Centamin from explorer to producer. The CEO led OreCorp's Nyanzaga to a Perseus takeover.
  • Low-risk metallurgy. CIL recoveries consistently above 90% in test work.
  • Debt-free balance sheet at FY2026.

Weaknesses

  • Low reserve grade (0.87 g/t) implies large tonnages (peak ~45 Mtpa mining) and cost sensitivity.
  • AISC of US$1,696/oz is higher than the scoping estimate (US$1,265/oz), a 34% increase.
  • Capex escalation. US$358.8M (scoping) to US$475M (DFS), up 32%.
  • Rising losses. Net loss up from A$5.09M (FY2025) to A$14.15M (FY2026).
  • Heavy dilution. Weighted shares rose from 300M (FY2021) to 1.28B (FY2025), and about 2.0B shares are on issue (Oct-2026).
  • No operating track record as a company; reliant on a newly assembled owner's team.

Opportunities

  • Underground expansion. A maiden 0.56 Moz Inferred UG resource at 2.2 g/t, plus deep hits such as KDD147 (9.0 m @ 10.64 g/t from 811 m).
  • Plant expansion. About US$50M of infrastructure in the DFS is oversized to support future throughput.
  • Strike extension. Mineralisation is open over more than 5 km of strike.
  • Regional discovery. 12 Damaran tenements over >2,700 km².
  • Gold-price leverage. DFS sensitivities show post-tax NPV5 up to US$2,665M and IRR up to 70%.
  • M&A. Analyst commentary (Argonaut) identifies Kokoseb as an attractive takeover target. Santa Fe equity offers Ivorian upside.

Threats

  • Permitting delay. The Mining Licence (applied October 2025) and ECC (ESIA submitted March 2026) are still pending as of the latest disclosures.
  • Financing conditionality. The Sprott facility is indicative and non-binding, conditional on due diligence, documentation, approvals and receipt of the ML and ECC.
  • Gold-price reversal. At the US$2,600/oz reserve price, margins over an AISC of US$1,696/oz narrow considerably.
  • Construction cost overrun across the 22-month schedule; contingency is only US$40.2M (~8.5% of capex).
  • Fiscal or regulatory change in Namibia, including state-participation or local-beneficiation policies (general sector risk, not company-specific evidence).
  • Utility risk. Water and grid-power delivery depends on NamPower and borefield execution.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
FY2025 (H1 CY2025)A$30M placement at A$0.15 Nasdaq / TipRanksFunded expanded Kokoseb drilling
FY2025Included in S&P/ASX All Ordinaries FilingReaderIndex visibility and liquidity
16-Jul-2025MRE increased 38% to 2.93 Moz (89 Mt @ 1.0 g/t); 1.81 Moz Indicated (62%) ASX; EcofinFirst Indicated classification; scoping-study basis
Aug-2025~A$30M placement (~US$20M) Ecofin; DiscoveryAlertDFS and permitting funding
23-Sep-2025FY2025 Annual Report; net loss A$5.09M MarketScreener; FilingReaderRoutine
30-Sep-2025Scoping Study released (US$358.8M capex; NPV US$646M; IRR 38%) Mining Weekly; EcofinEnabled Mining Licence Application
10-Oct-2025Mining Licence Application lodged with MIME Mar-2026 QuarterlyPermitting clock started
22-Oct-2025"High grade gold targeted at Kokoseb" drilling release Mar-2026 Quarterly reference listUnderground potential
28-Oct-2025September 2025 Quarterly: cash A$52.1M; exploration spend A$4.571M InvestSMARTLiquidity marker; shares jumped ~48% on the day
Nov-2025Binding agreement to sell Côte d'Ivoire permits to Santa Fe Minerals EcofinPortfolio simplification
8-Dec-2025"Outstanding high-grade intercepts at Kokoseb" Mar-2026 Quarterly reference listUG resource support
15-Jan-2026Henk Diederichs appointed MD & CEO (effective 1-Feb-2026) Mining WeeklyDevelopment-capable leadership
21-Jan-2026December 2025 Quarterly: ~N$555M cash; contract mining EOIs The ExtractorExecution readiness
2-Feb-2026Completion of Côte d'Ivoire divestment Mining WeeklySingle-asset focus achieved
4/5-Mar-2026Half-year accounts; significant high-grade intercepts; Adam Smits appointed NED ASX 5-Mar-2026; 2026 ARGovernance and UG growth
Mar-2026David Edwards appointed CFO MarketScreenerProject finance readiness
19-Mar-2026ESIA and ESMP submitted to MIME and MEFT Mar-2026 QuarterlyKey permitting milestone
20-Apr-2026March 2026 Quarterly: cash A$40.94M InvestSMARTLiquidity before May raise
May-2026A$92M placement at A$0.46 (8% discount to A$0.50) to offshore institutions; settlement 26-May-2026 The Extractor; MarketScreenerPre-DFS balance sheet
20-May-2026Chairman exercises 20M options at A$0.43 (A$8.6M) Market IndexInsider alignment
3-Jun-2026Updated mine-plan disclosures (177 koz/yr first five years; 427.8 Mt total material) African Mining MarketDFS progress
15-Jun-2026KDD147: 9.0 m @ 10.64 g/t from 811 m; new deep high-grade target below Central Zone Mining and Energy NamibiaUG upside
18-Jun-2026CEO conversion of 2.5M securities Market IndexInsider alignment
16-Jul-2026June 2026 Quarterly: 19,819 m drilled; maiden UG resource flagged for Q3 2026 The ExtractorResource growth
10-Aug-2026DFS: 1.95 Moz Reserve; US$475M capex; NPV5 US$1.214bn; IRR 41%. MRE increased 29% to 3.78 Moz. Sprott indicative US$375M package ASX 10-Aug-2026Transformational de-risking
12/13-Aug-2026A$125M placement (no discount to 7-Aug close; 2% discount to 5-day VWAP of A$0.434) Mining Weekly; ARICompletes equity funding
19-Aug-2026Notice of General Meeting (18-Sep-2026): ratification of prior placement and approval of new placement shares ASX 19-Aug-2026Corporate approval
Aug-2026Sprott lender site visit DFS PresentationDebt due diligence
18-Sep-2026Placement approval
23/24-Sep-2026FY2026 Annual Report: net loss A$14.15M (RTTNews) or A$16.1M (TradingView summary); income A$1.97M RTTNews; TradingViewRoutine
Sep-20262026 Corporate Governance Statement TipRanksGovernance
Oct-2026Shares ~A$0.47–0.48; market cap ~A$940M; ~2.0B shares on issue MorningstarValuation marker
19-Nov-2026 (scheduled)Annual General Meeting TipRanksGovernance

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

1 chart
Results by Region: Australia, interest and other income rose from AUD 0.8 Mn in FY2025 to AUD 2 Mn in FY2026.
Wia Gold Limited — Results by Region
Series (AUD Mn)FY2025FY2026
Australia, interest and other income0.82

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.