Yongnam Holdings Limited Overview

Yongnam was, for most of its listed life, one of Singapore's best-known specialist steel contractors. It operated in two niches that sat between the main contractor and the raw-steel supply chain. The first was heavy, complex structural steelwork: detailing, fabrication and erection for airports, stadia, integrated resorts and landmark commercial buildings. The second was specialist civil engineering, built around a proprietary, reusable Modular Strutting System and related temporary earth-retaining and decking works for deep excavations on MRT lines, road tunnels and other infrastructure. Its track record included the Marina Bay Sands SkyPark, Gardens by the Bay, the Singapore Sports Hub, Jewel Changi Airport and several Indian airport terminals. From 2014 the group recorded nine consecutive annual losses. Margin erosion on fixed-price sub-contracts, chronic under-utilisation of fabrication capacity, the 2020 COVID-19 site shutdown and post-pandemic cost inflation, combined with high leverage, ended in judicial management in 2023, liquidation in 2024 and delisting.


What the company did

Yongnam was an investment holding company whose subsidiaries provided engineering and construction services in Singapore and the wider Asia-Pacific region. Its operating hub was YNEC in Singapore, supported by a fabrication facility in Nusajaya, Johor, Malaysia (Yongnam Engineering Sdn Bhd), a Hong Kong subsidiary (Yongnam Engineering (HK) Limited), and dormant or smaller entities in the PRC, Thailand and Myanmar (AR22 directorship disclosures).

Revenue was reported across five business lines (R22; R20):

  1. Structural Steelworks: engineering coordination, shop detailing, fabrication and erection of structural steel for long-span aircraft hangars, high-rise buildings, commercial and industrial buildings, hospitals and infrastructure.

  2. Specialist Civil Engineering: design, supply, installation and dismantling of temporary steel works for deep excavations. These included modular steel struts, sheet piles, soldier piles, pipe-pile cofferdams, earth retaining and stabilising structures (ERSS), traffic and working decking, and temporary pedestrian bridges. In Hong Kong the equivalent scope is excavation and lateral support (ELS) works.

  3. Mechanical Engineering: fabrication of non-pressure parts for heat recovery steam generators (HRSG), conveyor structures and similar plant steelwork. This line was material only until FY2016.

  4. Design and Build: turnkey light-industrial and commercial buildings in Singapore. This line was material only until FY2019.

  5. Others: sundry revenue, including material sales.

In addition, the group took main-contractor positions through joint ventures on large infrastructure packages. These were a 30% share of the Leighton–Yongnam JV for North-South Corridor Contract N103 (S$553.8 million contract value) and the Daewoo–Yongnam JV for Jurong Region Line Contract J109 (S$320.4 million contract value) (SGX, 23 May 2018 and 20 Jul 2020; AR22).

Company's own description (paraphrased from AR22)

In its final annual report, Yongnam described itself as a steel construction specialist with more than five decades of experience. It cited two production facilities, in Singapore and in Nusajaya, Johor, with a combined annual fabrication capacity of 84,000 tonnes. It highlighted its Modular Strutting System as its key competitive edge, saying the system was the first in Singapore to be certified by an independent auditor for reusability in earth-retaining or stabilising structures, with a traceability procedure meeting BCA requirements. It listed its certifications: ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018; CE marking to EN 1090-1/-2 and EN ISO 3834-2 up to execution class EXC4; S1 (highest) fabricator accreditation from the Singapore Structural Steel Society; BCA A2 grades in General Building and Civil Engineering; and bizSAFE Star. Its stated ambition was to be "the partner of choice in providing solutions for the steel construction industry" (AR22, Corporate Profile).

Business and revenue model

DimensionCharacterisation
Product vs. service mixEffectively 100% project/contract revenue (services plus fabricated product). There was no subscription or licensing income. Strut systems were supplied and installed under rental-like sub-contracts (install–maintain–dismantle), but revenue was recognised as construction contract revenue over time using a cost-based input method (R22, Note 1.2a).
Contract formPredominantly sub-contracts to main contractors (e.g., Penta-Ocean, Ssangyong E&C, Penta-Bachy JV, Daewoo-Yongnam JV), plus JV main contracts with the LTA (SGX novation announcements 2024).
Revenue recognitionOver time; variation orders and claims were a material source of estimation risk and of repeated provisions (FY2014, FY2016, FY2018) (EDGE; SGX profit warning, 21 Feb 2017).
Capital intensityVery high for a sub-contractor. PPE was S$184.6m at end FY2022, of which steel beams and columns (the strut fleet) were S$137.5m (R22, Note 6). Depreciation ran at S$25–36m a year in FY2019–FY2022.
Value-chain positionTier-2 specialist sub-contractor and occasional JV main contractor. Downstream of steel mills and stockists; upstream of main contractors and public owners (LTA, Changi Airport Group, JTC, HK MTR/Highways).
Customer typesMain contractors (Japanese, Korean, Australian/Hong Kong and local), government agencies via JVs, and private developers.
End-marketsRail and road infrastructure (MRT lines, North-South Corridor, Hong Kong trunk roads); aviation (Changi T5, Indian airports); institutional buildings (hospitals, ICA, sports centres); commercial and industrial buildings; formerly power and process plants (Middle East HRSG).

Independent characterisation

Yongnam's model combined two businesses with opposite economics. Strutting generated recurring utilisation of an owned asset fleet and was a profitable niche when Singapore's MRT build-out ran at full tilt (2009–2015). It was, however, exposed to idle-asset costs between project waves. Structural steelwork was a fixed-price, capacity-driven fabrication business with thin margins, exposed to steel price, labour and productivity risk and to disputes over variation orders. Throughout FY2016–FY2022, management repeatedly attributed losses to "overhead costs not being fully absorbed" because strutting and fabrication volumes were too low (EDGE, 2017–2019; R20). That diagnosis points to a fixed-cost base sized for a peak market. Funding a large strut fleet and two fabrication yards with bank debt and leases left the group with little resilience. When COVID-19 halted Singapore sites for about five months in 2020 and post-pandemic inflation eroded margins on pre-2020 fixed-price contracts, the balance sheet could not absorb the losses (R20; AR22).

Strategy

Stated strategy before insolvency (AR22; R20; R22)

Management's final articulated strategy rested on five themes (paraphrased):

  1. Positioning for a construction recovery. The company expected postponed mega-projects to return, naming Changi Airport T5, integrated resort expansions (MBS), the Cross Island Line, the Jurong Region Line and Jurong Lake District, Paya Lebar and Tengah developments.

  2. Regional infrastructure pursuit. The company targeted Hong Kong infrastructure renewal and Australian projects, including the Melbourne Suburban Rail Loop.

  3. Balance sheet repair through a strategic investor (UEM, later Turbo Vision), lender settlements, a scheme of arrangement with YNEC's unsecured creditors, settlement of the convertible bonds, and a rights issue of about S$6.3m.

  4. Cost reduction, including the 2023 shutdown of the Malaysian fabrication facility, salary cuts (10–20% company-wide and up to 30% for management from June 2020), and disposal of low-utilisation strut materials.

  5. Selective bidding. Management said it would be cautious in pursuing new projects given competitive intensity (R22).

Pipeline disclosures:

  • S$788m of targets in Singapore and Hong Kong (Feb 2021) (R20).

  • About S$780m pursued, including MBS expansion, the Jurong Region Line and the Cross Island Line (Feb 2023) (R22).

  • Historical pursuit figures of S$1.1bn (FY2014), S$1.5bn (2016) and S$1.7bn (FY2018) (EDGE; SGX).

Strategic initiatives register — last 24 months before delisting (Dec 2022 – Dec 2024)

DateInitiativeTargets / termsOutcome
19 Jan 2023UEM Assets investmentS$3m term loan; S$20m for 1.11bn shares at S$0.018; S$10m unlisted options; conditional on YNEC schemeSuperseded/updated 13 Apr 2023; not completed
20–25 Jan 2023Schemes of arrangement and IRDA s64/s65 moratoria for company and YNECMoratoria granted 13 Feb 2023 to 15 May 2023; extended to 15 Aug 2023Extension to 15 Nov 2023 withdrawn at the 14 Aug 2023 hearing
13 Apr 2023Turbo Vision Pte Ltd investmentS$3m term loan; S$20m new shares; options of S$10m (1-year, non-transferable) and S$20m (3-year, transferable)Not completed
6 Jul 2023YNEC–Turbo Vision JV agreement (Yongnam 2023 Pte Ltd, 30%)—Never commenced business; struck off 31 May 2024
2,023Malaysian fabrication facility shutdownOpex reductionImplemented
Nov 2023 – Aug 2024JM realisation programme: strut sales, contract novations, Malaysian land saleReduce secured bank debt; preserve project continuity for ownersImplemented (see Section 11)
1 Aug 2024Applications for discharge from JM and winding upStatutory JM objectives assessed as not achievableGranted 23 Aug 2024
13 Nov 2024Delisting applicationDebts exceed assets; no shareholder distribution expectedApproved 18 Nov 2024; effective 2 Dec 2024

ESG commitments, cost programmes and medium-term targets

ESG: no quantified emissions or sustainability-linked targets were identified in the sources reviewed.

Medium-term financial targets or guidance: none were ever issued. Each results announcement stated that no forecast or prospect statement had previously been disclosed (R22; H23).

Current strategy: the only operative "strategy" is the liquidators' statutory mandate to realise assets and distribute proceeds to creditors in order of priority.

Products & Services

Yongnam did not sell catalogued products with list prices. Its "products" were engineered systems and services delivered under contract, so the catalogue below is organised by business line and supported by named flagship projects. Pricing models were not publicly disclosed beyond the contract structures described.

Structural Steelworks

OfferingDescription / capabilitiesTarget customerFlagship references (year of award, contract value where disclosed)
Structural steel detailing and engineering coordinationIn-house detailers and engineers producing shop drawings and connection design; value engineeringMain contractors, design-and-build contractorsIntegral to all steel contracts (AR22)
Heavy steel fabricationTwo yards (Tuas, Singapore; Nusajaya, Johor) with combined 84,000 t/yr capacity; CE-marked to EN 1090 EXC4; SSSS S1 accreditationMain contractors on landmark buildings and infrastructureMBS SkyPark (2008, S$50.3m with JFE Engineering); Gardens by the Bay cooled conservatories (2009); Singapore Sports Hub (2011, S$75.0m); National Art Gallery (2011, S$50.0m); Marina One (2013, S$168m, then a record) (SGX)
Steel erectionRigging, crane operations (group owned cranes) and site installationAs aboveJewel Changi Airport and Senoko Food Hub (completed end FY2017) (EDGE)
Long-span aviation structuresAirport terminal roofs and hangarsAirport developers / contractorsSuvarnabhumi Airport; Delhi T3 (2008, S$70m); Mumbai T2 (2010, S$75.5m); Bangalore T2 (key FY2020 contributor) (AR22; SGX; R20)
Institutional and civic buildingsHospitals, government buildings, sports centresMain contractors on public projectsSingapore General Hospital (H9A); ICA Building (sub-contract from Penta-Ocean, Nov 2020); Punggol Regional Sports Centre; Mandai Crematorium expansion (AR22; SGX Jun 2024)
Industrial and logistics buildingsFactories, logistics hubsIndustrial developers / contractorsJTC Logistics Hub; JTC North Coast; Shimano factory (FY2020 contributors) (R20)
MRT station steel structuresLink bridges, entrances, roofs, protection enclosuresRail JV contractorsJ109 Jurong Region Line, three stations (scheduled completion 2026) (AR22)

Specialist Civil Engineering

OfferingDescription / capabilitiesTarget customerFlagship references
Modular Strutting SystemProprietary reusable steel strut system introduced in 1995. Described by the company as the industry's de facto cost-effective temporary support for deep excavations, and the first independently certified for reusability, with BCA-compliant traceability (AR22).Tunnel/station contractors, basement buildersMRT Downtown Line 2/3, Circle Line, Thomson-East Coast Line; MCE cofferdam in the open sea at Marina Bay (AR22)
Earth Retaining & Stabilising Systems (ERSS) / ELSDesign, supply, installation and removal of sheet piles, soldier piles, struts and walersSingapore and Hong Kong civil contractorsN111 (Ssangyong E&C, Dec 2019); C190 Integrated Train Testing Centre; Central Kowloon Route, Trunk Road T2, Tung Chung New Town Extension, HK–Shenzhen Innovation & Technology Park (AR22; SGX Aug 2024)
Pipe-pile cofferdamsLarge-diameter pipe pile cofferdam systemsRail and tunnel contractorsCR102 Cross Island Line (targeted 2027) (AR22)
Traffic and working deckingTemporary road decking over excavationsRoad/rail contractorsN103/N105/N111 subcontracts; Jurong Region Line decking (AR22; JM Jul 2024)
Temporary pedestrian overhead bridgesFabricated temporary footbridgesRoad tunnel contractorsN105, Revenue House to Royal Square (Penta-Bachy JV, Nov 2019) (SGX Aug 2024)
Tunnel temporary worksStruts, sheet piles and soldier piles for bored-tunnel launch shafts and cross passagesAirport rail contractorsChangi MRT T316 twin bored tunnels to T5 (expected completion 2024) (AR22)
Australian temporary worksStrutting/temporary works on Victorian infrastructureAustralian contractorsMelbourne Metro; West Gate Tunnel (AR22 key executive profiles; EDGE May 2019)

Mechanical Engineering

OfferingDescriptionFlagship references
HRSG non-pressure partsSupply and fabrication for combined-cycle power plantsTwo Middle East power plants in Qatar and Egypt (completed FY2016) (EDGE May 2017)
Conveyor and plant structuresBelt conveyor structuresS$21.3m belt conveyor structure, Malaysia (Aug 2012) (SGX)
Power plant worksVia Jiwa Harmoni Offshore Sdn Bhd3 × 700MW coal-fired plant, Tanjung Bin, Johor (litigation with Ishi Power 2007–2010) (SGX)

Design and Build

OfferingDescriptionFlagship references
Turnkey industrial/commercial buildingsDesign and construction of steel-framed buildingsLight industrial development at Kallang Junction (completed end FY2017) (EDGE); four-storey regional HQ and two-storey production facility at Tampines Industrial Crescent (completed FY2019/20) (R20)

Main contracting through joint ventures

JVScopeValueStatus
Leighton–Yongnam JV (30%)N103: design and construction of 640m twin three-lane vehicular tunnels, underpinning of an expressway flyover, facility building and ramps; started 2H2019, planned completion 2026S$553.8mLeighton terminated the JV deed and works were novated, Dec 2023 (SGX)
Daewoo–Yongnam JVJ109 Jurong Region Line: three stations (Toh Guan, Jurong Town Hall, Pandan Reservoir) and viaductsS$320.4mYNEC sub-contract to the JV novated to Aztec Steel effective 1 May 2024 (SGX 30 Jul 2024)
Yongnam–CAPE–JGC consortiumHanthawaddy International Airport concession, Myanmar—Selected as tenderer Oct 2014; framework agreement Feb 2016; update Feb 2018; no evidence of financial close (SGX)

Financial Narrative

Data integrity flags.

  1. FY2022 figures are taken from the unaudited R22 announcement except where AR22 (audited) is cited. AR22's five-year summary agrees on revenue, loss before tax and loss after tax, but the audited FY2022 financial review shows G&A of S$17.1m (vs S$8.6m in R22, reflecting reclassification) and operating cash flow of S$18.5m (vs S$19.9m in R22).

  2. FY2020 income statement lines are from R20 (unaudited) except loss after tax, loss per share, shareholders' equity and NAV, which are audited values from AR22. The company announced "material differences" between its unaudited and audited FY2020 figures (SGX, 14 Jul 2021). The audited FY2020 loss after tax was S$77.8m vs S$60.4m unaudited, a difference consistent with a write-off of about S$17.4m of deferred tax assets.

  3. FY2018 figures come from AR22's five-year summary and NR18. Several FY2018 lines are not available.

  4. EBITDA, ratios and margins are derived by this analyst from disclosed line items.

Income statement

FY2018 attributable loss is derived from basic LPS (9.76 cents) × 522.6m weighted shares. FY2020 attributable loss is derived from audited loss after tax of S$77.83m less the unaudited NCI share of S$0.18m. FY2018 DPS: no dividend was identified in the announcement index for that year. The last dividend-related announcement in the index is dated April 2014 (SGX).

FY2019–FY2020 exceptional items were embedded in G&A (e.g., S$17.4m restructuring costs and strut disposal losses in FY2019) rather than shown separately (R20). FY2020 taxation shown is the unaudited credit; audited taxation was lower by about S$17.5m.

Margins (%) — derived

Revenue CAGR: FY2018–FY2022: -3.3% a year. FY2019–FY2022: -10.4% a year. FY2017 (S$306.7m) to FY2022: -14.4% a year (derived from NR17, AR22).

Income statement commentary. The decisive feature of Yongnam's last five reported years is a persistently negative gross margin. The group lost money at the project level before overheads and interest in every year from FY2018 to FY2022. The drivers changed over time:

FY2018: provisions for lower negotiated variation orders on two structural steel projects and lower margins on Thomson MRT strutting work (NR18; EDGE).

FY2019: low fabrication and strutting utilisation, plus S$17.4m of restructuring costs and losses on disposal of strut assets booked in G&A (R20).

FY2020: the circuit breaker halted Singapore sites for about five months, Malaysian movement controls cut factory utilisation, and margins on delayed projects were revised down. Gross loss tripled to S$44.4m on revenue down 52.7% (R20).

FY2021–FY2022: revenue recovered, but contracts priced before COVID-19 absorbed energy, steel and labour inflation linked partly to the Russia–Ukraine war (AR22 CEO message).

The only positive EBITDA years (FY2021: S$10.5m; FY2022: S$2.1m) were far too small to service finance costs of S$10–12m a year. In FY2022, minority interests booked a S$8.2m profit while owners absorbed a S$43.9m loss (R22), which points to profitable non-wholly-owned JV interests coexisting with deep losses in wholly owned operations. Government COVID-19 support (Job Support Scheme and levy rebates of S$5.9m in FY2020) temporarily flattered G&A (R20) and faded by FY2022.

Balance sheet

FY2018 cash is the FY2019 opening balance (R20). FY2020 total equity is the audited 1 January 2021 balance per R22. No goodwill or intangibles were presented in the balance sheets reviewed.

FY2020 total assets are unaudited (R20) and include S$17.4m of deferred tax assets that the audited accounts appear to have written off. The debt split is derived from the condensed balance sheets (R20, R22) and differs from the AR22 summary basis by S$5–10m in FY2020–FY2022 owing to presentation differences.

1H2023 balance sheet (H23): total assets S$284.5m; cash S$2.67m; borrowings S$101.0m (all current); lease liabilities S$39.8m; convertible bonds S$5.45m; net current liabilities S$130.2m; total equity S$46.0m; NAV per share 6.62 cents; net gearing 2.26×. The S$2.5m restricted bank balance was released, and borrowings rose after a financial institution called an advance payment bond.

Balance sheet commentary. Shareholders' equity fell from S$304.3m at end FY2017 to S$59.8m at end FY2022, an 80% erosion in five years (AR22). PPE shrank by S$130m over FY2018–FY2022 through depreciation, disposals of low-utilisation struts to raise cash, and a S$6.5m impairment of Malaysian freehold land in FY2022. Net debt stayed broadly flat in absolute terms at S$125–170m. Leverage therefore rose almost entirely because equity was being destroyed, not because debt was added.

The reclassification of all bank borrowings to current at end FY2022 (S$96.4m current, nil non-current, vs S$63.1m non-current a year earlier) reflected defaults on bank and debt obligations, as EY noted in its disclaimer (AR22). This was the accounting signal of insolvency. The final reported cash balance of about S$2m against S$217m of current liabilities left no liquidity buffer.

Cash flow

Source: R20 and R22 cash flow statements. Interest paid is classified within operating cash flow in the company's statements. AR22 reports audited FY2022 OCF of S$18.5m.

1H2023 (H23): operating cash flow -S$1.70m (1H2022: +S$12.26m); capex -S$6.33m; new borrowings +S$11.41m; repayments -S$6.48m; lease payments -S$3.92m.

Cash flow commentary. Operating cash flow was flattered in FY2019 and FY2020 by liquidating working capital: contract assets fell by S$34m in FY2020 and inventories were run down (R20). It was not driven by underlying earnings. After deducting lease payments, which are economically part of the cost of maintaining the strut fleet and yards, free cash flow was negative in every year: -S$4.0m (FY2019), +S$1.0m (FY2020), -S$26.5m (FY2021) and -S$4.7m (FY2022), all derived. The group funded itself by selling assets (S$47m of PPE disposal proceeds over four years), issuing convertible bonds and placing equity at falling prices. By 1H2023 operating cash flow had turned negative.

Ratios — derived

Net debt / EBITDA: not meaningful in FY2019–FY2020 (negative EBITDA); 14.1× in FY2021 and 63.8× in FY2022 (derived). Cash conversion cycle: not computed. Cost-of-sales-based payables and inventory days are distorted by strut-fleet consumption accounting and by the absence of a full FY2022 receivables ageing in the sources reviewed.

Ratio commentary. Every solvency metric deteriorated steadily from FY2019. By FY2022, EBITDA covered only 0.17× of finance costs, the current ratio was 0.41×, and net debt was roughly 64 times EBITDA. ROE was negative in all five years, and the FY2020 and FY2022 losses each consumed about half of average equity. Asset turnover of 0.2–0.5× is very low for a contractor and reflects the heavy owned asset base. Asset-heavy sub-contracting financed with debt was the structural flaw behind the collapse.

Order book

Sources: NR18; R20; AR22. Order book was S$152m at end FY2017 (NR17) and S$363.3m at 30 June 2023 (H23).

A sizeable order book did not protect Yongnam because the backlog was largely unprofitable. Contracts won in 2018–2020, during an industry trough and before COVID-19, were priced before the post-2021 surge in costs. Management said in AR22 that margins on pre-pandemic contracts had been adversely impacted. Executing the S$543m backlog therefore deepened losses. By 1H2023 management acknowledged that financial difficulty was making new wins much harder (H23).

Longer-run context: revenue and attributable result, FY2014–FY2017

FY2015 and FY2016 year-end order books are not available in the sources reviewed and are entered as 0.0 placeholders; they should not be read as zero backlog. Order book was S$302m at 30 Sep 2016 (SGX profit warning, 21 Feb 2017). FY2013 net profit was S$5.5m and FY2013 revenue was about S$361.8m, derived from the 41.4% FY2014 decline (EDGE).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Group Entities

EntityCountryRole (as understood)Status (latest known)

Yongnam Holdings Limited

Singapore

Listed holding company

In liquidation since 23 Aug 2024; delisted 2 Dec 2024

Yongnam Engineering & Construction (Private) Limited (YNEC)

Singapore

Key operating subsidiary (fabrication, strutting, contracting)

In liquidation since 23 Aug 2024

YNE Project Engineering Pte Ltd

Singapore

Project engineering

—

Yongnam Development Pte Ltd

Singapore

Property/development holding

—

Yongnam Investment Pte Ltd

Singapore

Investment holding

—

Yongnam Engineering Sdn Bhd (YESB)

Malaysia

Nusajaya fabrication facility operator

Creditors' voluntary winding up (KPMG Malaysia) from Feb 2024

Yongnam Engineering & Construction Sdn Bhd

Malaysia

Malaysian contracting (est. May 2015)

—

Jiwa Harmoni Offshore Sdn Bhd

Malaysia

Mechanical/plant works (Tanjung Bin power plant litigation 2007–2010)

—

Yongnam Steel Work System Engineering (Shanghai) Co. Ltd

PRC

Steelwork systems

—

Yongnam Steel Work System Engineering (Jinjiang) Co. Ltd

PRC

Steelwork systems

—

Yongnam Engineering (HK) Limited

Hong Kong

Hong Kong ELS/strutting operations

—

Yongnam Engineering & Construction (Thailand) Ltd

Thailand

Regional contracting

—

Yongnam Myanmar Co., Limited

Myanmar

Est. Dec 2015 for Hanthawaddy airport pursuit

—

Yongnam – Jian Huang Joint Venture

Singapore

Contracting JV

—

Leighton–Yongnam JV (30%)

Singapore

N103 main contract

JV deed terminated by Leighton, Dec 2023

Daewoo–Yongnam JV

Singapore

J109 main contract

Sub-contract novated to Aztec Steel, Jul 2024

Yongnam 2023 Pte Ltd (30%, associate)

Singapore

JV with Turbo Vision, incorporated 12 Jul 2023

Struck off 31 May 2024 (never commenced business)

“—” = not publicly disclosed.

Business Lines

Business line (SGD Mn)FY2019FY2020FY2021FY2022

Structural steelworks

70.6946.2346.0849.78

Specialist civil engineering

92.9744.3971.4191.33

Mechanical engineering

0.090.030.000.05

Design and build

26.011.200.000.04

Others

6.521.014.420.00

Total revenue

196.2792.85121.91141.20

Revenue by Segment (%) and Segment Margins & Growth (%)

Business line metric (%)FY2019FY2020FY2021FY2022

Structural steelworks share of revenue

36.049.837.835.3

Specialist civil engineering share of revenue

47.447.858.664.7

Design and build share of revenue

13.31.30.00.0

Structural steelworks YoY growth

0.0-34.6-0.38.0

Specialist civil engineering YoY growth

0.0-52.360.927.9

Results by Segment

Geographic segment result (SGD Mn)FY2019FY2020FY2021FY2022

Singapore segment result

-43.99-49.77-13.42-13.43

Rest of Asia Pacific segment result

-1.11-11.05-6.91-10.64

Eliminations

-1.990.822.840.69

Group segment result

-47.08-60.00-17.49-23.38

Geographic segment margin (%)

Geographic segment margin (%)FY2019FY2020FY2021FY2022

Singapore result / Singapore external revenue

-31.8-78.0-13.4-12.9

Rest of Asia Pacific result / RoAP external revenue

-1.9-38.0-32.1-28.9

Business Lines (FY2016–FY2018)

Business line (SGD Mn)FY2016FY2017FY2018

Structural steelworks

215.6196.281.6

Specialist civil engineering

66.289.064.3

Mechanical engineering

32.11.74.5

Design and build

7.519.811.0

Total revenue

321.4306.7161.4

Revenue by Segment

Metric (SGD Mn)1H20221H2023

Structural steelworks revenue

28.0017.08

Specialist civil engineering revenue

46.6453.63

Others revenue

0.06-0.02

Total revenue

74.7070.69

Singapore external revenue

54.0742.80

Rest of Asia Pacific external revenue

20.6327.89

Singapore segment result

-2.56-0.81

Rest of Asia Pacific segment result

-0.46-6.32

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Income Statement and Per-Share Data

Metric (SGD Mn)FY2018FY2019FY2020FY2021FY2022

Revenue

161.45196.2792.85121.91141.20

Gross profit (loss)

-45.90-14.84-44.37-4.09-8.48

Loss before tax

-66.05-59.56-72.31-27.15-35.60

Loss after tax

-54.21-54.70-77.83-27.09-35.72

Net loss attributable to owners

-51.00-53.76-78.00-27.24-43.89

Basic and diluted EPS (S cents)

-9.76-10.29-14.93-4.63-6.40

Dividend per share (S cents)

0.000.000.000.000.00

Income Statement

Metric (SGD Mn)FY2019FY2020FY2021FY2022

Other income

1.672.153.462.16

General and administrative expenses (unaudited presentation)

-33.92-17.41-5.56-8.55

Finance costs

-12.90-12.32-10.21-12.23

Exceptional items (as separately presented)

0.000.00-11.30-8.52

Depreciation

33.0235.9327.4425.51

Operating result (group segment result, EBIT proxy)

-47.08-60.00-17.49-23.38

EBITDA (derived: LBT + finance costs − interest income + depreciation)

-13.66-24.0710.502.14

Taxation

4.8611.960.06-0.13

Margin (%)

Margin (%)FY2018FY2019FY2020FY2021FY2022

Gross margin

-28.4-7.6-47.8-3.4-6.0

Net margin (loss after tax / revenue)

-33.6-27.9-83.8-22.2-25.3

Margin (%) (FY2019–FY2022)

Margin (%)FY2019FY2020FY2021FY2022

Operating margin (segment result / revenue)

-24.0-64.6-14.3-16.6

EBITDA margin

-7.0-25.98.61.5

Balance Sheet and Per-Share Data

Metric (SGD Mn)FY2018FY2019FY2020FY2021FY2022

Property, plant and equipment

314.80268.68251.24215.03184.59

Cash and bank balances

14.269.127.932.912.09

Total borrowings incl. leases and convertibles (AR22 summary basis)

140.07178.98164.47151.27138.56

Net debt (derived: borrowings − cash)

125.81169.87156.54148.36136.47

Shareholders' equity

253.81199.85121.48101.8959.81

Total equity incl. non-controlling interests

245.66190.75112.5693.1259.20

Goodwill and intangibles

0.000.000.000.000.00

NAV per share (S cents)

48.5738.2423.2515.868.50

Net gearing (company-reported, times)

0.510.620.901.121.65

Balance Sheet

Metric (SGD Mn)FY2019FY2020FY2021FY2022

Total assets

461.99402.54350.87310.22

Current assets

139.7489.3590.2087.75

Current liabilities

202.64164.04155.01216.61

Working capital (current assets − current liabilities)

-62.90-74.69-64.81-128.86

Debt due within one year (bank, HP, leases, bonds/CBs)

110.3866.2757.70109.90

Debt due after one year (bank, HP, leases, bonds/CBs)

68.60108.46102.7434.41

Contract assets

70.5836.5745.0442.69

Trade creditors

58.5150.4152.9360.79

Cash Flow

Metric (SGD Mn)FY2019FY2020FY2021FY2022

Operating cash flow before working capital

7.67-19.3819.3011.03

Net operating cash flow

29.1231.966.5519.88

Capital expenditure (purchase of PPE)

-26.95-22.91-20.77-13.29

Free cash flow (derived: OCF − capex)

2.169.05-14.216.59

Proceeds from disposal of PPE

12.693.4222.159.19

Interest paid

-12.04-10.78-9.25-10.96

Lease payments

-6.16-8.04-12.32-11.27

Equity issued

0.000.005.410.00

Convertible bonds issued

12.500.000.000.00

Dividends paid

0.000.000.000.00

Share buybacks

0.000.000.000.00

Returns & Leverage Ratios (%)

RatioFY2018FY2019FY2020FY2021FY2022

ROE (%) — attributable loss / average shareholders' equity

-18.3-23.7-48.5-24.4-54.3

Net gearing (×, company-reported)

0.510.620.901.121.65

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2019FY2020FY2021FY2022

ROA (%) — loss after tax / year-end total assets

-11.8-19.3-7.7-11.5

Pre-tax ROIC (%) — EBIT / (total equity + net debt)

-13.1-22.3-7.2-11.9

Current ratio (×)

0.690.540.580.41

Debt / total equity (×, AR22 borrowings basis)

0.941.461.622.34

Interest coverage (×) — EBIT / finance costs

-3.65-4.87-1.71-1.91

EBITDA / finance costs (×)

-1.06-1.951.030.17

Asset turnover (×) — revenue / year-end total assets

0.420.230.350.46

Key Financials and Financial Ratios (x)

Metric (SGD Mn)FY2018FY2019FY2020FY2021FY2022

Order book at year end

366.0405.7543.0464.3396.5

Order book / revenue (×, derived)

2.272.075.853.812.81

Income Statement (FY2014–FY2017)

Metric (SGD Mn)FY2014FY2015FY2016FY2017

Revenue

212.0269.6321.4306.7

Net loss attributable to owners

-8.5-3.3-31.6-15.8

Order book at year end

405.00.00.0152.0

Revenue by Region

Region (SGD Mn)FY2019FY2020FY2021FY2022

Singapore

138.4663.80100.42104.37

Rest of Asia Pacific

57.8229.0521.4936.83

Total

196.2792.85121.91141.20

Revenue by Region (%) and Region Margins & Growth (%)

Region metric (%)FY2019FY2020FY2021FY2022

Singapore share of revenue

70.568.782.473.9

Rest of Asia Pacific share of revenue

29.531.317.626.1

Singapore YoY growth

0.0-53.957.43.9

Rest of Asia Pacific YoY growth

0.0-49.8-26.071.4

Business Lines — Structural steelworks

Business lineSingaporeRest of Asia Pacific

Structural steelworks

Core: hospitals, ICA, sports centres, JTC hubs, MRT station steel

India (Bangalore T2, earlier Delhi and Mumbai); Malaysia; earlier Middle East

Specialist civil engineering

Core: Changi T5/T316, N103/N105/N111, CR102, C190, J109

Hong Kong (CKR, Trunk Road T2, TCNTE, HSITP, LRT Tin Wing); Australia (Victoria)

Design and build

Tampines, Kallang (to FY2019)

—

Mechanical engineering

Minimal

Qatar, Egypt (to FY2016); Malaysia

“—” = not publicly disclosed.

Share Price History

DatePrice / eventSource

Jan 2007

Placement at S$0.161 (pre-2015 consolidation basis)

SGX

May 2007

Placement at S$0.33 (pre-consolidation basis)

SGX

Oct 2017

Placement at S$0.255

SGX

1 Mar 2018

Close S$0.30

EDGE

15 May 2018

Close S$0.31

EDGE

28 Feb 2019

Close S$0.17

EDGE

May 2021

Placement at S$0.076

SGX

22 Nov 2022

Last full trading day; VWAP S$0.0254; last close S$0.026

UEM; Investing.com

Jan 2023

Proposed UEM subscription price S$0.018 (29.1% discount to VWAP)

UEM

2 Dec 2024

Delisted; no expected value to shareholders

LIQ

Valuation Snapshot

MultipleValueBasis

Market capitalisation

S$18.3m

703.94m shares

P/B

0.31×

FY2022 NAV 8.50 cents (R22)

Enterprise value

≈S$154.8m

Market cap + FY2022 net debt S$136.5m (AR22 basis)

EV/Sales

≈1.10×

FY2022 revenue S$141.2m

EV/EBITDA

≈72×

FY2022 derived EBITDA S$2.14m

Share Count (million shares)

Metric (million shares)FY2018FY2019FY2020FY2021FY2022

Issued shares at year end

522.60522.60522.60642.54703.94

Unissued shares under convertible bonds

0.0069.8369.83164.80103.40

Analyst Conclusions

Guidance and consensus

There is no management guidance and no consensus. The company is in compulsory liquidation, its shares are delisted, and no financial statements have been published since 1H2023. The relevant "outlook" is the liquidation outcome for creditors. The liquidators' statements of affairs, presented on 11 November 2024, showed liabilities far exceeding assets. They indicated no distribution to shareholders, and the size of any distribution to unsecured creditors has not been disclosed (LIQ).

Bull-case arguments (residual recovery perspective, for creditors)

  1. Tangible collateral base: at 30 Jun 2023 the group held PPE of S$174.1m, including S$130.6m of steel beams and columns and S$20.1m of freehold land (H23). Even at a deep discount, steel and land realisations could repay a meaningful share of secured bank debt (S$85.2m secured at 1H2023).

  2. Liability transfer through novation: the 2023–2024 novations moved ongoing contract obligations and defaults (from defined effective dates) to Aztec Steel and other parties. This may have reduced liquidated damages and completion claims against the estate (SGX novation announcements).

  3. Strong end-market for recovered assets: record Singapore construction demand (S$50.5bn in 2025) and rising civil engineering demand (BCA) should support resale prices for strutting and decking steel.

Bear-case arguments

  1. Structural deficiency: the liquidators' statements of affairs showed debts far exceeding assets (LIQ, 13 Nov 2024). Equity is worthless, and unsecured recoveries are likely to be low.

  2. Secured priority and realisation discounts: UOB and the Maybank syndicate rank ahead of trade creditors. Book values were never tested by an audit opinion (FY2022 disclaimer), and realisation-basis adjustments flagged by EY were never booked (AR22).

  3. Contingent claims: Malaysian landlord, supplier and service-provider suits, bond calls and main-contractor back-charges may dilute the unsecured pool (SGX).

Key monitorables (next 12 months)

MonitorableWhy it matters
Liquidators' reports to the Committee of Inspection / creditorsRealisation proceeds and dividend prospects
Completion of the YESB (Malaysia) liquidationOutcome of Malaysian claims and asset sales
Any proceedings against former officers or claw-back actionsPotential additional recoveries (none disclosed to date)
Dissolution of company and YNECFinal closure of the estate
Aztec Steel's execution of novated contractsContinuity of Singapore temporary works and steelwork capacity
Singapore T5, MBS and CRL awardsIndicates demand for capacity formerly supplied by Yongnam

Analyst verdict

Yongnam Holdings is a case study in how a technically respected specialist contractor can be destroyed by its capital structure and contract-pricing discipline rather than by a lack of capability or demand. For two decades it delivered some of Singapore's most demanding steel structures and pioneered a reusable strutting system that became standard practice in deep excavations. These were real competitive advantages, and they appear in a track record that main contractors and public owners trusted.

The financial record from FY2014 tells a different story. Revenue halved from more than S$300m in FY2016–FY2017 to S$92.9m in FY2020, and recovered only to S$141.2m in FY2022. Gross margins were negative in every year from FY2018 to FY2022. Equity fell from S$304m to S$60m in five years, while net debt stayed at S$125–170m. Management's recurring explanation, unabsorbed overheads, was accurate but never resolved. The asset base of two fabrication yards and a large owned strut fleet, financed by bank loans and leases, was sized for a peak that did not return in time.

COVID-19 was the proximate trigger, and post-2021 inflation on fixed-price contracts the coup de grâce. The rescue sequence — convertible bonds, discounted placements, the UEM and then Turbo Vision term sheets, and creditor schemes — was too small and too late, and secured lenders ultimately chose judicial management. The FY2022 disclaimer of opinion and the 2024 novation of virtually the entire order book to a competitor confirmed that the enterprise value had migrated elsewhere.

For investors the conclusion is final: equity holders were wiped out, and the shares were delisted in December 2024. For creditors, recovery depends on steel and land realisations whose values were never audited on a realisation basis. For industry observers, the lesson is that in cyclical construction niches, order-book size is no substitute for margin quality, liquidity and conservative leverage.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameTitleAppointedAge (Apr 2023)Background / educationFY2022 total remuneration (SGD K)Mix

Seow Soon Yong

Managing Director & CEO; also performed the role of Chairman

19 Oct 1994

68

Joined Yongnam 1978 (marketing, project and general management); CEO since 1994; pioneered the Modular Strutting System

347

89% salary, 11% other

Siau Sun King

Executive Director (Malaysia operations; Mechanical Engineering Division)

19 Oct 1994

75

Founding member; Mechanical Engineering, Ngee Ann Polytechnic; sibling of Seow Soon Yong

240

77% salary, 23% other

Chia Sin Cheng

Executive Director & Finance Director

8 Jan 2007

—

ICAEW Chartered Accountant (1980); Ernst & Young (London, Singapore); 15 years at WBL Corporation; CFO of Singapore Computer Systems; Harvard AMP

280

94% salary, 6% other

Tan Eng Kiat, Dominic

Lead Independent Director; Chair of AC and NC

3 Mar 2008

—

40+ years in construction; rose to Executive Director at Gammon (Malaya); Managing Director of United Engineers Group (retired 2007)

61

100% fees

Lim Ghim Siew, Henry

Independent Director; Chair of RC

15 Oct 2002

—

Owner of G. S. Lim & Partners; LLB (London); called to the English Bar 1992

51

100% fees

Teng Kian Jen, Ben

Independent Director

15 Oct 2020

—

NUS Civil Engineering (Hons); Changi Airport Investments; CNA Integrated Technologies (Dubai); Abu Dhabi Airports (Midfield Terminal); MD of Vector Infotech

48

100% fees

“—” = not publicly disclosed.

Board of Directors — Seow Soon Hock

NameRoleJoinedNotes

Seow Soon Hock

Production Director

1978

Brother of CEO; FY2022 pay band S$200,001–300,000

Chelvadurai Harendran

Engineering Director

1997

Ex-Ove Arup, Woh Hup, Low Keng Huat; BSc (UCL); CEng, PE (Singapore)

Yang Eun Kyu

Director – Technical (Civil)

2015

40+ years with a Korean contractor; BSc Civil Engineering, Hanyang University

Sik Kay Lee

Project Director

2020

BSc Engineering (Leicester)

Cheong Hock Choon

Project Director (Hong Kong)

1978

Heads Hong Kong operations

Koh Eng Seng

Director – Specialist Civil Engineering

1981

Led MRT, KPE and MCE temporary works

Teo Sheng Kiong

Group Financial Controller

2002 (returned 2007)

1st Class Hons, Lancaster University

Board & Management Changes

DateChangeSource

24 Jul 2020

Retirement of an executive director announced

SGX

15 Oct 2020

Appointment of Teng Kian Jen, Ben, and resignation of another independent director; board committees reconstituted

SGX; AR22

14 Jul 2021

Retirement of a lead independent non-executive director announced; board reconstituted 30 Jul 2021

SGX

11 Aug 2023

Resignation of the Lead Independent Non-Executive Director announced

SGX

Jan–Feb 2024

Applications to SGX-ST for extension of time to fill the Audit Committee vacancy

SGX

14 Aug 2023

Judicial managers (KPMG) assume management

JM

23 Aug 2024

Liquidators (KPMG) appointed; JMs discharged

LIQ

Major Shareholders

HolderShares (as at 21 Jan 2023)% of 703,942,767 shares (derived)

Seow Soon Yong — direct

86,105,00712.23

Seow Soon Yong — deemed (via Yongnam Private Limited)

4,082,1080.58

Siau Sun King — direct

2,784,2170.40

Chia Sin Cheng — direct

3,713,4940.53

Lim Ghim Siew, Henry — direct

225,0000.03

Tan Eng Kiat, Dominic — direct

225,0000.03

Competitive Landscape

Key Competitors

CompetitorTypeSegment overlapRelative positioning vs Yongnam

Aztec Steel Pte Ltd

Private (Singapore)

Structural steelwork; temporary steel works

Replacement sub-contractor on most YNEC novations in 2024. The direct successor in Yongnam's Singapore niche and the clear beneficiary of its exit

KTC Civil Engineering & Construction Pte Ltd

Private (Singapore)

Structural steel; civil engineering

Former MBS partner (2008); established local competitor

JFE Engineering Corporation

Listed parent (JFE Holdings, Japan)

Complex long-span steel structures

Former SkyPark partner; global technical leader with far greater scale

China Construction Steel Structure / CSCEC group

State-owned (PRC)

Mega steel structures across Asia

Scale and balance-sheet advantage on large commercial and aviation steel

BBR Holdings (Singapore)

SGX-listed

Specialist engineering (e.g., post-tensioning, foundations)

Overlap in specialist-contractor positioning

CSC Holdings (Singapore)

Singapore foundation/geotechnical group

Foundations, ERSS and geotechnical works

Overlap in deep-excavation temporary works

Hiap Seng Industries

Singapore

Plant fabrication and engineering

Overlap with the former Mechanical Engineering line

Koh Brothers Eco Engineering

SGX-listed

Civil and infrastructure engineering

Competes for infrastructure packages (as main contractor)

OKP Holdings

SGX-listed

Civil engineering (roads, infrastructure)

Infrastructure main-contract overlap

Hong Kong ELS specialists (unnamed local firms)

Private

Hong Kong excavation and lateral support

Competed for Hong Kong road and MTR temporary works

Competitor Detail

Metric (latest available)Yongnam (FY2022)

Revenue

S$141.2m

Revenue growth

15.8%

Gross margin

-6.0%

Net margin

-25.3%

Fabrication capacity

84,000 t/yr (two yards)

Company Snapshot

$102.4M

Revenue

1994

Founded

SWOT Analysis

Strengths

  • Landmark track record: MBS SkyPark (S$50.3m, 2008), Sports Hub (S$75m, 2011), Marina One (S$168m, 2013), Jewel Changi Airport, Gardens by the Bay, and Delhi, Mumbai and Bangalore airport terminals (SGX; AR22).
  • Certified proprietary strut system: the first independently certified as reusable in Singapore; on the market since 1995 (AR22).
  • Top-tier accreditations: SSSS S1, BCA A2 (General Building and Civil Engineering), EN 1090 EXC4, ISO 9001/14001/45001 and bizSAFE Star (AR22).
  • Large backlog: order book of S$543.0m at FY2020 and S$396.5m at FY2022, equal to 2.8–5.9× revenue (R20; AR22).
  • Fabrication capacity: 84,000 t/yr across Singapore and Johor (AR22).
  • Main-contract JV credentials: N103 (S$553.8m, with Leighton) and J109 (S$320.4m, with Daewoo) (SGX).
  • Deep engineering bench: the Engineering, Civil, Project and Specialist Civil Engineering directors each had about 40–50 years of experience (AR22).

Weaknesses

  • Negative gross margins in every year FY2018–FY2022 (-3.4% to -47.8%) (AR22; R20; R22).
  • Chronic overhead under-absorption cited in FY2016–FY2020 results (EDGE; R20).
  • Leverage: net gearing rose from 0.51× (FY2018) to 1.65× (FY2022) and 2.26× (1H2023) (NR18; R22; H23).
  • Liquidity: cash of S$2.1m against S$216.6m of current liabilities at FY2022 (R22).
  • Governance concentration: combined Chair/CEO, five family members on the payroll (S$716k), and long-tenured independent directors (AR22).
  • Weak financial reporting reliability: material differences between unaudited and audited figures for FY2020 and FY2021, and a disclaimer of opinion for FY2022 (SGX; AR22).
  • Persistent losses: loss-making every year from FY2014 to 1H2023; cumulative attributable losses of about S$254m over FY2018–FY2022 (derived).

Opportunities

  • Singapore construction demand of S$50.5bn in 2025 and S$47–53bn forecast for 2026 (BCA).
  • Civil engineering demand forecast to rise to S$11.6–13.4bn in 2026, from S$7.1bn in 2024 (BCA).
  • The MBS IR extension, a named pursuit target in 2021–2023 (R20; R22; BCA).
  • Changi T5 main construction, where Yongnam held early-works positions (AR22).
  • The Cross Island Line, where CR102 was already secured with completion targeted for 2027 (AR22).
  • Hong Kong road and new-town infrastructure (CKR, T2, TCNTE) (AR22).
  • Equity injection of S$20m plus options from UEM or Turbo Vision (UEM; H23).

Threats

  • Secured creditor enforcement: UOB's JM application on 4 Aug 2023 (H23).
  • Cost inflation from energy, material and labour after 2021 (AR22).
  • JV partner exit: Leighton terminated the N103 JV deed in Dec 2023 (SGX).
  • Malaysian creditor and landlord litigation: RHB Trustees (Axis REIT) suit JA-22NCC-59-08/2023 and multiple Johor court actions (SGX).
  • Loss of contracts to competitors: wholesale novation to Aztec Steel in 2024 (SGX; JM).
  • Equity wipe-out: liquidators expect no distribution to shareholders (LIQ).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
11 Nov 20223Q2022 results releasedLast quarterly results before suspension
23 Nov 2022Trading halt; responses to SGX queries; letter to shareholders on refinancing/investment talksAdmission that funding was needed to service borrowings and remain a going concern
24 Nov 2022Voluntary suspension of shares takes effectShares never traded again
2 Dec 2022Status update (incl. Malaysian subsidiary YESB)Early signal of Malaysian distress
29 Dec 2022; 14 Jan 2023Letter of demand; writ of summons receivedCreditor actions begin
19 Jan 2023Definitive agreements with UEM Assets (S$20m equity, S$10m options, S$3m loan)Proposed rescue and change of control
20–25 Jan 2023IRDA s64/s65 moratoria applications; intention to propose schemesFormal court-supervised restructuring begins
13 Feb 2023Court grants moratoria to 15 May 2023Creditor action stayed
28 Feb 2023FY2022 results: revenue S$141.2m, loss after tax S$35.7m, order book S$396.5mFinal full-year results
12 Apr 2023Annual Report 2022; EY Disclaimer of Opinion; notice of three consecutive years of lossesAuditor unable to conclude on going concern
13 Apr 2023Update on UEM agreements; definitive agreements with Turbo VisionChange of rescue investor
14 Apr 2023Townhall meeting update; receipt of writ (16 Apr)Stakeholder engagement under strain
28 Apr 2023AGM held at Tuas premises; all resolutions passed; Sustainability Report 2022Last AGM
28 Apr / 15 May 2023Applications for leave to convene scheme meeting; moratoria extended to 15 Aug 2023Scheme process continues
11 May 20231Q2023 results—
6 Jul 2023YNEC–Turbo Vision JV agreementJV vehicle created (later struck off)
4 Aug 2023UOB files JM applications; Maybank syndicate supportsSecured lenders take control of the process
11 Aug 20231H2023 results (revenue S$70.7m, loss S$12.7m, order book S$363.3m); Lead Independent Director resignsFinal financial statements ever published
14–15 Aug 2023Moratoria extension withdrawn; JM orders made for company and YNEC (KPMG)Board displaced
Sep – Dec 2023Malaysian suits and letters of demand: RHB Trustees (Axis REIT), Wajdi Mohamad, Shearn Delamore, Linde Malaysia, Soon Kim Engineering, Seng Yap EngineeringMalaysian landlord and creditor claims crystallise
7 Nov 2023Sale of strutsFirst asset realisation
14 Nov 2023Court extends time to summon creditors' meetingProcedural
24 Nov & 18 Dec 2023Novation of structural steelwork and temporary strutting contracts beginsOrder book transferred out
21 Dec 2023Leighton terminates N103 JV deed; tunnel works novatedLoss of flagship main-contract position
Jan 2024Johor court writs and default judgments (Secure Guards; Mahwengkwai; Lee & Tengku Azrina); notices of demand from Trevor George Partnership; Audit Committee vacancy extensionAccumulating claims
26 Jan – 28 Feb 2024Interim liquidators, then liquidators, appointed for YESBMalaysian operations enter liquidation
8 Feb 2024Court extends JM term (to 10 Aug 2024) and time to comply with IRDAJM continues
29 Feb 2024Sale of six freehold land parcels in MalaysiaAsset realisation
Mar – Aug 2024Serial novations to Aztec Steel (structural steel, J109, N105, N111, CR108, T232, ICA and others)Business effectively transferred to a replacement sub-contractor
5 Apr 2024Application for extension of time to announce FY2023 resultsFY2023 results never published
13 May 2024Second sale of strutsAsset realisation
6 Jun 2024Associate Yongnam 2023 Pte Ltd struck offTurbo Vision JV ends
1–6 Aug 2024Applications for discharge from JM and winding upJM rescue objectives abandoned
23 Aug 2024Winding-up orders; KPMG liquidators appointedCompany enters liquidation
11 Nov 2024Creditors' meetings approve Committee of Inspection; statements of affairs show deficiencyConfirms no equity value
18 Nov 2024SGX-ST approves delisting—
2 Dec 2024Delisting effective; CDP-held shares withdrawnEnd of listed status

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

7 charts
Revenue by Segment (FY2019–FY2022): Total revenue fell from SGD 196.3 Mn in FY2019 to SGD 141.2 Mn in FY2022.
Yongnam Holdings Limited — Revenue by Segment (FY2019–FY2022)
Series (SGD Mn)FY2019FY2020FY2021FY2022
Total revenue196.392.9121.9141.2
Structural steelworks70.746.246.149.8
Specialist civil engineering9344.471.491.3
Mechanical engineering0.1000.1
Design and build261.200
Others6.514.40

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.