Wilson Bayly Holmes-Ovcon Limited Overview
WBHO is South Africa's largest JSE-listed construction contractor by revenue. It reported FY2026 revenue of R28.3bn [S1], compared with R22.05bn for its closest listed peer, Raubex (year to February 2026) [S16]. It is a multidisciplinary builder and civil engineer whose core strengths are self-performed delivery of complex, large-scale projects and a conservative balance sheet (R4.5bn cash, minimal borrowings at June 2026). Its African business covers building, civil engineering, renewable-energy EPC, and roads and earthworks. It also has two UK businesses: the London-based Byrne Group and Manchester-based Russell WBHO. Roughly two-thirds of revenue comes from South Africa. The order book is R37.6bn, and the work scheduled for execution in FY2027 equals 86% of FY2026 revenue. In 2022 WBHO exited Australia after a damaging loss cycle. Since then it has rebuilt as a lower-risk, cash-generative contractor that has earned operating margins of about 4.5–5.0% for four consecutive years. Its main exposures are SANRAL road spending, private renewable energy procurement, Western Cape building activity and selective African mining and gas infrastructure.
Company's own description
In its 2025 Integrated Report, WBHO describes itself as one of the largest construction companies in southern Africa, listed on the JSE, with further operations in the UK through the Byrne Group (London) and Russell WBHO (Manchester) [S5]. It attributes its success to a core of hands-on management professionals with decades of experience on major projects. The company says its activities cover the full construction spectrum through three main operating divisions: Building Construction, Civil Engineering (and Infrastructure), and Roads and Earthworks. A Projects division (concessions, PPPs, turnkey design-and-construct and renewable-energy EPC) and a Construction Materials segment support these [S5]. The stated vision is to be the leading construction company wherever it operates and to be "a pleasure to do business with". The corporate motto is "Rely on our ability" [S5].
Independent characterisation
WBHO is a project-based, contract-revenue business that sits in the main-contractor and self-performing specialist tiers of the construction value chain. Revenue is recognised over time under IFRS 15 using surveys of work performed [S4]. The model has no subscription, licensing or recurring product revenue in the conventional sense. Quasi-recurring income comes from three smaller sources:
Construction materials: (reinforcing steel and mesh through Reinforcing & Mesh Solutions, plus VSL Construction): R1.3bn of external revenue in FY2026 [S1].
Concession and equity-accounted investments: gas and power in Mozambique through the Gigajoule Group, and serviced government accommodation PPPs (Dipalopalo, Tshala Bese Uyavuna). These contributed R73m of after-tax share of profits in FY2026 [S1].
Property development stakes: (Russell Homes in the UK, and South African residential schemes) [S1].
Revenue mix (derived, FY2026): About 95.4% contracting services and about 4.6% construction-materials product sales. Concession earnings sit below operating profit as equity-accounted income [S1].
Contracting forms: WBHO bids remeasurable, fixed-price and design-and-build contracts, and a meaningful share of building work is negotiated directly with repeat clients [S5]. Design-and-construct opportunities are rising in South Africa. These include active D&C projects in Gauteng, KwaZulu-Natal (KZN) and Ghana, and an advanced position on a data centre won on a D&C basis [S1].
Customer types:
-
Public sector: SANRAL (national roads), provincial governments (for example the Western Cape Education and Health departments), Eskom, water user associations and Airports Company South Africa (prospects).
-
Private commercial and industrial developers: Equites, Steyn City, Riverlands precinct developers and others.
-
Blue-chip mining houses: Barrick, AngloGold Ashanti, ArcelorMittal, Northam Platinum, Ivanhoe, Harmony.
-
Energy majors and independent power producers: TotalEnergies in Mozambique, renewable IPPs in South Africa.
-
UK main contractors and developers: Multiplex, Balfour Beatty Vinci JV, SCS JV, Skanska, Village Hotel Club, Select Group [S1][S3].
End-markets served (FY2025–FY2026): roads and bridges; renewable energy (solar PV, wind, battery storage); commercial and residential building; warehousing and logistics; data centres; healthcare and education; hotels; mining infrastructure (tailings storage facilities, plants, runways); water (dams, treatment works, abstraction); oil and gas camps and infrastructure; nuclear (Koeberg life extension); rail; and UK concrete frame, refurbishment ("cut and carve"), infrastructure (HS2) and defence work [S1][S3][S5].
Strategy
Stated strategy (paraphrased from the 2025 Integrated Report [S5])
WBHO's vision is to be the leading contractor in every market it serves and "a pleasure to do business with", while following work where it arises without lowering its standards. The board pursues six strategic objectives:
-
SO1 – Flexibility and diversification. Spread across geographies, sectors and value-chain levels; select projects strategically; rightsize capacity; offer turnkey multi-discipline solutions.
-
SO2 – Procurement and execution excellence. Selective bidding, tender governance, mid-cycle cost-to-complete reviews and quality audits. Key measures are actual versus tendered margin (64% of completed projects beat tender margin in FY2025) and the number of loss-making projects.
-
SO3 – Reputation and relationships. Repeat and negotiated work; ethics and compliance programmes. WBHO received the PMR Diamond Arrow (best construction company) for the 25th consecutive year.
-
SO4 – Capacity and talent management. Succession planning, the Engineering School, management development programmes with Stellenbosch Business School, bursaries and retention schemes.
-
SO5 – Safety and environmental management. ISO 45001 and ISO 14001; high-risk activity procedures; an AI-assisted observation platform; CDP disclosure.
-
SO6 – Transformation and localisation. Level 1 B-BBEE, Akani 2, enterprise development (14 black-owned contractors) and localisation targets in African countries.
Board priorities for FY2025 were procurement discipline on major projects, execution quality and leadership capacity and succession. The board also committed to assess the impact of artificial intelligence on the business [S5].
Strategic initiatives (last 24 months)
| Initiative | Date | Detail | Source |
|---|---|---|---|
| Renewable energy EPC scale-up | FY2025–FY2026 | Khauta 501MW (R4bn); Naos hybrid (R6.1bn); preferred bidder on four further projects; Zamori acquired for in-house M&E capability | [S1][S11] |
| Cape Winelands Airport | Joint development agreement in FY2025; contractor selection 9 Dec 2025 | About R8bn programme; construction expected from 2027 | [S1][S3][S12] |
| Western Cape resource redeployment | FY2025–FY2026 | Gauteng teams shifted to Cape Town; 51% of building revenue now from the Western Cape | [S1] |
| Gauteng warehousing client-building | FY2026 | Low-margin warehousing projects taken to open relationships for larger bids | [S1] |
| Design-and-construct offering | FY2026 | Active D&C projects in Gauteng, KZN and Ghana; data centre on a D&C basis | [S1] |
| Byrne Bros. diversification | FY2025–FY2026 | Pivot to infrastructure, defence, water, data centres and work outside London | [S1][S3] |
| O'Keefe rebrand | FY2026 | Now Byrne Demolition & Groundworks | [S1] |
| Retention schemes | 2023–2024 | Middle-management (2023) and senior-management (2024) retention schemes; annual leave raised from 15 to 20 days | [S6] |
| Safety digitisation | FY2024–FY2025 | AI-enabled, open-access observation reporting | [S5] |
| Net Zero (UK) | Ongoing | Russell WBHO targets Net Zero by 2038 | [S5] |
| Solar PV at facilities | Ongoing | Johannesburg and Western Cape offices; Johannesburg plant yard | [S5] |
| Tirisano Construction Fund | To 2027 | Continued funding commitment | [S5] |
Medium-term targets and guidance
Investor return target: returns above 20%, exceeding real growth in the economy and the construction sector [S5].
Formal earnings or revenue guidance: not publicly disclosed.
Forward indicator: secured work for FY2027 is R24.6bn, equal to 86% of FY2026 revenue [S1].
Management view of margins (FY2025): margins are "likely sustainable". Higher-margin renewables are expected to offset building and roadwork pressure [S5].
Products & Services
WBHO sells construction services rather than catalogue products. Pricing is set contract by contract (tendered or negotiated, remeasurable, fixed-price or D&B). Unit pricing is not publicly disclosed [S5]. The table lists each business line.
Building and civil engineering
| Business line | Description and capabilities | Target customers | Flagship or recent projects |
|---|---|---|---|
| Building – Gauteng | Commercial offices, residential, data centres, retail, healthcare, warehousing | Private developers, hyperscale and colocation operators, public entities | South African Reserve Bank alterations (Tshwane); 426 apartments at Steyn City; 16MW data centre (Midrand); Tiger Brands warehouse for Equites; residential tower and hotel and conference centre in Waterfall (FY2026 to post-year-end) [S1][S3] |
| Building – Western Cape | Residential, retail, offices, mixed-use, education, healthcare, hotels | Developers, Western Cape provincial government | Riverlands precinct and mall; Century City; Val de Vie; Stellenbosch student housing; The Granger; Canal Plaza; Evergreen retirement village (Noordhoek) [S1][S3] |
| Building – KZN | Industrial and warehousing, commercial, residential | Logistics developers, FMCG manufacturers | Brickworks, Cato Ridge and Whetstone logistics parks; Coca-Cola Beverages and SAB plant work; Oceans Umhlanga towers [S3] |
| Building – Eastern Cape | Warehousing (Coega), healthcare, hotels | Developers, private hospital groups | Life Bay Hospital upgrades; Capital Hotel at the Boardwalk (145 rooms) [S3] |
| Building – rest of Africa | Selective private building | Data centre operators | Data centre in Accra, Ghana [S3] |
| Civil engineering | Mining infrastructure, industrial plants, water, energy (including nuclear), oil and gas camps | Mining majors, Eskom, TotalEnergies, water authorities | 9,500-bed camp for TotalEnergies (Mozambique) plus 2,000 additional beds; Barrick Lumwana concentrator (Zambia); Eswatini fuel storage depot; Koeberg life-extension work through the KCC Consortium; Mokopane and Seku Ruwe water treatment works (Olifants) [S1][S3][S5] |
| Projects division (renewables EPC, concessions, D&C) | Full EPC wrap on utility-scale PV (the company states it is the only South African contractor offering this); wind civils balance of plant; battery storage; PPP concessions | IPPs, government departments (PPP) | Khauta South and West 501MW PV (R4bn, awarded June 2025); Naos 434MW PV plus 726MWh battery storage (R6.1bn, January 2026); Koruson 1 and 2 wind clusters (three wind farms completed in FY2026); 17MW solar at Gigawatt Power Station, Mozambique; preferred bidder on Phofu 124MW, Middelvlei 128MW, Stellar 200MW PV and the Great Karoo 150MW wind farm [S1][S5][S11] |
| Zamori 172 (80%, from March 2026) | Mechanical and electrical installation for utility-scale renewables | IPPs and EPC contractors (internal synergy) | Contributed R245m revenue and R58m operating profit over four months of FY2026 [S1] |
| Cape Winelands Airport (contractor) | Technical development and construction of an airport costing roughly R8bn | RSA Aero (owner and operator) | Detailed design and planning in 2026; construction expected to start in calendar 2027 [S1][S12] |
Roads and earthworks
| Business line | Description and capabilities | Target customers | Flagship or recent projects |
|---|---|---|---|
| Roads and bridges (South Africa) | Greenfield highways, dualling, interchanges, incremental-launch bridges | SANRAL, provinces | N3 Hammarsdale–Key Ridge realignment (383m incrementally launched twin five-lane bridges); N2 Wild Coast Highway (16–18km between the Mtentu and Msikaba bridges); N2 Verzameling–Mkhondo dualling (Mpumalanga); R63 Bhisho–N6 (completion expected January 2028); N2 Makhanda phase 3 (completed FY2026 at a loss); N2 Lingeni (R2bn); R516 Limpopo [S1][S3] |
| Roadspan | Road surfacing and rehabilitation; asphalt and bitumen supply | SANRAL, provinces, municipalities | Revenue grew 52% in FY2026 [S1] |
| Mining infrastructure | Tailings storage facilities, bulk earthworks, haul roads, airstrips | Mining houses | Beposo TSF phase 2 (AngloGold Ashanti, Ghana); TSF and rail rehabilitation for ArcelorMittal (Liberia); Lumwana greenfield airstrip (Barrick); Gamsberg (zinc), Booysendal (Northam) and Platreef (Ivanhoe) awards for FY2027 [S1][S3] |
| Water infrastructure | Dams, abstraction works, bulk water | Water user associations, Department of Water and Sanitation | Ngwadini off-channel dam (KZN, 56m concrete-faced rockfill); Olifants Phase 2b (R4.5bn project, R1bn in order book); tracking Ncwabeni and Upper uMkhomazi [S1][S3] |
| Energy and oil and gas infrastructure | Power station civils; gas field works; renewable civils | Eskom, TotalEnergies, Sasol, IPPs | Majuba and Matimba (completed); TotalEnergies advanced infrastructure; Sasol Temane; Umsobomvu and Hartebeeshoek wind farms [S3] |
| Rest-of-Africa roads | Public road upgrades | Concessionaires (Trac) and governments | EN4 Sections 16 and 17A for Trac (Mozambique, to FY2028); substantial joint-venture road project in Eswatini [S1] |
| Pipelines division | Bulk pipelines | Water utilities | R1bn KZN pipeline suspended since FY2020 over community unrest; lowest bidder on a R4bn project (FY2023 disclosure) [S4] |
United Kingdom
| Business line | Description and capabilities | Target customers | Flagship or recent projects |
|---|---|---|---|
| Byrne Bros. (Byrne Group) | Concrete frame sub- and superstructures; infrastructure civils; diversifying into defence, water and data centres | Tier-1 contractors | TV Centre (White City) for Multiplex; HS2 bridges and portal for the Balfour Beatty Vinci JV; Area Central and West Ruislip portal for the SCS JV; North London Heat and Power (Acciona); energy-from-waste plant for Kanadevia Inova; RAF Molesworth for Skanska; AWE (Berkshire) [S1][S3] |
| F.B. Ellmer Construction | New-build, "cut and carve" refurbishment, fit-out (hotels, prime residential, offices) | Developers and hotel operators | Motel One, 160 Blackfriars (222 keys); 25 Marylebone Road; Park International Hotel (Kensington); Allen Stand at Lord's; Whiteleys; Thames City; 1 Palace Street; KYN Kensington; Brighton College [S1][S3] |
| Byrne Demolition & Groundworks (formerly O'Keefe) | Demolition, enabling works, soil remediation, groundworks | Developers and contractors | Rebranded and consolidated in FY2026 [S1] |
| Russell WBHO (Manchester) | Main contractor in the North West: hotels, industrial, care homes, technical facilities | Hotel groups, developers, public science bodies | Fairmont Cheshire, The Mere (£70m, Select Group); Village Hotel Club (Ashton, Farnborough, Solihull, Leeds); Hollinwood Junction (£22–25m, 13 industrial units); Daresbury supercomputing centre (£35m); Care UK Wilmslow [S1][S3] |
Construction materials
| Business line | Description | Customers |
|---|---|---|
| Reinforcing & Mesh Solutions (RMS) | Cut-and-bent reinforcing steel and mesh | Internal divisions (inter-segment sales R209m in FY2026) and third-party contractors, including wind tower foundations [S1] |
| VSL Construction | Specialist structural and post-tensioning services (as described in WBHO's segment commentary) | Renewable energy (wind) and coastal building markets [S1] |
Concessions, associates and property (equity-accounted)
| Investment | Effective interest | Activity | FY2026 share of profit (ZAR Mn) |
|---|---|---|---|
| Gigajoule International Group (Mozambique) | 26.6% | Gas supply (Matola Gas, concession extended by 10 years) and power generation (Gigawatt Power) | 51.1 |
| Tshala Bese Uyavuna (RF) | 32.5% | Serviced accommodation PPP for the Department of Rural Development and Land Reform | 23.1 |
| Dipalopalo Concession (RF) / DFMS | 27.7% / 14.6% | Serviced accommodation PPP for Statistics South Africa | 6.1 |
| Russell Homes Ltd (UK) | 31.7% | Residential schemes and land: Oldham land sale expected in H1 FY2027; Northern Gateway (10.5m sq ft commercial land plus up to 1,500 homes, sales from 2028/29) | -11.3 |
| Other property developers (LizCoBiz/Trilogy, 19 on Loop/Rubik) | 50% / 20% | Residential and mixed-use | 4.3 |
Sources: [S1][S3].
Financial Narrative
Basis: All figures are for continuing operations (excluding Australia) unless stated. FY2022–FY2023 come from the FY2023 audited AFS [S4], FY2024–FY2025 from the FY2025 summary statements [S3], and FY2026 from the FY2026 summary statements [S1]. WBHO does not report cost of sales. "Gross contribution" is therefore derived as revenue less reported "operating costs". EBITDA is derived as operating profit plus depreciation (including right-of-use assets).
Income statement
Notes: FY2022 discontinued loss includes the loss of control of the Australian subsidiaries [S4]. FY2024 operating profit is after an R86.0m goodwill impairment; the CGU was not identified in the summary statements reviewed [S3]. FY2022–FY2023 headline earnings come from directors' report commentary (R690m and R904m) [S4].
Per-share data (cents)
Notes:
-
FY2022–FY2023 HEPS continuing come from Profile's Handbook [S7][S8], which is consistent with headline earnings ÷ weighted shares.
-
FY2023 total HEPS (1,514c) is derived as continuing HEPS less the discontinued loss of 188.9c per share [S4].
-
FY2022–FY2023 diluted HEPS is shown equal to basic. The FY2023 AFS reports EPS as "basic and diluted" [S4]; FY2022 diluted HEPS was not separately extracted.
-
Dividends: FY2024 = 230c interim + 230c final; FY2025 = 300c + 320c; FY2026 = 300c + 320c [S7][S10][S2]. No dividends were declared for FY2022 or FY2023 because of Australian cash outflows [S4][S33].
Margins (derived)
Revenue CAGR (continuing): FY2022–FY2026 four-year CAGR of 13.2% (derived). FY2023–FY2026 three-year CAGR of 6.0% (derived).
Balance sheet
Notes:
-
The current portions of instalment-sale and lease liabilities sit within trade and other payables. These were disclosed for FY2022–FY2023 (FY2023 current portion of long-term liabilities R345.2m and of leases R36.5m [S4]) but not in the FY2024–FY2026 summary statements. "Net cash" here is therefore an upper-bound measure (derived).
-
FY2023 interest-bearing debt in full: instalment sales R277.4m, bank loans R271.4m, leases R168.1m, total R716.9m [S4].
-
NAV per share uses shareholders' equity divided by the weighted average share count (derived). Profile's Handbook uses gross issued shares and reports 7,503c for FY2025 [S7].
Cash flow
Notes:
-
WBHO classifies dividends paid within operating activities.
-
FCF (derived) = net operating cash flow + dividends paid + discontinued operating outflows (R1,593.7m in FY2022) – cash capex.
-
Total capex: FY2022–FY2023 use PP&E additions [S4]; FY2024 R533m and FY2025 R517m per the Integrated Report [S5]; FY2026 = R268.6m cash plus R395m financed [S1].
Ratios (derived, year-end balances)
Notes:
-
ROIC (derived) uses operating profit × (1 – effective tax rate) divided by (total equity + non-current borrowings and leases – cash). It is inflated because cash is largely funded by customer advances and excess billings: contract liabilities were R3.0bn in FY2026.
-
Company-reported comparables: return on capital employed was 36% in FY2025 and 33% in FY2024; debt to equity including leases was 10.5% in FY2025 and 14.8% in FY2024 [S5].
-
Cash conversion cycle is not publicly disclosed and is not meaningful for contractors working on milestone and surveyed billing.
-
Dividend cover for FY2022–FY2023 is shown as 0 because no dividend was paid.
Trend commentary
Revenue. Revenue of R17.2bn in FY2022 marked the trough after the Australian exit. FY2023 grew 38%, driven by South Africa (+42%), the rest of Africa (+56%, from Mozambique and two Liberian projects) and the UK (+19%) [S4][S32]. FY2024 added another 16%, building on large building, data centre, renewables and SANRAL programmes [S5][S13]. FY2025 grew 4% and FY2026 was flat (–0.6%), described by the Chairman as "consolidation" [S5]. The FY2026 plateau came from three factors: Gauteng building fell sharply (division revenue –16%), West Africa wound down after Ghana and Liberia projects completed (R&E rest-of-Africa revenue –25%), and roadwork ramped up only gradually [S1]. H2 FY2026 revenue of R14.3bn was slightly above H1's R14.0bn (derived from [S9]).
Margins. Group operating margin has held in a narrow 4.5–5.0% band for four years. The mix has shifted: renewables and civil engineering lifted B&CE to 5.2%, while R&E fell from 7.6% to 7.2% on a heavier weighting of lower-margin roadwork and the N2 Makhanda loss [S1]. The rest of Africa is structurally the highest-margin region (11.9% in FY2026), so its smaller revenue share dilutes the group margin [S1]. Share-based payment costs roughly doubled from R82m in FY2024 to R147–154m in FY2025–FY2026 after retention schemes were introduced [S1][S3]. FY2026 also included a new R32m expected-credit-loss charge on long-term receivables [S1].
Earnings. HEPS (continuing) grew at a 15% CAGR from FY2022 to FY2026 (derived). Growth stalled in FY2026, with HEPS up only 0.2% at 2,283c [S1]. Lower associate income (Gigajoule engine downtime, dollar liquidity costs and lower Matola gas sales after the Mozal smelter closed) and a Russell Homes overhead loss weighed on earnings, partly offset by a lower tax rate [S1].
Balance sheet. Shareholders' equity more than doubled, from R2.9bn in FY2022 to R6.0bn in FY2026 [S1][S4]. Cash rose to R4.5bn, split across South Africa (R2.05bn), the rest of Africa (R0.93bn) and the UK (R1.49bn) [S1]. Borrowings are confined to asset finance and leases. Off-balance-sheet performance guarantees totalled R8.5bn [S1].
Cash flow inflection. FY2026 cash generated from operations fell to R1.4bn from R1.9bn because of a R560m working-capital outflow. Receivables rose R909m, worsened by overdue public-sector debtors, partly offset by a R441m release of contract assets [S1]. FY2024 had a similar outflow (R711m) [S3]. Working capital is therefore the main swing factor in FCF.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Revenue by Segment
| Segment | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Building and civil engineering revenue (ZAR Mn) | 12,068.0 | 11,854.4 | 12,060.0 |
Roads and earthworks revenue (ZAR Mn) | 8,935.1 | 9,595.8 | 9,113.5 |
United Kingdom revenue (ZAR Mn) | 5,379.4 | 5,654.7 | 5,856.4 |
Construction materials external revenue (ZAR Mn) | 1,129.7 | 1,388.4 | 1,295.3 |
Property developments revenue (ZAR Mn) | 13.4 | 0 | 0 |
Total revenue continuing operations (ZAR Mn) | 27,525.6 | 28,493.2 | 28,325.2 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansResults by Segment
| Segment | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Building and civil engineering profit (ZAR Mn) | 568.0 | 598.6 | 624.3 |
Roads and earthworks profit (ZAR Mn) | 625.9 | 732.3 | 657.6 |
United Kingdom profit (ZAR Mn) | 183.2 | 186.8 | 220.4 |
Property developments profit (ZAR Mn) | 13.1 | 8.6 | 12.5 |
Construction materials profit (ZAR Mn) | 24.8 | 42.0 | 38.0 |
Total segment profit (ZAR Mn) | 1,415.0 | 1,568.3 | 1,552.7 |
Share-based payment expense (ZAR Mn) | -82.2 | -153.5 | -147.4 |
Goodwill impairment (ZAR Mn) | -86.0 | 0 | 0 |
Expected credit loss on long-term receivables (ZAR Mn) | 0 | 0.4 | -32.2 |
Group operating profit continuing (ZAR Mn) | 1,246.8 | 1,415.2 | 1,373.0 |
Segment Margins & Growth (%) and Revenue by Segment (%)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
B&CE operating margin (%) | 4.7 | 5.1 | 5.2 |
R&E operating margin (%) | 7.0 | 7.6 | 7.2 |
UK operating margin (%) | 3.4 | 3.3 | 3.8 |
Construction materials operating margin (%) | 2.2 | 3.0 | 2.9 |
B&CE revenue growth YoY (%) | 0 | -1.8 | 1.7 |
R&E revenue growth YoY (%) | 0 | 7.4 | -5.0 |
UK revenue growth YoY (%) | 0 | 5.1 | 3.6 |
Construction materials revenue growth YoY (%) | 0 | 22.9 | -6.7 |
B&CE share of group revenue (%) | 43.8 | 41.6 | 42.6 |
R&E share of group revenue (%) | 32.5 | 33.7 | 32.2 |
UK share of group revenue (%) | 19.5 | 19.8 | 20.7 |
Construction materials share of group revenue (%) | 4.1 | 4.9 | 4.6 |
Revenue by Segment — Byrne Group revenue
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Byrne Group revenue (GBP Mn) | 171 | 190 | 175 |
Byrne Group operating profit (GBP Mn) | 6.4 | 7.2 | 0 |
Russell WBHO revenue (GBP Mn) | 58 | 50 | 80 |
Russell WBHO operating profit (GBP Mn) | 1.5 | 1.0 | 3.7 |
Income Statement and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (ZAR Mn) | 17,240.3 | 23,768.7 | 27,525.6 | 28,493.2 | 28,325.2 |
Revenue growth YoY (%) | -22.0 | 37.9 | 15.8 | 3.5 | -0.6 |
Gross contribution (revenue less operating costs) (ZAR Mn) | 1,640.5 | 2,042.7 | 2,498.6 | 2,567.7 | 2,604.1 |
Administrative costs (ZAR Mn) | 859.1 | 1,015.8 | 1,278.9 | 1,183.8 | 1,270.0 |
Operating profit (ZAR Mn) | 814.2 | 1,058.0 | 1,246.8 | 1,415.2 | 1,373.0 |
Depreciation incl. right-of-use (ZAR Mn) | 198.7 | 248.0 | 334.1 | 385.8 | 388.5 |
EBITDA (derived) (ZAR Mn) | 1,012.9 | 1,306.0 | 1,580.9 | 1,801.0 | 1,761.5 |
Share of associates and JVs (ZAR Mn) | 100.5 | 130.9 | 95.9 | 111.1 | 73.3 |
Finance income (ZAR Mn) | 119.8 | 188.9 | 266.4 | 299.3 | 296.4 |
Finance costs (ZAR Mn) | 30.4 | 63.6 | 68.0 | 56.3 | 54.4 |
Profit before tax (ZAR Mn) | 1,004.0 | 1,294.3 | 1,541.0 | 1,769.2 | 1,680.6 |
Income tax (ZAR Mn) | 285.2 | 360.4 | 487.7 | 469.5 | 434.7 |
Profit continuing operations (ZAR Mn) | 718.8 | 933.9 | 1,053.3 | 1,299.7 | 1,245.9 |
Profit or loss from discontinued operations (ZAR Mn) | -2,993.1 | -100.2 | -4.7 | 30.7 | 17.4 |
Attributable profit total operations (ZAR Mn) | -2,160.3 | 790.2 | 968.2 | 1,241.7 | 1,210.7 |
Attributable profit continuing operations (ZAR Mn) | 693.0 | 890.4 | 972.9 | 1,211.0 | 1,193.3 |
Headline earnings continuing (ZAR Mn) | 690 | 904 | 1,060.8 | 1,200.0 | 1,204.0 |
Effective tax rate (%) | 28.4 | 27.8 | 31.6 | 26.5 | 25.9 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansPer-Share Data and Share Count (millions)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Basic EPS continuing (ZAR cents) | 1,303.1 | 1,678.6 | 1,853.3 | 2,299.1 | 2,262.3 |
Basic EPS total operations (ZAR cents) | -4,062.1 | 1,489.7 | 1,844.3 | 2,357.4 | 2,295.3 |
HEPS continuing basic (ZAR cents) | 1,297.0 | 1,703.4 | 2,020.7 | 2,278.3 | 2,282.6 |
HEPS continuing diluted (ZAR cents) | 1,297.0 | 1,703.4 | 2,018.7 | 2,258.9 | 2,274.8 |
HEPS total operations (ZAR cents) | -2,751 | 1,514 | 2,011.7 | 2,336.6 | 2,315.6 |
Dividend per share (ZAR cents) | 0 | 0 | 460 | 620 | 620 |
Weighted average shares (millions) | 53.2 | 53.0 | 52.5 | 52.7 | 52.7 |
Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Gross contribution margin (%) | 9.5 | 8.6 | 9.1 | 9.0 | 9.2 |
Operating margin (%) | 4.7 | 4.5 | 4.5 | 5.0 | 4.8 |
EBITDA margin (%) | 5.9 | 5.5 | 5.7 | 6.3 | 6.2 |
Pre-tax margin (%) | 5.8 | 5.4 | 5.6 | 6.2 | 5.9 |
Net margin continuing (%) | 4.2 | 3.9 | 3.8 | 4.6 | 4.4 |
Balance Sheet and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (ZAR Mn) | 11,866.9 | 14,646.4 | 15,361.8 | 16,076.4 | 16,832.4 |
Cash and cash equivalents (ZAR Mn) | 3,339.2 | 3,684.7 | 3,660.0 | 4,305.1 | 4,470.3 |
Non-current long-term liabilities (ZAR Mn) | 152.2 | 327.2 | 257.8 | 248.3 | 402.8 |
Non-current lease liabilities (ZAR Mn) | 193.6 | 131.6 | 128.2 | 101.3 | 66.8 |
Net cash (cash less non-current borrowings and leases) (ZAR Mn) | 2,993.4 | 3,225.9 | 3,274.0 | 3,955.5 | 4,000.7 |
Shareholders' equity (ZAR Mn) | 2,855.0 | 3,864.4 | 4,532.8 | 5,328.2 | 6,036.0 |
Total equity incl. NCI (ZAR Mn) | 2,936.3 | 4,000.9 | 4,677.9 | 5,569.1 | 6,251.3 |
Goodwill (ZAR Mn) | 512.5 | 602.3 | 500.2 | 527.3 | 530.9 |
Property plant and equipment (ZAR Mn) | 1,562.6 | 2,111.2 | 2,330.6 | 2,559.3 | 2,771.3 |
Contract liabilities (ZAR Mn) | 1,908.3 | 2,426.6 | 3,284.2 | 2,858.3 | 3,040.5 |
Provisions (ZAR Mn) | 2,448.5 | 2,650.5 | 2,214.1 | 2,579.8 | 2,315.3 |
Working capital (current assets less current liabilities) (ZAR Mn) | -344.3 | 399.7 | 700.3 | 1,369.7 | 1,757.0 |
Net asset value per share on net shares (ZAR cents) | 5,367 | 7,379 | 8,636 | 9,978 | 11,314 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash generated from operations continuing (ZAR Mn) | 1,282.8 | 1,562.0 | 1,035.1 | 1,936.2 | 1,383.3 |
Working capital movement (ZAR Mn) | 188.6 | 322.8 | -711.5 | 35.7 | -559.7 |
Income tax paid (ZAR Mn) | 344.4 | 483.9 | 394.8 | 372.6 | 285.1 |
Net cash from operating activities as reported (ZAR Mn) | -636.7 | 1,340.1 | 664.2 | 1,534.5 | 843.3 |
Capex paid in cash (ZAR Mn) | 102.1 | 191.6 | 221.1 | 267.8 | 268.6 |
Total capex incl. asset-financed (ZAR Mn) | 241.4 | 510.2 | 533 | 517 | 664 |
Free cash flow continuing pre-dividend (derived) (ZAR Mn) | 1,012.6 | 1,148.5 | 637.1 | 1,562.9 | 968.5 |
Dividends paid incl. to NCI (ZAR Mn) | 157.7 | 0 | 194.0 | 296.2 | 393.8 |
Dividends paid to WBHO shareholders (ZAR Mn) | 116.5 | 0 | 125.9 | 289.3 | 326.5 |
Shares bought for incentives and treasury (ZAR Mn) | 15.0 | 95.2 | 91.1 | 528.2 | 0 |
Instalment-sale repayments (ZAR Mn) | 57.5 | 133.9 | 266.4 | 280.1 | 217.7 |
Australian settlement payments in investing (ZAR Mn) | 853.6 | 782.1 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE total operations (%) | -75.7 | 20.4 | 21.4 | 23.3 | 20.1 |
ROE continuing operations (%) | 24.3 | 23.0 | 21.5 | 22.7 | 19.8 |
ROA total operations (%) | -19.2 | 5.7 | 6.8 | 8.3 | 7.5 |
ROIC continuing, NOPAT over equity plus debt less cash (%) | 182 | 62 | 54 | 64 | 45 |
Current ratio (x) | 0.96 | 1.04 | 1.07 | 1.14 | 1.17 |
Debt to equity, non-current borrowings and leases (%) | 11.8 | 11.5 | 8.3 | 6.3 | 7.5 |
Net debt to EBITDA (x) | -2.96 | -2.47 | -2.07 | -2.20 | -2.27 |
Interest coverage, operating profit over finance costs (x) | 26.8 | 16.6 | 18.3 | 25.1 | 25.3 |
Asset turnover, revenue over total assets (x) | 1.45 | 1.62 | 1.79 | 1.77 | 1.68 |
Dividend cover, HEPS continuing over DPS (x) | 0 | 0 | 4.4 | 3.7 | 3.7 |
Revenue by Region
| Region | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
South Africa revenue (ZAR Mn) | 18,925.9 | 19,146.6 | 19,319.9 |
Rest of Africa revenue (ZAR Mn) | 3,220.3 | 3,691.9 | 3,148.9 |
United Kingdom revenue (ZAR Mn) | 5,379.4 | 5,654.7 | 5,856.4 |
Total revenue (ZAR Mn) | 27,525.6 | 28,493.2 | 28,325.2 |
Region Margins & Growth (%) and Revenue by Region (%)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
South Africa revenue growth (%) | 0 | 1.2 | 0.9 |
Rest of Africa revenue growth (%) | 0 | 14.6 | -14.7 |
UK revenue growth (%) | 0 | 5.1 | 3.6 |
South Africa share of revenue (%) | 68.8 | 67.2 | 68.2 |
Rest of Africa share of revenue (%) | 11.7 | 13.0 | 11.1 |
UK share of revenue (%) | 19.5 | 19.8 | 20.7 |
Results by Region and Region Margins & Growth (%)
| Region | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
South Africa segment operating profit (ZAR Mn) | 930.4 | 990.3 | 958.3 |
Rest of Africa segment operating profit (ZAR Mn) | 301.4 | 391.2 | 374.0 |
UK segment operating profit (ZAR Mn) | 183.2 | 186.8 | 220.4 |
South Africa operating margin (%) | 4.9 | 5.2 | 5.0 |
Rest of Africa operating margin (%) | 9.4 | 10.6 | 11.9 |
UK operating margin (%) | 3.4 | 3.3 | 3.8 |
Revenue by Region by Segment by Geography
| Segment by geography | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
South Africa B&CE (ZAR Mn) | 11,819.9 | 11,275.7 | 11,450.4 |
South Africa R&E (ZAR Mn) | 5,589.6 | 6,102.5 | 6,311.7 |
South Africa construction materials (ZAR Mn) | 1,503.1 | 1,768.4 | 1,557.8 |
South Africa property developments (ZAR Mn) | 13.4 | 0 | 0 |
Rest of Africa B&CE (ZAR Mn) | 248.1 | 578.6 | 609.6 |
Rest of Africa R&E (ZAR Mn) | 2,862.5 | 3,056.2 | 2,416.3 |
Rest of Africa construction materials (ZAR Mn) | 109.7 | 57.1 | 123.0 |
UK (ZAR Mn) | 5,379.4 | 5,654.7 | 5,856.4 |
Share Price
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Share price fiscal high (ZAR) | 125.80 | 113.79 | 162.29 | 249.96 | 214.51 |
Share price fiscal low (ZAR) | 69.16 | 70.00 | 101.70 | 154.81 | 142.84 |
Share price fiscal period end (ZAR) | 80.88 | 104.48 | 160.08 | 184.67 | 144.21 |
Valuation Multiples
| Multiple | WBHO | Basis |
|---|---|---|
P/E (HEPS continuing FY2026) | 6.3x | 144.21 / 22.83 |
Dividend yield | 4.3% | 620c / R144.21 |
P/B | 1.27x | NAV of R113.1 per net share |
Market capitalisation, net of treasury shares | R7.69bn | 53.35m shares |
Market capitalisation, gross issued shares | R9.95bn | 69.0m shares |
EV (net shares basis) | about R3.9bn | Market cap + non-current borrowings and leases R0.47bn + NCI R0.22bn – cash R4.47bn |
EV/EBITDA FY2026 | about 2.2x | EBITDA R1.76bn |
EV/Sales FY2026 | about 0.14x | Revenue R28.3bn |
Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Interim dividend (ZAR cents) | 0 | 0 | 230 | 300 | 300 |
Final dividend (ZAR cents) | 0 | 0 | 230 | 320 | 320 |
Total dividend (ZAR cents) | 0 | 0 | 460 | 620 | 620 |
Analyst Conclusions
Management guidance
WBHO does not give numerical guidance. Management says the order book leaves the group well positioned for FY2027. It also flags that geopolitical tensions in the Middle East and Eastern Europe have changed the inflation and interest-rate outlook, making procurement more cautious [S1]. Expected divisional trends:
-
Civil engineering should grow strongly: its order book rose 127%, and 160% of FY2026 revenue is already secured for FY2027.
-
Gauteng building volumes should roughly double (FY2027 secured work equals 190% of FY2026 executed work), but at very low margins.
-
R&E is well covered for FY2027–FY2028, but faces SANRAL procurement-gap risk.
-
The rest of Africa should benefit from Eswatini and Mozambique work.
-
The UK outlook is mixed [S1].
Consensus growth expectations: not publicly disclosed.
Bull case
-
Order-book-led volume recovery. Secured FY2027 work of R24.6bn, Civils at 160% revenue cover and Gauteng building at 190% volume cover point to a return to revenue growth in FY2027 [S1].
-
Renewables and the airport create a multi-year runway. Four preferred-bidder renewable projects, Naos and Khauta execution, the R8bn Cape Winelands Airport from 2027 and R3.5bn of unbooked Olifants work add up to a pipeline that few competitors can match [S1].
-
Deep-value valuation. A P/E of 6.3x, a dividend yield of 4.3% and an EV/EBITDA of about 2.2x on the net-share basis, combined with ROE of about 20%, cash-funded growth capacity and 3.7x dividend cover, leave room for re-rating or higher payouts [S1][S18].
Bear case
-
Margin dilution as mix shifts. Low-margin Gauteng building, lower-margin roadwork and a shrinking rest-of-Africa contribution could push the operating margin below 4.5% even as revenue grows [S1].
-
Public-sector cash and procurement risk. Overdue public debtors drove a R909m receivables build in FY2026. A SANRAL procurement gap could leave R&E idle from FY2028 [S1].
-
Execution and macro tail risks. One loss-making contract (N2 Makhanda) erased much of R&E's margin progress. A history of large losses (Australia, R2.2bn in FY2022), the fatalities in FY2025–FY2026, UK insolvency risk and inflation shocks all argue for a structurally low multiple [S1][S4].
Catalysts and monitorables (next 12 months)
-
H1 FY2027 trading statement (if required) and interim results (expected early March 2027).
-
Financial close and awards on Phofu, Middelvlei, Stellar and Great Karoo.
-
Start of Cape Winelands Airport construction (calendar 2027) and the contract value booked into the order book.
-
SANRAL tender volumes; Olifants Phase 2b progress; Upper uMkhomazi and Ncwabeni releases.
-
Durban Pier 2 decision (bid validity expires December 2026).
-
Working-capital normalisation and collection of public-sector debtors.
-
Rest-of-Africa margins after West Africa completions; the Ivory Coast bid outcome.
-
Russell WBHO order-book replenishment (the £52m and £40m PCSAs).
-
Oldham land sale proceeds at Russell Homes.
-
FY2026 Integrated Report (expected late October 2026): employee numbers, emissions and remuneration.
-
Employment Equity Act compliance and Public Procurement Act regulations.
Concluding analyst verdict
WBHO has completed its post-Australia rehabilitation. It is now a cash-rich, lower-risk contractor with a record-level order book. The FY2026 results confirm that it can protect margins in a flat year: group operating margin held at 4.8%, segment margin at 5.5% and ROE at about 20%. They also show that it cannot yet generate organic growth. Revenue was flat at R28.3bn and HEPS edged up 0.2% to 2,283c. Three factors produced this standstill: a collapse in Gauteng building, the end of high-margin West African mining contracts and a gradual roadwork ramp-up.
FY2027 looks better on paper. Secured work equals 86% of FY2026 revenue, and Civils and Gauteng building enter the year with exceptional cover. The renewables franchise (Khauta, Naos and four preferred-bidder projects) and the Cape Winelands Airport give WBHO a medium-term pipeline that few South African competitors can match. The trade-off is quality of revenue. Much of the new building work was won at very low margins, roadwork margins are structurally modest, and the high-margin rest-of-Africa contribution is shrinking. Investors should therefore expect revenue growth with flat-to-lower margins rather than an earnings breakout.
The balance sheet stands out. Cash of R4.47bn sits against negligible borrowings, although a meaningful portion is funded by R3.0bn of customer advances and excess billings and is not truly free. The FY2026 working-capital outflow and overdue public debtors are the main warning signs for cash conversion.
At about R144, the shares trade on roughly 6.3x HEPS with a 4.3% yield covered about 3.7x. That price already discounts much of the cyclical and execution risk. The investment case depends on management converting the pipeline without repeating the N2 Makhanda experience. On balance, the evidence supports a constructive but disciplined stance: an undemanding valuation and strong liquidity, offset by margin-mix and public-sector payment risks that justify a persistent sector discount.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Tenure and appointment | Background |
|---|---|---|---|
Charles (C V) Henwood | Executive Chairman | Chairman since 21 Nov 2024. Group CFO for about 12 years until 23 Nov 2023 | CA(SA); more than three decades in construction |
Wolfgang (W P) Neff | Chief Executive Officer | CEO since 2019 (succeeded L Nel, CEO 2008–2019) | Long-serving WBHO executive |
Andrew (A C) Logan | Chief Financial Officer | CFO and executive director since 23 Nov 2023; previously Group Financial Director | CA(SA); more than 20 years at WBHO |
Ross (R W) Gardiner | Lead Independent Non-Executive Director | Social and Ethics Committee member since 1 Nov 2017 | — |
Cobus (A J) Bester | Independent Non-Executive Director | Audit Committee Chairman | — |
Karen (K M) Forbay | Independent Non-Executive Director | Social and Ethics Committee Chairperson since 1 Nov 2017 | — |
Hatla (H) Ntene | Independent Non-Executive Director | Social and Ethics Committee member since 1 Nov 2017 | — |
N Songushu | Independent Non-Executive Director | The FY2023 AFS (dated 12 Sep 2023) states appointment on "5 December 2023", which is internally inconsistent; the appointment probably took place in December 2022 | Audit Committee member |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
23 Nov 2023 | C Henwood retires as CFO; A Logan appointed CFO | Henwood remained to complete the Australian exit [S14] |
21 Nov 2024 | L Nel retires as Chairman; C Henwood appointed Chairman | Orderly succession [S13] |
20 Nov 2024 | F Wakeford joins the Social and Ethics Committee | — [S13][S6] |
20 Oct 2025 | D Msiska steps down from the Social and Ethics Committee | She remains Company Secretary per FY2026 filings [S6][S1] |
Major Shareholders
| Shareholder | Stake (%) | Date of record |
|---|---|---|
Akani 2 Investment Holdings (Pty) Ltd (B-BBEE employee scheme) | 20.43 | 5 Feb 2026 |
Government Employees Pension Fund (managed by the PIC) | 19.99 | 5 Feb 2026 |
Ninety One SA (Pty) Ltd | 8.42 | 5 Feb 2026 |
Allan Gray (clients) | 20.47 | 9 Oct 2024 (not listed among the top three in Feb 2026) |
WBHO Management Trust | 9.95 | Oct 2024–Oct 2025 |
Public Investment Corporation | 15.543 | 19 Apr 2024 notification |
Competitive Landscape
Competitors by Segment
| Segment | Named competitors | Notes |
|---|---|---|
South African roads and earthworks | Raubex; Stefanutti Stocks; Concor (unlisted); SANRAL-registered Grade 9 contractors including black-owned and joint-venture firms | Raubex Roads & Earthworks revenue was R7.13bn in FY Feb 2026 [S16]. WBHO notes that the large number of road competitors keeps margins in check [S3] |
South African building | Stefanutti Stocks (Inland, Coastal and Western Cape regions); Concor; Gauteng contractors moving into the Western Cape | WBHO reports an influx of new competition in the Western Cape [S1] |
Renewable energy EPC and BOP | Raubex (Infrastructure division); international EPC contractors | WBHO describes itself as the only South African contractor offering a full PV EPC wrap [S5] |
Mining infrastructure (Africa) | Raubex (Australia and Materials Handling); Chinese state-owned contractors in Botswana and Zambia copper; citizen-owned firms (Ghana) | Localisation and Chinese ownership limit access [S5] |
Mozambique gas and roads | Stefanutti Stocks exited Mozambique in Dec 2025 [S17]; other international contractors | WBHO is entrenched with TotalEnergies and Trac [S1] |
UK concrete frame (London) | Other London frame specialists (not named in the sources reviewed) | WBHO describes London as highly competitive [S1] |
UK North West main contracting | Regional main contractors (not named in the sources reviewed) | Hotels and industrial are the core niches [S1] |
Peer Comparison FY2026
| Metric | WBHO (FY Jun 2026) | Raubex (FY Feb 2026) | Stefanutti Stocks (FY Feb 2026) |
|---|---|---|---|
Revenue (ZAR Bn) | 28.3 | 22.05 | 7.84 |
Revenue growth (%) | -0.6 | 4.6 | 2.4 |
Operating profit (ZAR Bn) | 1.37 | 1.7 | 0.689 |
Operating margin (%) | 4.8 | about 7.7 | 8.8 reported; about 4.1 excluding the R388m Kusile settlement |
Order book (ZAR Bn) | 37.6 | 31.46 | 17.2 |
Cash (ZAR Bn) | 4.47 | 1.87 | 1.1 |