Yongnam Holdings Limited Overview
Yongnam was, for most of its listed life, one of Singapore's best-known specialist steel contractors. It operated in two niches that sat between the main contractor and the raw-steel supply chain. The first was heavy, complex structural steelwork: detailing, fabrication and erection for airports, stadia, integrated resorts and landmark commercial buildings. The second was specialist civil engineering, built around a proprietary, reusable Modular Strutting System and related temporary earth-retaining and decking works for deep excavations on MRT lines, road tunnels and other infrastructure. Its track record included the Marina Bay Sands SkyPark, Gardens by the Bay, the Singapore Sports Hub, Jewel Changi Airport and several Indian airport terminals. From 2014 the group recorded nine consecutive annual losses. Margin erosion on fixed-price sub-contracts, chronic under-utilisation of fabrication capacity, the 2020 COVID-19 site shutdown and post-pandemic cost inflation, combined with high leverage, ended in judicial management in 2023, liquidation in 2024 and delisting.
What the company did
Yongnam was an investment holding company whose subsidiaries provided engineering and construction services in Singapore and the wider Asia-Pacific region. Its operating hub was YNEC in Singapore, supported by a fabrication facility in Nusajaya, Johor, Malaysia (Yongnam Engineering Sdn Bhd), a Hong Kong subsidiary (Yongnam Engineering (HK) Limited), and dormant or smaller entities in the PRC, Thailand and Myanmar (AR22 directorship disclosures).
Revenue was reported across five business lines (R22; R20):
-
Structural Steelworks: engineering coordination, shop detailing, fabrication and erection of structural steel for long-span aircraft hangars, high-rise buildings, commercial and industrial buildings, hospitals and infrastructure.
-
Specialist Civil Engineering: design, supply, installation and dismantling of temporary steel works for deep excavations. These included modular steel struts, sheet piles, soldier piles, pipe-pile cofferdams, earth retaining and stabilising structures (ERSS), traffic and working decking, and temporary pedestrian bridges. In Hong Kong the equivalent scope is excavation and lateral support (ELS) works.
-
Mechanical Engineering: fabrication of non-pressure parts for heat recovery steam generators (HRSG), conveyor structures and similar plant steelwork. This line was material only until FY2016.
-
Design and Build: turnkey light-industrial and commercial buildings in Singapore. This line was material only until FY2019.
-
Others: sundry revenue, including material sales.
In addition, the group took main-contractor positions through joint ventures on large infrastructure packages. These were a 30% share of the Leighton–Yongnam JV for North-South Corridor Contract N103 (S$553.8 million contract value) and the Daewoo–Yongnam JV for Jurong Region Line Contract J109 (S$320.4 million contract value) (SGX, 23 May 2018 and 20 Jul 2020; AR22).
Company's own description (paraphrased from AR22)
In its final annual report, Yongnam described itself as a steel construction specialist with more than five decades of experience. It cited two production facilities, in Singapore and in Nusajaya, Johor, with a combined annual fabrication capacity of 84,000 tonnes. It highlighted its Modular Strutting System as its key competitive edge, saying the system was the first in Singapore to be certified by an independent auditor for reusability in earth-retaining or stabilising structures, with a traceability procedure meeting BCA requirements. It listed its certifications: ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018; CE marking to EN 1090-1/-2 and EN ISO 3834-2 up to execution class EXC4; S1 (highest) fabricator accreditation from the Singapore Structural Steel Society; BCA A2 grades in General Building and Civil Engineering; and bizSAFE Star. Its stated ambition was to be "the partner of choice in providing solutions for the steel construction industry" (AR22, Corporate Profile).
Business and revenue model
| Dimension | Characterisation |
|---|---|
| Product vs. service mix | Effectively 100% project/contract revenue (services plus fabricated product). There was no subscription or licensing income. Strut systems were supplied and installed under rental-like sub-contracts (install–maintain–dismantle), but revenue was recognised as construction contract revenue over time using a cost-based input method (R22, Note 1.2a). |
| Contract form | Predominantly sub-contracts to main contractors (e.g., Penta-Ocean, Ssangyong E&C, Penta-Bachy JV, Daewoo-Yongnam JV), plus JV main contracts with the LTA (SGX novation announcements 2024). |
| Revenue recognition | Over time; variation orders and claims were a material source of estimation risk and of repeated provisions (FY2014, FY2016, FY2018) (EDGE; SGX profit warning, 21 Feb 2017). |
| Capital intensity | Very high for a sub-contractor. PPE was S$184.6m at end FY2022, of which steel beams and columns (the strut fleet) were S$137.5m (R22, Note 6). Depreciation ran at S$25–36m a year in FY2019–FY2022. |
| Value-chain position | Tier-2 specialist sub-contractor and occasional JV main contractor. Downstream of steel mills and stockists; upstream of main contractors and public owners (LTA, Changi Airport Group, JTC, HK MTR/Highways). |
| Customer types | Main contractors (Japanese, Korean, Australian/Hong Kong and local), government agencies via JVs, and private developers. |
| End-markets | Rail and road infrastructure (MRT lines, North-South Corridor, Hong Kong trunk roads); aviation (Changi T5, Indian airports); institutional buildings (hospitals, ICA, sports centres); commercial and industrial buildings; formerly power and process plants (Middle East HRSG). |
Independent characterisation
Yongnam's model combined two businesses with opposite economics. Strutting generated recurring utilisation of an owned asset fleet and was a profitable niche when Singapore's MRT build-out ran at full tilt (2009–2015). It was, however, exposed to idle-asset costs between project waves. Structural steelwork was a fixed-price, capacity-driven fabrication business with thin margins, exposed to steel price, labour and productivity risk and to disputes over variation orders. Throughout FY2016–FY2022, management repeatedly attributed losses to "overhead costs not being fully absorbed" because strutting and fabrication volumes were too low (EDGE, 2017–2019; R20). That diagnosis points to a fixed-cost base sized for a peak market. Funding a large strut fleet and two fabrication yards with bank debt and leases left the group with little resilience. When COVID-19 halted Singapore sites for about five months in 2020 and post-pandemic inflation eroded margins on pre-2020 fixed-price contracts, the balance sheet could not absorb the losses (R20; AR22).
Strategy
Stated strategy before insolvency (AR22; R20; R22)
Management's final articulated strategy rested on five themes (paraphrased):
-
Positioning for a construction recovery. The company expected postponed mega-projects to return, naming Changi Airport T5, integrated resort expansions (MBS), the Cross Island Line, the Jurong Region Line and Jurong Lake District, Paya Lebar and Tengah developments.
-
Regional infrastructure pursuit. The company targeted Hong Kong infrastructure renewal and Australian projects, including the Melbourne Suburban Rail Loop.
-
Balance sheet repair through a strategic investor (UEM, later Turbo Vision), lender settlements, a scheme of arrangement with YNEC's unsecured creditors, settlement of the convertible bonds, and a rights issue of about S$6.3m.
-
Cost reduction, including the 2023 shutdown of the Malaysian fabrication facility, salary cuts (10–20% company-wide and up to 30% for management from June 2020), and disposal of low-utilisation strut materials.
-
Selective bidding. Management said it would be cautious in pursuing new projects given competitive intensity (R22).
Pipeline disclosures:
-
S$788m of targets in Singapore and Hong Kong (Feb 2021) (R20).
-
About S$780m pursued, including MBS expansion, the Jurong Region Line and the Cross Island Line (Feb 2023) (R22).
-
Historical pursuit figures of S$1.1bn (FY2014), S$1.5bn (2016) and S$1.7bn (FY2018) (EDGE; SGX).
Strategic initiatives register — last 24 months before delisting (Dec 2022 – Dec 2024)
| Date | Initiative | Targets / terms | Outcome |
|---|---|---|---|
| 19 Jan 2023 | UEM Assets investment | S$3m term loan; S$20m for 1.11bn shares at S$0.018; S$10m unlisted options; conditional on YNEC scheme | Superseded/updated 13 Apr 2023; not completed |
| 20–25 Jan 2023 | Schemes of arrangement and IRDA s64/s65 moratoria for company and YNEC | Moratoria granted 13 Feb 2023 to 15 May 2023; extended to 15 Aug 2023 | Extension to 15 Nov 2023 withdrawn at the 14 Aug 2023 hearing |
| 13 Apr 2023 | Turbo Vision Pte Ltd investment | S$3m term loan; S$20m new shares; options of S$10m (1-year, non-transferable) and S$20m (3-year, transferable) | Not completed |
| 6 Jul 2023 | YNEC–Turbo Vision JV agreement (Yongnam 2023 Pte Ltd, 30%) | — | Never commenced business; struck off 31 May 2024 |
| 2,023 | Malaysian fabrication facility shutdown | Opex reduction | Implemented |
| Nov 2023 – Aug 2024 | JM realisation programme: strut sales, contract novations, Malaysian land sale | Reduce secured bank debt; preserve project continuity for owners | Implemented (see Section 11) |
| 1 Aug 2024 | Applications for discharge from JM and winding up | Statutory JM objectives assessed as not achievable | Granted 23 Aug 2024 |
| 13 Nov 2024 | Delisting application | Debts exceed assets; no shareholder distribution expected | Approved 18 Nov 2024; effective 2 Dec 2024 |
ESG commitments, cost programmes and medium-term targets
ESG: no quantified emissions or sustainability-linked targets were identified in the sources reviewed.
Medium-term financial targets or guidance: none were ever issued. Each results announcement stated that no forecast or prospect statement had previously been disclosed (R22; H23).
Current strategy: the only operative "strategy" is the liquidators' statutory mandate to realise assets and distribute proceeds to creditors in order of priority.
Products & Services
Yongnam did not sell catalogued products with list prices. Its "products" were engineered systems and services delivered under contract, so the catalogue below is organised by business line and supported by named flagship projects. Pricing models were not publicly disclosed beyond the contract structures described.
Structural Steelworks
| Offering | Description / capabilities | Target customer | Flagship references (year of award, contract value where disclosed) |
|---|---|---|---|
| Structural steel detailing and engineering coordination | In-house detailers and engineers producing shop drawings and connection design; value engineering | Main contractors, design-and-build contractors | Integral to all steel contracts (AR22) |
| Heavy steel fabrication | Two yards (Tuas, Singapore; Nusajaya, Johor) with combined 84,000 t/yr capacity; CE-marked to EN 1090 EXC4; SSSS S1 accreditation | Main contractors on landmark buildings and infrastructure | MBS SkyPark (2008, S$50.3m with JFE Engineering); Gardens by the Bay cooled conservatories (2009); Singapore Sports Hub (2011, S$75.0m); National Art Gallery (2011, S$50.0m); Marina One (2013, S$168m, then a record) (SGX) |
| Steel erection | Rigging, crane operations (group owned cranes) and site installation | As above | Jewel Changi Airport and Senoko Food Hub (completed end FY2017) (EDGE) |
| Long-span aviation structures | Airport terminal roofs and hangars | Airport developers / contractors | Suvarnabhumi Airport; Delhi T3 (2008, S$70m); Mumbai T2 (2010, S$75.5m); Bangalore T2 (key FY2020 contributor) (AR22; SGX; R20) |
| Institutional and civic buildings | Hospitals, government buildings, sports centres | Main contractors on public projects | Singapore General Hospital (H9A); ICA Building (sub-contract from Penta-Ocean, Nov 2020); Punggol Regional Sports Centre; Mandai Crematorium expansion (AR22; SGX Jun 2024) |
| Industrial and logistics buildings | Factories, logistics hubs | Industrial developers / contractors | JTC Logistics Hub; JTC North Coast; Shimano factory (FY2020 contributors) (R20) |
| MRT station steel structures | Link bridges, entrances, roofs, protection enclosures | Rail JV contractors | J109 Jurong Region Line, three stations (scheduled completion 2026) (AR22) |
Specialist Civil Engineering
| Offering | Description / capabilities | Target customer | Flagship references |
|---|---|---|---|
| Modular Strutting System | Proprietary reusable steel strut system introduced in 1995. Described by the company as the industry's de facto cost-effective temporary support for deep excavations, and the first independently certified for reusability, with BCA-compliant traceability (AR22). | Tunnel/station contractors, basement builders | MRT Downtown Line 2/3, Circle Line, Thomson-East Coast Line; MCE cofferdam in the open sea at Marina Bay (AR22) |
| Earth Retaining & Stabilising Systems (ERSS) / ELS | Design, supply, installation and removal of sheet piles, soldier piles, struts and walers | Singapore and Hong Kong civil contractors | N111 (Ssangyong E&C, Dec 2019); C190 Integrated Train Testing Centre; Central Kowloon Route, Trunk Road T2, Tung Chung New Town Extension, HK–Shenzhen Innovation & Technology Park (AR22; SGX Aug 2024) |
| Pipe-pile cofferdams | Large-diameter pipe pile cofferdam systems | Rail and tunnel contractors | CR102 Cross Island Line (targeted 2027) (AR22) |
| Traffic and working decking | Temporary road decking over excavations | Road/rail contractors | N103/N105/N111 subcontracts; Jurong Region Line decking (AR22; JM Jul 2024) |
| Temporary pedestrian overhead bridges | Fabricated temporary footbridges | Road tunnel contractors | N105, Revenue House to Royal Square (Penta-Bachy JV, Nov 2019) (SGX Aug 2024) |
| Tunnel temporary works | Struts, sheet piles and soldier piles for bored-tunnel launch shafts and cross passages | Airport rail contractors | Changi MRT T316 twin bored tunnels to T5 (expected completion 2024) (AR22) |
| Australian temporary works | Strutting/temporary works on Victorian infrastructure | Australian contractors | Melbourne Metro; West Gate Tunnel (AR22 key executive profiles; EDGE May 2019) |
Mechanical Engineering
| Offering | Description | Flagship references |
|---|---|---|
| HRSG non-pressure parts | Supply and fabrication for combined-cycle power plants | Two Middle East power plants in Qatar and Egypt (completed FY2016) (EDGE May 2017) |
| Conveyor and plant structures | Belt conveyor structures | S$21.3m belt conveyor structure, Malaysia (Aug 2012) (SGX) |
| Power plant works | Via Jiwa Harmoni Offshore Sdn Bhd | 3 × 700MW coal-fired plant, Tanjung Bin, Johor (litigation with Ishi Power 2007–2010) (SGX) |
Design and Build
| Offering | Description | Flagship references |
|---|---|---|
| Turnkey industrial/commercial buildings | Design and construction of steel-framed buildings | Light industrial development at Kallang Junction (completed end FY2017) (EDGE); four-storey regional HQ and two-storey production facility at Tampines Industrial Crescent (completed FY2019/20) (R20) |
Main contracting through joint ventures
| JV | Scope | Value | Status |
|---|---|---|---|
| Leighton–Yongnam JV (30%) | N103: design and construction of 640m twin three-lane vehicular tunnels, underpinning of an expressway flyover, facility building and ramps; started 2H2019, planned completion 2026 | S$553.8m | Leighton terminated the JV deed and works were novated, Dec 2023 (SGX) |
| Daewoo–Yongnam JV | J109 Jurong Region Line: three stations (Toh Guan, Jurong Town Hall, Pandan Reservoir) and viaducts | S$320.4m | YNEC sub-contract to the JV novated to Aztec Steel effective 1 May 2024 (SGX 30 Jul 2024) |
| Yongnam–CAPE–JGC consortium | Hanthawaddy International Airport concession, Myanmar | — | Selected as tenderer Oct 2014; framework agreement Feb 2016; update Feb 2018; no evidence of financial close (SGX) |
Financial Narrative
Data integrity flags.
-
FY2022 figures are taken from the unaudited R22 announcement except where AR22 (audited) is cited. AR22's five-year summary agrees on revenue, loss before tax and loss after tax, but the audited FY2022 financial review shows G&A of S$17.1m (vs S$8.6m in R22, reflecting reclassification) and operating cash flow of S$18.5m (vs S$19.9m in R22).
-
FY2020 income statement lines are from R20 (unaudited) except loss after tax, loss per share, shareholders' equity and NAV, which are audited values from AR22. The company announced "material differences" between its unaudited and audited FY2020 figures (SGX, 14 Jul 2021). The audited FY2020 loss after tax was S$77.8m vs S$60.4m unaudited, a difference consistent with a write-off of about S$17.4m of deferred tax assets.
-
FY2018 figures come from AR22's five-year summary and NR18. Several FY2018 lines are not available.
-
EBITDA, ratios and margins are derived by this analyst from disclosed line items.
Income statement
FY2018 attributable loss is derived from basic LPS (9.76 cents) × 522.6m weighted shares. FY2020 attributable loss is derived from audited loss after tax of S$77.83m less the unaudited NCI share of S$0.18m. FY2018 DPS: no dividend was identified in the announcement index for that year. The last dividend-related announcement in the index is dated April 2014 (SGX).
FY2019–FY2020 exceptional items were embedded in G&A (e.g., S$17.4m restructuring costs and strut disposal losses in FY2019) rather than shown separately (R20). FY2020 taxation shown is the unaudited credit; audited taxation was lower by about S$17.5m.
Margins (%) — derived
Revenue CAGR: FY2018–FY2022: -3.3% a year. FY2019–FY2022: -10.4% a year. FY2017 (S$306.7m) to FY2022: -14.4% a year (derived from NR17, AR22).
Income statement commentary. The decisive feature of Yongnam's last five reported years is a persistently negative gross margin. The group lost money at the project level before overheads and interest in every year from FY2018 to FY2022. The drivers changed over time:
FY2018: provisions for lower negotiated variation orders on two structural steel projects and lower margins on Thomson MRT strutting work (NR18; EDGE).
FY2019: low fabrication and strutting utilisation, plus S$17.4m of restructuring costs and losses on disposal of strut assets booked in G&A (R20).
FY2020: the circuit breaker halted Singapore sites for about five months, Malaysian movement controls cut factory utilisation, and margins on delayed projects were revised down. Gross loss tripled to S$44.4m on revenue down 52.7% (R20).
FY2021–FY2022: revenue recovered, but contracts priced before COVID-19 absorbed energy, steel and labour inflation linked partly to the Russia–Ukraine war (AR22 CEO message).
The only positive EBITDA years (FY2021: S$10.5m; FY2022: S$2.1m) were far too small to service finance costs of S$10–12m a year. In FY2022, minority interests booked a S$8.2m profit while owners absorbed a S$43.9m loss (R22), which points to profitable non-wholly-owned JV interests coexisting with deep losses in wholly owned operations. Government COVID-19 support (Job Support Scheme and levy rebates of S$5.9m in FY2020) temporarily flattered G&A (R20) and faded by FY2022.
Balance sheet
FY2018 cash is the FY2019 opening balance (R20). FY2020 total equity is the audited 1 January 2021 balance per R22. No goodwill or intangibles were presented in the balance sheets reviewed.
FY2020 total assets are unaudited (R20) and include S$17.4m of deferred tax assets that the audited accounts appear to have written off. The debt split is derived from the condensed balance sheets (R20, R22) and differs from the AR22 summary basis by S$5–10m in FY2020–FY2022 owing to presentation differences.
1H2023 balance sheet (H23): total assets S$284.5m; cash S$2.67m; borrowings S$101.0m (all current); lease liabilities S$39.8m; convertible bonds S$5.45m; net current liabilities S$130.2m; total equity S$46.0m; NAV per share 6.62 cents; net gearing 2.26×. The S$2.5m restricted bank balance was released, and borrowings rose after a financial institution called an advance payment bond.
Balance sheet commentary. Shareholders' equity fell from S$304.3m at end FY2017 to S$59.8m at end FY2022, an 80% erosion in five years (AR22). PPE shrank by S$130m over FY2018–FY2022 through depreciation, disposals of low-utilisation struts to raise cash, and a S$6.5m impairment of Malaysian freehold land in FY2022. Net debt stayed broadly flat in absolute terms at S$125–170m. Leverage therefore rose almost entirely because equity was being destroyed, not because debt was added.
The reclassification of all bank borrowings to current at end FY2022 (S$96.4m current, nil non-current, vs S$63.1m non-current a year earlier) reflected defaults on bank and debt obligations, as EY noted in its disclaimer (AR22). This was the accounting signal of insolvency. The final reported cash balance of about S$2m against S$217m of current liabilities left no liquidity buffer.
Cash flow
Source: R20 and R22 cash flow statements. Interest paid is classified within operating cash flow in the company's statements. AR22 reports audited FY2022 OCF of S$18.5m.
1H2023 (H23): operating cash flow -S$1.70m (1H2022: +S$12.26m); capex -S$6.33m; new borrowings +S$11.41m; repayments -S$6.48m; lease payments -S$3.92m.
Cash flow commentary. Operating cash flow was flattered in FY2019 and FY2020 by liquidating working capital: contract assets fell by S$34m in FY2020 and inventories were run down (R20). It was not driven by underlying earnings. After deducting lease payments, which are economically part of the cost of maintaining the strut fleet and yards, free cash flow was negative in every year: -S$4.0m (FY2019), +S$1.0m (FY2020), -S$26.5m (FY2021) and -S$4.7m (FY2022), all derived. The group funded itself by selling assets (S$47m of PPE disposal proceeds over four years), issuing convertible bonds and placing equity at falling prices. By 1H2023 operating cash flow had turned negative.
Ratios — derived
Net debt / EBITDA: not meaningful in FY2019–FY2020 (negative EBITDA); 14.1× in FY2021 and 63.8× in FY2022 (derived). Cash conversion cycle: not computed. Cost-of-sales-based payables and inventory days are distorted by strut-fleet consumption accounting and by the absence of a full FY2022 receivables ageing in the sources reviewed.
Ratio commentary. Every solvency metric deteriorated steadily from FY2019. By FY2022, EBITDA covered only 0.17× of finance costs, the current ratio was 0.41×, and net debt was roughly 64 times EBITDA. ROE was negative in all five years, and the FY2020 and FY2022 losses each consumed about half of average equity. Asset turnover of 0.2–0.5× is very low for a contractor and reflects the heavy owned asset base. Asset-heavy sub-contracting financed with debt was the structural flaw behind the collapse.
Order book
Sources: NR18; R20; AR22. Order book was S$152m at end FY2017 (NR17) and S$363.3m at 30 June 2023 (H23).
A sizeable order book did not protect Yongnam because the backlog was largely unprofitable. Contracts won in 2018–2020, during an industry trough and before COVID-19, were priced before the post-2021 surge in costs. Management said in AR22 that margins on pre-pandemic contracts had been adversely impacted. Executing the S$543m backlog therefore deepened losses. By 1H2023 management acknowledged that financial difficulty was making new wins much harder (H23).
Longer-run context: revenue and attributable result, FY2014–FY2017
FY2015 and FY2016 year-end order books are not available in the sources reviewed and are entered as 0.0 placeholders; they should not be read as zero backlog. Order book was S$302m at 30 Sep 2016 (SGX profit warning, 21 Feb 2017). FY2013 net profit was S$5.5m and FY2013 revenue was about S$361.8m, derived from the 41.4% FY2014 decline (EDGE).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Country | Role (as understood) | Status (latest known) |
|---|---|---|---|
Yongnam Holdings Limited | Singapore | Listed holding company | In liquidation since 23 Aug 2024; delisted 2 Dec 2024 |
Yongnam Engineering & Construction (Private) Limited (YNEC) | Singapore | Key operating subsidiary (fabrication, strutting, contracting) | In liquidation since 23 Aug 2024 |
YNE Project Engineering Pte Ltd | Singapore | Project engineering | — |
Yongnam Development Pte Ltd | Singapore | Property/development holding | — |
Yongnam Investment Pte Ltd | Singapore | Investment holding | — |
Yongnam Engineering Sdn Bhd (YESB) | Malaysia | Nusajaya fabrication facility operator | Creditors' voluntary winding up (KPMG Malaysia) from Feb 2024 |
Yongnam Engineering & Construction Sdn Bhd | Malaysia | Malaysian contracting (est. May 2015) | — |
Jiwa Harmoni Offshore Sdn Bhd | Malaysia | Mechanical/plant works (Tanjung Bin power plant litigation 2007–2010) | — |
Yongnam Steel Work System Engineering (Shanghai) Co. Ltd | PRC | Steelwork systems | — |
Yongnam Steel Work System Engineering (Jinjiang) Co. Ltd | PRC | Steelwork systems | — |
Yongnam Engineering (HK) Limited | Hong Kong | Hong Kong ELS/strutting operations | — |
Yongnam Engineering & Construction (Thailand) Ltd | Thailand | Regional contracting | — |
Yongnam Myanmar Co., Limited | Myanmar | Est. Dec 2015 for Hanthawaddy airport pursuit | — |
Yongnam – Jian Huang Joint Venture | Singapore | Contracting JV | — |
Leighton–Yongnam JV (30%) | Singapore | N103 main contract | JV deed terminated by Leighton, Dec 2023 |
Daewoo–Yongnam JV | Singapore | J109 main contract | Sub-contract novated to Aztec Steel, Jul 2024 |
Yongnam 2023 Pte Ltd (30%, associate) | Singapore | JV with Turbo Vision, incorporated 12 Jul 2023 | Struck off 31 May 2024 (never commenced business) |
“—” = not publicly disclosed.
Business Lines
| Business line (SGD Mn) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Structural steelworks | 70.69 | 46.23 | 46.08 | 49.78 |
Specialist civil engineering | 92.97 | 44.39 | 71.41 | 91.33 |
Mechanical engineering | 0.09 | 0.03 | 0.00 | 0.05 |
Design and build | 26.01 | 1.20 | 0.00 | 0.04 |
Others | 6.52 | 1.01 | 4.42 | 0.00 |
Total revenue | 196.27 | 92.85 | 121.91 | 141.20 |
Revenue by Segment (%) and Segment Margins & Growth (%)
| Business line metric (%) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Structural steelworks share of revenue | 36.0 | 49.8 | 37.8 | 35.3 |
Specialist civil engineering share of revenue | 47.4 | 47.8 | 58.6 | 64.7 |
Design and build share of revenue | 13.3 | 1.3 | 0.0 | 0.0 |
Structural steelworks YoY growth | 0.0 | -34.6 | -0.3 | 8.0 |
Specialist civil engineering YoY growth | 0.0 | -52.3 | 60.9 | 27.9 |
Results by Segment
| Geographic segment result (SGD Mn) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Singapore segment result | -43.99 | -49.77 | -13.42 | -13.43 |
Rest of Asia Pacific segment result | -1.11 | -11.05 | -6.91 | -10.64 |
Eliminations | -1.99 | 0.82 | 2.84 | 0.69 |
Group segment result | -47.08 | -60.00 | -17.49 | -23.38 |
Geographic segment margin (%)
| Geographic segment margin (%) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Singapore result / Singapore external revenue | -31.8 | -78.0 | -13.4 | -12.9 |
Rest of Asia Pacific result / RoAP external revenue | -1.9 | -38.0 | -32.1 | -28.9 |
Business Lines (FY2016–FY2018)
| Business line (SGD Mn) | FY2016 | FY2017 | FY2018 |
|---|---|---|---|
Structural steelworks | 215.6 | 196.2 | 81.6 |
Specialist civil engineering | 66.2 | 89.0 | 64.3 |
Mechanical engineering | 32.1 | 1.7 | 4.5 |
Design and build | 7.5 | 19.8 | 11.0 |
Total revenue | 321.4 | 306.7 | 161.4 |
Revenue by Segment
| Metric (SGD Mn) | 1H2022 | 1H2023 |
|---|---|---|
Structural steelworks revenue | 28.00 | 17.08 |
Specialist civil engineering revenue | 46.64 | 53.63 |
Others revenue | 0.06 | -0.02 |
Total revenue | 74.70 | 70.69 |
Singapore external revenue | 54.07 | 42.80 |
Rest of Asia Pacific external revenue | 20.63 | 27.89 |
Singapore segment result | -2.56 | -0.81 |
Rest of Asia Pacific segment result | -0.46 | -6.32 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansIncome Statement and Per-Share Data
| Metric (SGD Mn) | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|---|
Revenue | 161.45 | 196.27 | 92.85 | 121.91 | 141.20 |
Gross profit (loss) | -45.90 | -14.84 | -44.37 | -4.09 | -8.48 |
Loss before tax | -66.05 | -59.56 | -72.31 | -27.15 | -35.60 |
Loss after tax | -54.21 | -54.70 | -77.83 | -27.09 | -35.72 |
Net loss attributable to owners | -51.00 | -53.76 | -78.00 | -27.24 | -43.89 |
Basic and diluted EPS (S cents) | -9.76 | -10.29 | -14.93 | -4.63 | -6.40 |
Dividend per share (S cents) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Income Statement
| Metric (SGD Mn) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Other income | 1.67 | 2.15 | 3.46 | 2.16 |
General and administrative expenses (unaudited presentation) | -33.92 | -17.41 | -5.56 | -8.55 |
Finance costs | -12.90 | -12.32 | -10.21 | -12.23 |
Exceptional items (as separately presented) | 0.00 | 0.00 | -11.30 | -8.52 |
Depreciation | 33.02 | 35.93 | 27.44 | 25.51 |
Operating result (group segment result, EBIT proxy) | -47.08 | -60.00 | -17.49 | -23.38 |
EBITDA (derived: LBT + finance costs − interest income + depreciation) | -13.66 | -24.07 | 10.50 | 2.14 |
Taxation | 4.86 | 11.96 | 0.06 | -0.13 |
Margin (%)
| Margin (%) | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|---|
Gross margin | -28.4 | -7.6 | -47.8 | -3.4 | -6.0 |
Net margin (loss after tax / revenue) | -33.6 | -27.9 | -83.8 | -22.2 | -25.3 |
Margin (%) (FY2019–FY2022)
| Margin (%) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Operating margin (segment result / revenue) | -24.0 | -64.6 | -14.3 | -16.6 |
EBITDA margin | -7.0 | -25.9 | 8.6 | 1.5 |
Balance Sheet and Per-Share Data
| Metric (SGD Mn) | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|---|
Property, plant and equipment | 314.80 | 268.68 | 251.24 | 215.03 | 184.59 |
Cash and bank balances | 14.26 | 9.12 | 7.93 | 2.91 | 2.09 |
Total borrowings incl. leases and convertibles (AR22 summary basis) | 140.07 | 178.98 | 164.47 | 151.27 | 138.56 |
Net debt (derived: borrowings − cash) | 125.81 | 169.87 | 156.54 | 148.36 | 136.47 |
Shareholders' equity | 253.81 | 199.85 | 121.48 | 101.89 | 59.81 |
Total equity incl. non-controlling interests | 245.66 | 190.75 | 112.56 | 93.12 | 59.20 |
Goodwill and intangibles | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
NAV per share (S cents) | 48.57 | 38.24 | 23.25 | 15.86 | 8.50 |
Net gearing (company-reported, times) | 0.51 | 0.62 | 0.90 | 1.12 | 1.65 |
Balance Sheet
| Metric (SGD Mn) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Total assets | 461.99 | 402.54 | 350.87 | 310.22 |
Current assets | 139.74 | 89.35 | 90.20 | 87.75 |
Current liabilities | 202.64 | 164.04 | 155.01 | 216.61 |
Working capital (current assets − current liabilities) | -62.90 | -74.69 | -64.81 | -128.86 |
Debt due within one year (bank, HP, leases, bonds/CBs) | 110.38 | 66.27 | 57.70 | 109.90 |
Debt due after one year (bank, HP, leases, bonds/CBs) | 68.60 | 108.46 | 102.74 | 34.41 |
Contract assets | 70.58 | 36.57 | 45.04 | 42.69 |
Trade creditors | 58.51 | 50.41 | 52.93 | 60.79 |
Cash Flow
| Metric (SGD Mn) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Operating cash flow before working capital | 7.67 | -19.38 | 19.30 | 11.03 |
Net operating cash flow | 29.12 | 31.96 | 6.55 | 19.88 |
Capital expenditure (purchase of PPE) | -26.95 | -22.91 | -20.77 | -13.29 |
Free cash flow (derived: OCF − capex) | 2.16 | 9.05 | -14.21 | 6.59 |
Proceeds from disposal of PPE | 12.69 | 3.42 | 22.15 | 9.19 |
Interest paid | -12.04 | -10.78 | -9.25 | -10.96 |
Lease payments | -6.16 | -8.04 | -12.32 | -11.27 |
Equity issued | 0.00 | 0.00 | 5.41 | 0.00 |
Convertible bonds issued | 12.50 | 0.00 | 0.00 | 0.00 |
Dividends paid | 0.00 | 0.00 | 0.00 | 0.00 |
Share buybacks | 0.00 | 0.00 | 0.00 | 0.00 |
Returns & Leverage Ratios (%)
| Ratio | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|---|
ROE (%) — attributable loss / average shareholders' equity | -18.3 | -23.7 | -48.5 | -24.4 | -54.3 |
Net gearing (×, company-reported) | 0.51 | 0.62 | 0.90 | 1.12 | 1.65 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
ROA (%) — loss after tax / year-end total assets | -11.8 | -19.3 | -7.7 | -11.5 |
Pre-tax ROIC (%) — EBIT / (total equity + net debt) | -13.1 | -22.3 | -7.2 | -11.9 |
Current ratio (×) | 0.69 | 0.54 | 0.58 | 0.41 |
Debt / total equity (×, AR22 borrowings basis) | 0.94 | 1.46 | 1.62 | 2.34 |
Interest coverage (×) — EBIT / finance costs | -3.65 | -4.87 | -1.71 | -1.91 |
EBITDA / finance costs (×) | -1.06 | -1.95 | 1.03 | 0.17 |
Asset turnover (×) — revenue / year-end total assets | 0.42 | 0.23 | 0.35 | 0.46 |
Key Financials and Financial Ratios (x)
| Metric (SGD Mn) | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|---|
Order book at year end | 366.0 | 405.7 | 543.0 | 464.3 | 396.5 |
Order book / revenue (×, derived) | 2.27 | 2.07 | 5.85 | 3.81 | 2.81 |
Income Statement (FY2014–FY2017)
| Metric (SGD Mn) | FY2014 | FY2015 | FY2016 | FY2017 |
|---|---|---|---|---|
Revenue | 212.0 | 269.6 | 321.4 | 306.7 |
Net loss attributable to owners | -8.5 | -3.3 | -31.6 | -15.8 |
Order book at year end | 405.0 | 0.0 | 0.0 | 152.0 |
Revenue by Region
| Region (SGD Mn) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Singapore | 138.46 | 63.80 | 100.42 | 104.37 |
Rest of Asia Pacific | 57.82 | 29.05 | 21.49 | 36.83 |
Total | 196.27 | 92.85 | 121.91 | 141.20 |
Revenue by Region (%) and Region Margins & Growth (%)
| Region metric (%) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Singapore share of revenue | 70.5 | 68.7 | 82.4 | 73.9 |
Rest of Asia Pacific share of revenue | 29.5 | 31.3 | 17.6 | 26.1 |
Singapore YoY growth | 0.0 | -53.9 | 57.4 | 3.9 |
Rest of Asia Pacific YoY growth | 0.0 | -49.8 | -26.0 | 71.4 |
Business Lines — Structural steelworks
| Business line | Singapore | Rest of Asia Pacific |
|---|---|---|
Structural steelworks | Core: hospitals, ICA, sports centres, JTC hubs, MRT station steel | India (Bangalore T2, earlier Delhi and Mumbai); Malaysia; earlier Middle East |
Specialist civil engineering | Core: Changi T5/T316, N103/N105/N111, CR102, C190, J109 | Hong Kong (CKR, Trunk Road T2, TCNTE, HSITP, LRT Tin Wing); Australia (Victoria) |
Design and build | Tampines, Kallang (to FY2019) | — |
Mechanical engineering | Minimal | Qatar, Egypt (to FY2016); Malaysia |
“—” = not publicly disclosed.
Share Price History
| Date | Price / event | Source |
|---|---|---|
Jan 2007 | Placement at S$0.161 (pre-2015 consolidation basis) | SGX |
May 2007 | Placement at S$0.33 (pre-consolidation basis) | SGX |
Oct 2017 | Placement at S$0.255 | SGX |
1 Mar 2018 | Close S$0.30 | EDGE |
15 May 2018 | Close S$0.31 | EDGE |
28 Feb 2019 | Close S$0.17 | EDGE |
May 2021 | Placement at S$0.076 | SGX |
22 Nov 2022 | Last full trading day; VWAP S$0.0254; last close S$0.026 | UEM; Investing.com |
Jan 2023 | Proposed UEM subscription price S$0.018 (29.1% discount to VWAP) | UEM |
2 Dec 2024 | Delisted; no expected value to shareholders | LIQ |
Valuation Snapshot
| Multiple | Value | Basis |
|---|---|---|
Market capitalisation | S$18.3m | 703.94m shares |
P/B | 0.31× | FY2022 NAV 8.50 cents (R22) |
Enterprise value | ≈S$154.8m | Market cap + FY2022 net debt S$136.5m (AR22 basis) |
EV/Sales | ≈1.10× | FY2022 revenue S$141.2m |
EV/EBITDA | ≈72× | FY2022 derived EBITDA S$2.14m |
Share Count (million shares)
| Metric (million shares) | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|---|
Issued shares at year end | 522.60 | 522.60 | 522.60 | 642.54 | 703.94 |
Unissued shares under convertible bonds | 0.00 | 69.83 | 69.83 | 164.80 | 103.40 |
Analyst Conclusions
Guidance and consensus
There is no management guidance and no consensus. The company is in compulsory liquidation, its shares are delisted, and no financial statements have been published since 1H2023. The relevant "outlook" is the liquidation outcome for creditors. The liquidators' statements of affairs, presented on 11 November 2024, showed liabilities far exceeding assets. They indicated no distribution to shareholders, and the size of any distribution to unsecured creditors has not been disclosed (LIQ).
Bull-case arguments (residual recovery perspective, for creditors)
-
Tangible collateral base: at 30 Jun 2023 the group held PPE of S$174.1m, including S$130.6m of steel beams and columns and S$20.1m of freehold land (H23). Even at a deep discount, steel and land realisations could repay a meaningful share of secured bank debt (S$85.2m secured at 1H2023).
-
Liability transfer through novation: the 2023–2024 novations moved ongoing contract obligations and defaults (from defined effective dates) to Aztec Steel and other parties. This may have reduced liquidated damages and completion claims against the estate (SGX novation announcements).
-
Strong end-market for recovered assets: record Singapore construction demand (S$50.5bn in 2025) and rising civil engineering demand (BCA) should support resale prices for strutting and decking steel.
Bear-case arguments
-
Structural deficiency: the liquidators' statements of affairs showed debts far exceeding assets (LIQ, 13 Nov 2024). Equity is worthless, and unsecured recoveries are likely to be low.
-
Secured priority and realisation discounts: UOB and the Maybank syndicate rank ahead of trade creditors. Book values were never tested by an audit opinion (FY2022 disclaimer), and realisation-basis adjustments flagged by EY were never booked (AR22).
-
Contingent claims: Malaysian landlord, supplier and service-provider suits, bond calls and main-contractor back-charges may dilute the unsecured pool (SGX).
Key monitorables (next 12 months)
| Monitorable | Why it matters |
|---|---|
| Liquidators' reports to the Committee of Inspection / creditors | Realisation proceeds and dividend prospects |
| Completion of the YESB (Malaysia) liquidation | Outcome of Malaysian claims and asset sales |
| Any proceedings against former officers or claw-back actions | Potential additional recoveries (none disclosed to date) |
| Dissolution of company and YNEC | Final closure of the estate |
| Aztec Steel's execution of novated contracts | Continuity of Singapore temporary works and steelwork capacity |
| Singapore T5, MBS and CRL awards | Indicates demand for capacity formerly supplied by Yongnam |
Analyst verdict
Yongnam Holdings is a case study in how a technically respected specialist contractor can be destroyed by its capital structure and contract-pricing discipline rather than by a lack of capability or demand. For two decades it delivered some of Singapore's most demanding steel structures and pioneered a reusable strutting system that became standard practice in deep excavations. These were real competitive advantages, and they appear in a track record that main contractors and public owners trusted.
The financial record from FY2014 tells a different story. Revenue halved from more than S$300m in FY2016–FY2017 to S$92.9m in FY2020, and recovered only to S$141.2m in FY2022. Gross margins were negative in every year from FY2018 to FY2022. Equity fell from S$304m to S$60m in five years, while net debt stayed at S$125–170m. Management's recurring explanation, unabsorbed overheads, was accurate but never resolved. The asset base of two fabrication yards and a large owned strut fleet, financed by bank loans and leases, was sized for a peak that did not return in time.
COVID-19 was the proximate trigger, and post-2021 inflation on fixed-price contracts the coup de grâce. The rescue sequence — convertible bonds, discounted placements, the UEM and then Turbo Vision term sheets, and creditor schemes — was too small and too late, and secured lenders ultimately chose judicial management. The FY2022 disclaimer of opinion and the 2024 novation of virtually the entire order book to a competitor confirmed that the enterprise value had migrated elsewhere.
For investors the conclusion is final: equity holders were wiped out, and the shares were delisted in December 2024. For creditors, recovery depends on steel and land realisations whose values were never audited on a realisation basis. For industry observers, the lesson is that in cyclical construction niches, order-book size is no substitute for margin quality, liquidity and conservative leverage.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Appointed | Age (Apr 2023) | Background / education | FY2022 total remuneration (SGD K) | Mix |
|---|---|---|---|---|---|---|
Seow Soon Yong | Managing Director & CEO; also performed the role of Chairman | 19 Oct 1994 | 68 | Joined Yongnam 1978 (marketing, project and general management); CEO since 1994; pioneered the Modular Strutting System | 347 | 89% salary, 11% other |
Siau Sun King | Executive Director (Malaysia operations; Mechanical Engineering Division) | 19 Oct 1994 | 75 | Founding member; Mechanical Engineering, Ngee Ann Polytechnic; sibling of Seow Soon Yong | 240 | 77% salary, 23% other |
Chia Sin Cheng | Executive Director & Finance Director | 8 Jan 2007 | — | ICAEW Chartered Accountant (1980); Ernst & Young (London, Singapore); 15 years at WBL Corporation; CFO of Singapore Computer Systems; Harvard AMP | 280 | 94% salary, 6% other |
Tan Eng Kiat, Dominic | Lead Independent Director; Chair of AC and NC | 3 Mar 2008 | — | 40+ years in construction; rose to Executive Director at Gammon (Malaya); Managing Director of United Engineers Group (retired 2007) | 61 | 100% fees |
Lim Ghim Siew, Henry | Independent Director; Chair of RC | 15 Oct 2002 | — | Owner of G. S. Lim & Partners; LLB (London); called to the English Bar 1992 | 51 | 100% fees |
Teng Kian Jen, Ben | Independent Director | 15 Oct 2020 | — | NUS Civil Engineering (Hons); Changi Airport Investments; CNA Integrated Technologies (Dubai); Abu Dhabi Airports (Midfield Terminal); MD of Vector Infotech | 48 | 100% fees |
“—” = not publicly disclosed.
Board of Directors — Seow Soon Hock
| Name | Role | Joined | Notes |
|---|---|---|---|
Seow Soon Hock | Production Director | 1978 | Brother of CEO; FY2022 pay band S$200,001–300,000 |
Chelvadurai Harendran | Engineering Director | 1997 | Ex-Ove Arup, Woh Hup, Low Keng Huat; BSc (UCL); CEng, PE (Singapore) |
Yang Eun Kyu | Director – Technical (Civil) | 2015 | 40+ years with a Korean contractor; BSc Civil Engineering, Hanyang University |
Sik Kay Lee | Project Director | 2020 | BSc Engineering (Leicester) |
Cheong Hock Choon | Project Director (Hong Kong) | 1978 | Heads Hong Kong operations |
Koh Eng Seng | Director – Specialist Civil Engineering | 1981 | Led MRT, KPE and MCE temporary works |
Teo Sheng Kiong | Group Financial Controller | 2002 (returned 2007) | 1st Class Hons, Lancaster University |
Board & Management Changes
| Date | Change | Source |
|---|---|---|
24 Jul 2020 | Retirement of an executive director announced | SGX |
15 Oct 2020 | Appointment of Teng Kian Jen, Ben, and resignation of another independent director; board committees reconstituted | SGX; AR22 |
14 Jul 2021 | Retirement of a lead independent non-executive director announced; board reconstituted 30 Jul 2021 | SGX |
11 Aug 2023 | Resignation of the Lead Independent Non-Executive Director announced | SGX |
Jan–Feb 2024 | Applications to SGX-ST for extension of time to fill the Audit Committee vacancy | SGX |
14 Aug 2023 | Judicial managers (KPMG) assume management | JM |
23 Aug 2024 | Liquidators (KPMG) appointed; JMs discharged | LIQ |
Major Shareholders
| Holder | Shares (as at 21 Jan 2023) | % of 703,942,767 shares (derived) |
|---|---|---|
Seow Soon Yong — direct | 86,105,007 | 12.23 |
Seow Soon Yong — deemed (via Yongnam Private Limited) | 4,082,108 | 0.58 |
Siau Sun King — direct | 2,784,217 | 0.40 |
Chia Sin Cheng — direct | 3,713,494 | 0.53 |
Lim Ghim Siew, Henry — direct | 225,000 | 0.03 |
Tan Eng Kiat, Dominic — direct | 225,000 | 0.03 |
Competitive Landscape
Key Competitors
| Competitor | Type | Segment overlap | Relative positioning vs Yongnam |
|---|---|---|---|
Aztec Steel Pte Ltd | Private (Singapore) | Structural steelwork; temporary steel works | Replacement sub-contractor on most YNEC novations in 2024. The direct successor in Yongnam's Singapore niche and the clear beneficiary of its exit |
KTC Civil Engineering & Construction Pte Ltd | Private (Singapore) | Structural steel; civil engineering | Former MBS partner (2008); established local competitor |
JFE Engineering Corporation | Listed parent (JFE Holdings, Japan) | Complex long-span steel structures | Former SkyPark partner; global technical leader with far greater scale |
China Construction Steel Structure / CSCEC group | State-owned (PRC) | Mega steel structures across Asia | Scale and balance-sheet advantage on large commercial and aviation steel |
BBR Holdings (Singapore) | SGX-listed | Specialist engineering (e.g., post-tensioning, foundations) | Overlap in specialist-contractor positioning |
CSC Holdings (Singapore) | Singapore foundation/geotechnical group | Foundations, ERSS and geotechnical works | Overlap in deep-excavation temporary works |
Hiap Seng Industries | Singapore | Plant fabrication and engineering | Overlap with the former Mechanical Engineering line |
Koh Brothers Eco Engineering | SGX-listed | Civil and infrastructure engineering | Competes for infrastructure packages (as main contractor) |
OKP Holdings | SGX-listed | Civil engineering (roads, infrastructure) | Infrastructure main-contract overlap |
Hong Kong ELS specialists (unnamed local firms) | Private | Hong Kong excavation and lateral support | Competed for Hong Kong road and MTR temporary works |
Competitor Detail
| Metric (latest available) | Yongnam (FY2022) |
|---|---|
Revenue | S$141.2m |
Revenue growth | 15.8% |
Gross margin | -6.0% |
Net margin | -25.3% |
Fabrication capacity | 84,000 t/yr (two yards) |